Vendor, Raleigh, NC
Wells Global, LLC
UEI GAWHH13W8WR9, CAGE 1J0W4
139 awards and $72,704,479 obligated between January 2, 2024 and October 28, 2026, 94% under full and open competition, against 2.7 offers on average where reported. 2 of the awards trace back to a SAM.gov solicitation on this site.
Industries
NAICS on the awards, by dollars.
| Electrical Contractors and Other Wiring Installation ContractorsNAICS 238210 | $70,251,276 |
| Other Technical and Trade SchoolsNAICS 611519 | $969,839 |
| Power and Communication Line and Related Structures ConstructionNAICS 237130 | $880,780 |
| Commercial and Institutional Building ConstructionNAICS 236220 | $602,584 |
How it wins
Awards by competition, set-aside and type.
| Full and Open Competition | 130 |
| Not Competed | 7 |
| Full and Open Competition After Exclusion of Sources | 2 |
| Small Business Set Aside - Total | 2 |
| Delivery Order | 134 |
| Definitive Contract | 2 |
Hear when Wells Global, LLC wins an award and when a contract it holds is about to end.Follow it
Contracts ending soon
Contracts Wells Global, LLC holds whose performance ends in the next 19 months, by published end date. Each one is a recompete to prepare for.
- Ending
- 29
- Obligated so far
- $27,201,866
- Soonest
- October 30, 2026
The 29 contracts, the office behind each one and the dates are in the workspace. See them
Competes with
Vendors selling electrical contractors and other wiring installation contractors to Federal Aviation Administration, by dollars.
| Cusa Consulting LLCHampton, NH | $51,469,219 |
| Sentinel Power Services, LLCCave Creek, AZ | $31,459,196 |
| Urban Electric, Inc.Altamonte Springs, FL | $20,204,990 |
| Quad J Inc.Avon, IN | $19,904,548 |
| C.N.S. Communications, LLCScottsdale, AZ | $12,183,428 |
| Barry Williams Electric Inc.Waco, TX | $9,112,262 |
Awards
The 100 largest of 139 awards, by dollars obligated.
| Contract | Awarding office | Described as | Obligated |
|---|---|---|---|
| 6973GH20F01180Delivery Order, October 30, 2024, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | ZTL Aceps II Phase 2 Standby Power System Modification, DesignNAICS 238210, PSC N061 | $8,102,205 |
| 6973GH20F00619Delivery Order, August 6, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Engineering and Installation Services for the Cleveland Artcc Aceps II Phase INAICS 238210, PSC N061 | $7,935,412 |
| 6973GH25F00480Delivery Order, February 10, 2025, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F11 Funding for Salt Lake City (Slc) Atct/Tracon CPDS Modifications Rev 1- Equipment and Installation Funding Jcn: 25013989 Vendor: Wells GlNAICS 238210, PSC N059 | $5,106,483 |
| 6973GH25F00812Delivery Order, May 19, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Aceps II Phase II - Fabrication and Testing of Mobile Standby Switchgear Trailer, Per Vendor Quote #016-2025 Dated 2/7/25.NAICS 238210, PSC N059 | $3,923,091 |
| 6973GH18F00730Delivery Order, May 13, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Aceps Type II Phase 2 InstallationNAICS 238210, PSC N061 | $2,685,185 |
| 6973GH19F01291Delivery Order, May 21, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Installation Services for the Houston Artcc Aceps II Phase INAICS 238210, PSC N061 | $2,452,460 |
| 6973GH26F00715Delivery Order, April 22, 2026, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Funded Power Cable Replacement and Installation, Site Specific: (Stt) Eld, St. Thomas, Vi, Jcn: 19007437, Per Eld.NAICS 238210, PSC N059 | $2,427,016 |
| 6973GH24F01453Delivery Order, September 5, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Tatalina Eg UpgradeNAICS 238210, PSC N059 | $2,092,590 |
| 6973GH26F00897Delivery Order, May 27, 2026, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Wells Global Will Provide the Manpower, Equipment, Materials, Tools, and Other Necessary Resources to Deliver the Products, Services, and SyNAICS 238210, PSC C1BG | $1,895,603 |
| 6973GH26F00467Delivery Order, February 26, 2026, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F11 - (F&e) Funded Installation/Construction, Site Specific: Norfolk, VA (Orf)eld, Jcn: 1302445, Per Eld, Pmo.NAICS 238210, PSC N059 | $1,882,560 |
| 6973GH26F00784Delivery Order, May 7, 2026, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Develop a Site-Specific Permanent Power Systems Installation Design Package for the Cleveland Artcc (Zob), Utilizing the FAA Aceps Type Ii, NAICS 238210, PSC R425 | $1,827,681 |
| 6973GH24F01016Delivery Order, June 17, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. 2023 Indoor Eg and Diesel FST Baseline Installation Funding for Washington DC (Dcaf) Atct JCN:23007744NAICS 238210, PSC N059 | $1,468,616 |
| 6973GH23F00602Delivery Order, May 12, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Eg Replacement and CPDS Installation at Atln Nemc. JCN 1700177.NAICS 238210, PSC N059 | $1,417,742 |
| 6973GH23F01934Delivery Order, August 15, 2024, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F35 Bil Funding for Installation at Andrews AFB Adw CPDS JCN 1700009NAICS 238210, PSC N059 | $1,395,185 |
| 6973GH19F00563Delivery Order, August 12, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Aceps Type II Phase 1 Site Specific Design, CPC Reduction and Installation for the Kansas City ArtccNAICS 238210, PSC N061 | $1,393,055 |
| 6973GH24F00599Delivery Order, April 2, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil (Zau, Zmp, Zob) Asco Ats Replacement and (C90) Tracon RCSTS Test Bench Installation.NAICS 238210, PSC N059 | $1,336,041 |
| 6973GH26F00487Delivery Order, February 26, 2026, Full and Open Competition, 4 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Critical Power Distribution System (Cpds) Installation at San Jaun, PR (Zsu) Cerap ArtccNAICS 238210, PSC N059 | $1,307,039 |
| 6973GH24F00793Delivery Order, May 2, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F11 F&e Funding in the Amount of $1,224,850.00 for JCN 24011247 Norfolk VA Esa, Eld for Orf Malsr Cable Construction. 24-PC-10019.NAICS 238210, PSC N059 | $1,258,931 |
| 6973GH26F00612Delivery Order, March 27, 2026, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | To Fund the Installation of Super Capacitor InstallationNAICS 238210, PSC N059 | $1,173,865 |
| 6973GH25F01402Delivery Order, September 12, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | (Iija) Funded Site Survey and Travel, Site Specific: Multiple Sites and Jcns, Per LPGBS Pmo. Madison, Wi (Msn)asr9 JCN:23000686 Madison, Wi NAICS 238210, PSC N059 | $1,161,010 |
| 6973GH23F01853Delivery Order, September 17, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F35 Funding for Installation for Chicago (Ord) Atct CPDS Phase II Rev 1 Jcn# 1401417NAICS 238210, PSC N059 | $1,017,989 |
| 6973GH20F01552Delivery Order, September 24, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Dallas Tracon Replace Obsolete Static Switches and the Test Ups and BatteriesNAICS 238210, PSC N061 | $1,000,364 |
| 6973GH26C00165Definitive Contract, August 19, 2026, Full and Open Competition After Exclusion of Sources, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Sampson, NC - Rcag Shelter & Tower Install in Sampson, NC in Accordance with the Sow and Drawings.NAICS 237130, PSC Y1BC | $880,780 |
| 6973GH22F01587Delivery Order, April 30, 2024, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | {bil} Funded Installation to Modernize Essential Power Source at DTW Atct Cpds. JCN 1603915NAICS 238210, PSC N059 | $855,586 |
| 6973GH25F01203Delivery Order, August 5, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F&e Funded Engine Generator Installation, Site Specific: South Bimini (Zbv) Vor, Bahamas-Bhs, JCN:22005476, Per Eld Pmo.NAICS 238210, PSC N059 | $806,951 |
| 6973GH25F00051Delivery Order, October 30, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Modification of Phase I and Phase II Temp System Incorporating Tpscms - Temporary Power Monitoring and Control System, Per Vendor Proposal #NAICS 238210, PSC N059 | $725,244 |
| 6973GH24F00760Delivery Order, May 9, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Electrical Installation at ZLC to Run Power to Fens DC and Cpe Equipment. Contract 6973GH-22-D-00017. Tasks: Electrical Installation of EquiNAICS 238210, PSC N059 | $644,442 |
| 6973GH22F00762Delivery Order, August 27, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Install Aceps Type II Phase 1 System at the Albuquerque Artcc (Zab)NAICS 238210, PSC N059 | $638,916 |
| 6973GH26C00147Definitive Contract, July 8, 2026, Full and Open Competition After Exclusion of Sources, 4 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Replace Vor with Dme Shelter & Antenna at the Natchez, MS (Hez) Dme in Accordance with the Specs and Drawings.NAICS 236220, PSC Y1BC | $602,584 |
| 6973GH25F00822Delivery Order, May 6, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Mobile Power System-Trailer Fabrication Mpsu-5 for CPDS Program OfficeNAICS 238210, PSC N059 | $597,891 |
| 6973GH23F01392Delivery Order, April 8, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funding. Eg Design Funding for the Outdoor Eg with Subbase/Erms/Advanced Metering Project for Fargo, ND (Far) Atct JCN:19003424NAICS 238210, PSC N059 | $550,327 |
| 6973GH24F00709Delivery Order, July 15, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Electrical Installation at Zse to Run Power to Fens DC and Cpe Equipment. Cost Is 775,813. Contract 6973GH-22-D-00017. Tasks: Electrical InsNAICS 238210, PSC N059 | $522,499 |
| 6973GH25F01294Delivery Order, August 25, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Qea Arsr Electrical RefurbishmentNAICS 238210, PSC N059 | $475,647 |
| 6973GH24F00636Delivery Order, April 12, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Aceps II Phase II - Storage and Maintenance Warehouse. Temp Storage Option Rev. 1, Per Wells Global Proposal# 046-2024.NAICS 238210, PSC N059 | $469,286 |
| 6973GH24F00826Delivery Order, May 6, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Issue Funding for Site Survey, Design, and Installation of Diesel FST at Burlington, VT (Btva) Atct, Jcn: 1502985NAICS 238210, PSC N059 | $390,461 |
| 6973GH24F00899Delivery Order, May 21, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil: Issue Funding for Site Survey, Design, and Installation of Outdoor Eg with Subbase Tank at Jackson, Mi (Jxn) Atct, Jcn: 18026477NAICS 238210, PSC N059 | $378,480 |
| 6973GH26F01314Delivery Order, August 21, 2026, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Critical Power Distribution System (Cpds) Modernization Project at Warrenton Command Center (Dcc). Jcn: 25015989NAICS 238210, PSC N059 | $347,435 |
| 6973GH19F01625Delivery Order, February 1, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Indianapolis Artcc Aceps II Phase I RFC06 Water Heater, Water Line Relocation & Drain PanNAICS 238210, PSC N061 | $344,476 |
| 6973GH24F01174Delivery Order, July 29, 2024, Full and Open Competition, 9 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | 2024 Indoor Eg Baseline Site Survey, Design and Install for Anchorage, Ak (Ancd) Asde Jcn: 1702270NAICS 238210, PSC N059 | $340,940 |
| 6973GH24F01356Delivery Order, August 21, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. 2024 Indoor Eg/Erms Baseline Funding for Site Survey, Design, Install for Power System Replacement Project for Bethel, Ak (Betc) NAICS 238210, PSC N059 | $336,067 |
| 6973GH24F01325Delivery Order, August 16, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. Site Survey, Design, & Install Funding for the Outdoor Eg with Subbase Tank Installation for Suitland, MD (Std) Esc Jcn: 22005477NAICS 238210, PSC N059 | $294,248 |
| 6973GH26F00937Delivery Order, July 6, 2026, Not Competed | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Engineering Support Facility (Esf) for Initial Training on New Equipment Being Deployed in the NAS - Funding for Option 4 Year Floor Space aNAICS 611519, PSC U009 | $275,543 |
| 6973GH25F00875Delivery Order, May 15, 2025, Not Competed | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Engineering Support Facility (Esf) for Initial Training on New Equipment Being Deployed in the NAS - Funding for Option 3 Year Floor Space aNAICS 611519, PSC U009 | $265,777 |
| 6973GH24F00346Delivery Order, February 1, 2024, Full and Open Competition, 9 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. Baseline Install Funding and Erms for Washington, D.C. (Dcac) SX GS Jcn: 23007745NAICS 238210, PSC N059 | $263,907 |
| 6973GH24F00347Delivery Order, February 1, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. Baseline Installation Funding for the Eg/Erms Replacement Project for Washington, D.C. (Dcaa) Loc JCN:23007746NAICS 238210, PSC N059 | $262,558 |
| 6973GH24F00898Delivery Order, May 21, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil: Issue Funding for Site Survey, Design, and Installation of Diesel FST at Rockford, Il (Rfda) Atct, Jcn: 22008314NAICS 238210, PSC N059 | $249,808 |
| 6973GH24F00633Delivery Order, April 8, 2024, Not Competed | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Engineering Support Facility (Esf) for Initial Training on New Equipment Being Deployed in the NAS - Funding for Option 2 Year Floor Space aNAICS 611519, PSC U009 | $232,789 |
| 6973GH25F01414Delivery Order, September 18, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Critical Power Distribution System (Cpds) Design for Seattle, Wa (S46) TraconNAICS 238210, PSC N059 | $232,720 |
| 6973GH24F00676Delivery Order, April 23, 2024, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Construction Cost of Ups and the Ups Ancillary Equipment Removal and Installation at the Bismarck, ND (Bis) Asr Per the RFQ-24-12 Bid PackagNAICS 238210, PSC N059 | $212,088 |
| 6973GH26F00021Delivery Order, October 22, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | (Iija) Funded Vor Emergency Restoration, Site Specific: Neah Bay, Wa (Tou)vor, Jcn: 18032189, Per Eld Pmo. Eld F35 Iija Funded Tou Vor Eld SNAICS 238210, PSC N059 | $209,162 |
| 6973GH24F01362Delivery Order, September 6, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funding for LPGBS Design Report for Various Sites at Madison, Wi.NAICS 238210, PSC N059 | $207,705 |
| 6973GH25F00850Delivery Order, May 12, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Anchorage Artcc (Zab) - RCSTS Installation. Per Wells Global Quote# 026-2025, Dated 02/12/2025.NAICS 238210, PSC N059 | $192,096 |
| 6973GH26F00220Delivery Order, December 18, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Provide the Program Manager with the Required Personnel, Materials, Installation, and Services for the Replacement of Twenty-Nine (29) ExistNAICS 238210, PSC N059 | $191,374 |
| 6973GH24F00611Delivery Order, April 1, 2024, Not Competed | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Funding for the Facility Rental and Utilities for the Esf for (9) Months and (1) Set of Ojt BindersNAICS 611519, PSC U009 | $189,837 |
| 6973GH23F00414Delivery Order, June 11, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | New York Tracon (N90) 4TH Eg InstallationNAICS 238210, PSC N059 | $189,341 |
| 6973GH26F00308Delivery Order, January 20, 2026, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Wells Global Is to Provide the Program Manager with the Required Personnel, Materials, Installation, and Services for the Replacement of ThiNAICS 238210, PSC N059 | $182,231 |
| 6973GH25F00687Delivery Order, April 1, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F35 Albuquerque Artcc (Zab) - RCSTS Installation. Per Wells Global Quote# 025-2025, Dated 02/12/2025.NAICS 238210, PSC N059 | $179,438 |
| 6973GH25F00125Delivery Order, November 14, 2024, Full and Open Competition, 4 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Installation of the Supercapacitor at the Mmac, Oklahoma City, OkNAICS 238210, PSC N059 | $174,689 |
| 6973GH23F01074Delivery Order, July 2, 2024, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Construction of Mobile Power Unit-3 (208V) for Oex JCN 22002584NAICS 238210, PSC N059 | $174,518 |
| 6973GH26F00146Delivery Order, December 4, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Design for the Critical Power Distribution System at Washington DC (Dca) Atct.NAICS 238210, PSC N059 | $174,115 |
| 6973GH25F00688Delivery Order, April 1, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F35 Houston Artcc (Zhu)- RCSTS Installation. Per Wells Global Quote# 027-2025 Dated 02/12/2025.NAICS 238210, PSC N059 | $168,872 |
| 6973GH24F01472Delivery Order, September 12, 2024, Full and Open Competition, 6 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. DC Bus Installation Funding for Hutchinson, KS (Hutb) Rcag Jcn: 22005528NAICS 238210, PSC N059 | $161,827 |
| 6973GH24F01492Delivery Order, September 12, 2024, Full and Open Competition, 6 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. 2024 DC Bus Installation Funding for Russell, KS (Rsl) Rcag Jcn: 22005543NAICS 238210, PSC N059 | $161,827 |
| 6973GH24F01499Delivery Order, September 12, 2024, Full and Open Competition, 6 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. 2024 DC Bus Installation Funding for Salina, KS (Slna) SX Jcn: 22005542NAICS 238210, PSC N059 | $161,827 |
| 6973GH26F00707Delivery Order, April 20, 2026, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Wells Global Is to Provide the Program Manager with the Required Personnel, Materials, Installation, and Services to Install the New RCSTS TNAICS 238210, PSC N059 | $158,717 |
| 6973GH18F02109Delivery Order, September 16, 2024, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | 2ND Temporary Power System Set to Support Aceps Type Ii, Phase II Construction ActivitiesNAICS 238210, PSC N061 | $157,943 |
| 6973GH25F00256Delivery Order, December 16, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funded Site Specific LPGBS Installation Gainesville, FL (Gnv) ASR-9 JCN:23000748NAICS 238210, PSC N059 | $154,977 |
| 6973GH24F00263Delivery Order, January 12, 2024, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil (Ztl) Atlanta Artcc - RCSTS Installation at Atlanta. Per Vendor Proposal# 152-2023 Rev 1, Dated 1/3/24.NAICS 238210, PSC N059 | $152,557 |
| 6973GH26F01425Delivery Order, September 15, 2026, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Aceps Ii, Phase 2 Wells Global Is to Replace All the Old Tires on the Trailers of Temp System 1 Mobile Standby Power System at the Zan ArtccNAICS 238210, PSC N059 | $149,959 |
| 6973GH22F01782Delivery Order, June 18, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | ZLC Aceps II Phase 2 Site Specific Design - Change Order to Update the Eg Sizing from KD1250 to KD1500NAICS 238210, PSC N059 | $148,881 |
| 6973GH23F00842Delivery Order, August 5, 2024, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Funding for Lga Malsr Installation at Flushing NyNAICS 238210, PSC N059 | $147,951 |
| 6973GH23F01758Delivery Order, March 28, 2024, Full and Open Competition, 9 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funding, Site Specific Indoor Eg, FST Diesel Installation, Power System Analysis and Erms De-Obligation at Madison, Wi (Msn) Atct JCN:22NAICS 238210, PSC N059 | $144,389 |
| 6973GH25F00852Delivery Order, May 16, 2025, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Funded. Alexandria, La (Aexd) Arsr. Jcn: 1704792 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary EquipmNAICS 238210, PSC N059 | $143,407 |
| 6973GH24F01487Delivery Order, September 12, 2024, Full and Open Competition, 6 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds, 2024 DC Bus Baseline Site Survey, Design, and Installation Funding for Jackson, TN (Mkla) Rcag Jcn: 24015598NAICS 238210, PSC N059 | $131,018 |
| 6973GH24F01333Delivery Order, August 19, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F&e Funding Construction Long Lead Items for at (Orf) Esa Eld, Norfolk, VA JCN 1302445NAICS 238210, PSC N059 | $128,466 |
| 6973GH25F00984Delivery Order, June 11, 2025, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | (Zkc) Kansas City Artcc - Aceps II Phase 2 - F11 Funding for Temp Power Design. Per Wells Global Proposal #065-2025, Dated 5/1/2025.NAICS 238210, PSC N059 | $127,643 |
| 6973GH25F00989Delivery Order, June 12, 2025, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | (Zid) Indianapolis Artcc - Aceps II Phase 2 - F11 Funding for Temp Power Design.NAICS 238210, PSC N059 | $127,635 |
| 6973GH24F01162Delivery Order, August 22, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | RBL Electrical RefurbishmentNAICS 238210, PSC N059 | $113,602 |
| 6973GH24F01530Delivery Order, September 23, 2024, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil (Sct) Tracon - Asco Replacement IDIQ Installation, Per Vendor Proposal #163-2024, Dated 8/26/24.NAICS 238210, PSC N059 | $111,089 |
| 6973GH26F00735Delivery Order, April 27, 2026, Full and Open Competition, 10 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Eg Site Survey Travel and Report Funding for Oceana, VA (Qvr) Arsr Jcn: 26003415NAICS 238210, PSC N059 | $94,614 |
| 6973GH25F00378Delivery Order, January 17, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | (Bil) Funded LPGBS Site Specific: Orlando, FL (Mco) ASR-9 Installation JCN:23000758NAICS 238210, PSC N059 | $91,967 |
| 6973GH25F00886Delivery Order, June 5, 2025, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Funded. Midland, TX (Maf) Asr Jcn: 19002838 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment RNAICS 238210, PSC N059 | $88,347 |
| 6973GH25F00727Delivery Order, April 14, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Funded. This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Beaumont,NAICS 238210, PSC N059 | $82,178 |
| 6973GH23F01432Delivery Order, June 26, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Installation Cost for Electrical Line Distribution Project at Seattle, Wa - Bfi EldNAICS 238210, PSC N059 | $80,995 |
| 6973GH25F00828Delivery Order, May 16, 2025, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Funded. Baton Rouge, La (Btrd) Asr JCN:18066427 This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary EquipmeNAICS 238210, PSC N059 | $80,258 |
| 6973GH23F01714Delivery Order, February 22, 2024, Full and Open Competition, 8 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funding. Eg Site Specific Installation and Erms for Olathe, KS (Moc) OCC JCN:22005529NAICS 238210, PSC N059 | $80,204 |
| 6973GH24F01135Delivery Order, July 23, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funding in the Amount of $78,569.00 for the Albuquerque, NM Zab (Csa) Eld Design Project JCN:23000281.NAICS 238210, PSC N059 | $78,569 |
| 6973GH26F00192Delivery Order, December 11, 2025, Full and Open Competition, 3 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Alternative Energy Systems Site Assessment and Engineering Design Only at Okca RTR and Okcb Rtr, Oklahoma City, OkNAICS 238210, PSC N059 | $74,857 |
| 6973GH25F00716Delivery Order, April 14, 2025, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Funded. This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Abilene, NAICS 238210, PSC N059 | $73,302 |
| 6973GH24F00227Delivery Order, January 22, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Installation Cost for Electrical Line Distribution Project at Westbury, Ny - N90 EldNAICS 238210, PSC N059 | $71,926 |
| 6973GH25F00080Delivery Order, November 7, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil FY2022 Funds Design Project for Kauai Lihue, Hi (Lih) Eld JCN 1706075.NAICS 238210, PSC N059 | $68,063 |
| 6973GH25F00728Delivery Order, April 14, 2025, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Iija Funded. This Unilateral Award Is for the Construction Cost of the Ups and Ups Ancillary Equipment Removal and Installation at Waco, TX NAICS 238210, PSC N059 | $63,161 |
| 6973GH25F00943Delivery Order, June 3, 2025, Full and Open Competition, 4 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F&e Aes Decommissioning and Removal of Relion I-1000 Hydrogen Power Plant for QFZ RCLR in Barro, Ut, Lho Vor in Brigham City, Ut, Ogd RCLR iNAICS 238210, PSC N059 | $61,288 |
| 6973GH24F00914Delivery Order, May 24, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funding in the Amount of $54,228.00 for the Charleston, WV CRW (Csa) Eld Design Project JCN 19007380. 24-PCI-10055.NAICS 238210, PSC N059 | $54,228 |
| 6973GH23F01809Delivery Order, May 8, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds. Ups Freight Cost of Gfe Equipment from Anchorage, Ak to Middleton Island, Ak, Mdo Atcbi. JCN:18065824.NAICS 238210, PSC N059 | $46,970 |
| 6973GH25F00059Delivery Order, October 29, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | F35 Bil CPDS Funding for MDW Chicago Il Atct Geotech & Soil TestingNAICS 238210, PSC N059 | $44,793 |
| 6973GH24F01495Delivery Order, September 11, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | JCN 20014000 F&e Charlotte, NC (Clt) - 4TH Runway Eld Design Project in the Amount of $44,211.00.NAICS 238210, PSC N059 | $44,211 |
| 6973GH24F00939Delivery Order, May 23, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Tatalina, Ak (Tli) Eg Upgrade/Lrss Prime Power Improvement Site SurveyNAICS 238210, PSC N059 | $39,377 |
| 6973GH23F00894Delivery Order, November 19, 2024, Full and Open Competition, 1 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | Bil Funds Site Specific Additional Time and Work for Eld Installation Project at Teterboro, NJ (Teb) Eld JCN:1100216NAICS 238210, PSC N059 | $39,123 |
| 6973GH23F01350Delivery Order, April 16, 2024, Full and Open Competition, 2 offers | 6973GH Franchise Acquisition SVCSFederal Aviation Administration | FST Change Order to Remove the 1000-Gallon Ast Tank and Removing the Piping at Gallup, NM (Gupc) Arsr Jcn: 1500729NAICS 238210, PSC N059 | $38,549 |
- Places of performance
- North CarolinaVirginiaAlaskaTexasFloridaKansasNew MexicoGeorgia
- Product and service codes
- N059 Installation of Equipment: Electrical and Electronic Equipment ComponentsN061 Installation of Equipment: Electric Wire, and Power and Distribution EquipmentC1BG Architect And Engineering- Construction: Electronic And Communications FacilitiesR425 Engineering and Technical ServicesY1BC Construction Of Radar And Navigational FacilitiesU009 Education Services
- Transactions
- 297 across 139 awards