Vendor, Omaha, NE
Nielsen Baumert Engineering, Inc.
UEI HJCMEYKML9H4, CAGE 3FR89
13 awards and $2,353,892 obligated between January 18, 2024 and March 24, 2026, 100% under full and open competition, against 5.0 offers on average where reported.
How it wins
Awards by competition, set-aside and type.
| Full and Open Competition After Exclusion of Sources | 13 |
| Small Business Set Aside - Total | 1 |
| Delivery Order | 12 |
Awards
Every award in the window, by dollars obligated.
| Contract | Awarding office | Described as | Obligated |
|---|---|---|---|
| FA460025F0026Delivery Order, February 24, 2025, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | Design the Replacement of Existing Power and Distribution Switchgear Transformers, Fuses, Enclosures, Relays, Controls, and Cabling in SubstNAICS 541330, PSC C220 | $430,851 |
| FA460024F0155Delivery Order, September 16, 2024, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | Design B1000 East Entrance Vestibule in Accordance with 24-0013 Iaw the Task Order Project Scope.NAICS 541330, PSC C220 | $419,379 |
| FA460024F0142Delivery Order, September 16, 2024, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | AE to Provide All Investigations Necessary to Produce Design Documents for a New West Entrance Vestibule at B1000.NAICS 541330, PSC C220 | $411,757 |
| FA460024F0183Delivery Order, September 26, 2024, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | The Architect-Engineering (A/E) Firm Shall Complete All Work and Services Under This Contract Within the Period Specified in Each Task OrderNAICS 541330, PSC C213 | $287,272 |
| FA460025F0121Delivery Order, September 23, 2025, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | This Is a Project for Designing New Atrium Terrazzo Flooring for B1000 in Accordance with the Sow.NAICS 541330, PSC C211 | $215,810 |
| FA460021F0190Delivery Order, January 18, 2024, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | SGBP 21-0034 B1000 Drainage.NAICS 541330, PSC C1AA | $198,424 |
| FA460025F0084Delivery Order, August 21, 2025, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | AE to Provide All Investigations Necessary to Produce Design Documents Iaw the Sow for Renovation of Space Within B457 for the MTS SchoolhouNAICS 541330, PSC C211 | $127,104 |
| FA460025F0122Delivery Order, September 29, 2025, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | This Project Is to Design All Aspects for Retrofit of Existing General/Flag Officer Suite Within B16 That Is Radio Frequency (Rf) Shielded, NAICS 541330, PSC C219 | $101,872 |
| FA460025F0107Delivery Order, September 19, 2025, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | Design - Repair Cooling Tower B519NAICS 541330, PSC C219 | $79,956 |
| FA460025F0102Delivery Order, September 22, 2025, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | AE to Provide All Investigations Necessary to Produce Complete and Detailed Design Documents Required to Validate Project Design RequirementNAICS 541330, PSC C220 | $66,205 |
| FA460025F0034Delivery Order, March 24, 2025, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | The Objective of This Project Is to Provide Limited Title II Engineering Activities Necessary to Meet the Requirements to Support the USACE NAICS 541330, PSC C220 | $15,261 |
| FA460023F0153Delivery Order, April 8, 2024, Full and Open Competition After Exclusion of Sources | FA4600 55 Cons PKPDepartment of the Air Force | The Architect-Engineering (A/E) Firm Shall Complete All Work and Services Under This Contract Within the Period Specified in Each Task OrderNAICS 541330, PSC C220 | $0 |
| FA460021D0003May 1, 2025, Full and Open Competition After Exclusion of Sources, 5 offers | FA4600 55 Cons PKPDepartment of the Air Force | The Architect-Engineering (A/E) Firm Shall Complete All Work and Services Under This Contract Within the Period Specified in Each Task OrderNAICS 541330, PSC C220 | $0 |
- Places of performance
- Nebraska
- Product and service codes
- C220 Architect And Engineering- General: Structural EngineeringC211 Architect - Engineer Services (including landscaping, interior layout, and designing)C213 A&E Inspection Services (non-construction)C1AA Architect And Engineering- Construction: Office BuildingsC219 Other Architect and Engineering Services
- Transactions
- 25 across 13 awards