Sources sought
Ventilation System Components
003-001
Department of Energy, Ucor – DOE Contractor. Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing.
Response deadline
March 20, 2026 at 5:00 PM EDT
Closed 181 days ago. Posted March 11, 2026. Scheduled to archive March 20, 2026.
Description
As published on SAM.gov.
United Cleanup Oak Ridge (UCOR) requires information on ventilation system components with the following specifications for an approximately 475,200 cubic feet volume: Exhaust approximately 60,000 cubic feet per minute (cfm) 7 air changes per hour The system requires the use of HEPA filtration with the following requirements: Nuclear Grade 99.97% Filter Ability to Bag in and Bag Out Pre Filter 0.3 micron Please provide the following for available options: Louvers Physical Dimensions (Diameter or Length x Width x Height and Weight) Installation Means and Price (Frames or Hangers) Prefer gravity damper Fans Physical Dimensions (Diameter or Length x Width x Height and Weight) Installation Means and Price (Frames or Hangers) Electrical Power Requirements (Voltage and Phase) Ducting Installation Means and Price (Hangers) HEPA Filter Units Physical Dimensions (Length x Width x Height and Weight)
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 11, 2026
Sources sought
Due March 20, 2026 at 5:00 PM EDT. SAM.gov, notice 8e0b95adaafc41ab93f1441c3bb4efe6
Points of contact
- Michael FusonMichael.Fuson@orcc.doe.gov(865)385-2336
- Diana OsbourneDiana.Osbourne@orcc.doe.gov8598934104