Vendor, Greenwood Village, CO, part of Jacobs Solutions, Inc.
Jacobs Engineering Group Inc.
UEI H4G1TWPHKQ67, CAGE 4N5H7
73 awards and $16,104,797 obligated between January 2, 2024 and October 28, 2026, 100% under full and open competition, against 12.0 offers on average where reported.
How it wins
Awards by competition, set-aside and type.
| Full and Open Competition | 73 |
| Delivery Order | 72 |
Hear when Jacobs Engineering Group Inc. wins an award and when a contract it holds is about to end.Follow it
Contracts ending soon
Contracts Jacobs Engineering Group Inc. holds whose performance ends in the next 19 months, by published end date. Each one is a recompete to prepare for.
- Ending
- 24
- Obligated so far
- $11,863,657
- Soonest
- November 1, 2026
The 24 contracts, the office behind each one and the dates are in the workspace. See them
Competes with
Vendors selling engineering services to Federal Highway Administration, by dollars.
| Weris, Inc.Sterling, VA | $40,349,772 |
| Jacobs Engineering Group Inc.Bellevue, WA | $35,488,841 |
| Absg Consulting Inc.Spring, TX | $32,806,490 |
| Rocksol Consulting Group, Inc.Thornton, CO | $26,102,817 |
| WSP USA Inc.Herndon, VA | $20,311,346 |
| Ati, Inc.Columbia, MD | $18,530,528 |
Awards
Every award in the window, by dollars obligated.
| Contract | Awarding office | Described as | Obligated |
|---|---|---|---|
| 69056727F00003NDelivery Order, October 23, 2026, Full and Open Competition | 690567 Western Federal Lands DivFederal Highway Administration | A/E Design for Wy NP Yell 12(4), Northeast Entrance Road, Phase 1NAICS 541330, PSC C1LB | $4,402,031 |
| 6982AF25F00070NDelivery Order, August 25, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NM IHS Navajo (1) Health Facility Improvements - Preliminary Design/Final DesignNAICS 541330, PSC C1LB | $1,390,811 |
| 6982AF26F00073NDelivery Order, July 24, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Wy Build US212(10) Beartooth Highway 0-15% Road DesignNAICS 541330, PSC C1LB | $1,136,711 |
| 6982AF26F00052NDelivery Order, May 12, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az IHS Navajo(1) IHS Health Improvements - Full Design of Az Sites (Sites 1-10)NAICS 541330, PSC C1LB | $1,015,673 |
| 6982AF23F00070NDelivery Order, January 22, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap NWK 10(1) Thornton Avenue Bike Improvements 1. the Purpose of This Modification Is to Extend the Period of Performance (Pop) to MarcNAICS 541330, PSC C1LB | $998,749 |
| 6982AF23F00024NDelivery Order, September 9, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap Mar 223(1) Pierce Point Road Environmental Support (Field Work, Plant Surveys, Memos) the Purpose of This Modification Is to IncorpoNAICS 541330, PSC C1LB | $680,772 |
| 6982AF26F00074NDelivery Order, July 29, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ut Flap 2496(2) Ephraim Canyon Road Preliminary Design/Final Design toNAICS 541330, PSC C1LB | $654,226 |
| 6982AF26F00010NDelivery Order, November 21, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca FW SDB 300(1) San Diego Bay NWR Entrance Road: Scoping the Purpose of This Task Order Is to Perform Scoping Services and Develop the ProjNAICS 541330, PSC C1LB | $560,349 |
| 6982AF23F00011NDelivery Order, March 1, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap MRN CR107(1) Muir Woods Road: A&e Design Services the Purpose of This Task Order Is to Add Funds in Accordance with the Attached ScoNAICS 541330, PSC C1LB | $521,030 |
| 6982AF24F00106NDelivery Order, September 18, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SCR T5(1) Monterey Bay Sanctuary Scenic Trail Preliminary/Final Mitigation DesignNAICS 541330, PSC C1LB | $430,517 |
| 6982AF22F00164NDelivery Order, January 3, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NM FTBL 2004(2) Wild Revers Road the Purpose of This Modification Is to Extend the Period of Performance (Pop) to March 31, 2024.NAICS 541330, PSC C1LB | $378,492 |
| 6982AF25F00008NDelivery Order, November 27, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az FS 289(1) Az NFSR 289 Bridge Replacement 70% Design Plans Task OrderNAICS 541330, PSC C1LB | $347,958 |
| 6982AF24F00047NDelivery Order, April 18, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SCR T5(3) Cotoni-Coast Dairies NM SH1 Overpass A/E Design Task Order the Cotoni-Coast Dairies National Monument Overpass Bridge, theNAICS 541330, PSC C1LB | $328,671 |
| 6982AF24F00019NDelivery Order, January 9, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap CR109(1) Sir Francis Drake Boulevard Post-Construction 404/401 Permit Monitoring Task Order for 2 Years of Monitoring (2024, 2025)NAICS 541330, PSC C1LB | $285,403 |
| 6982AF26F00065NDelivery Order, July 13, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap Mno 01N04(1) Saddleback Lake Road: Environmental ServicesNAICS 541330, PSC C1LB | $255,940 |
| 6982AF25F00021NDelivery Order, February 20, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo FS LSPDR 2023-1(1B) Black Mountain Road the Purpose of This Task Order Is for the A&e to Perform Final Design Services.NAICS 541330, PSC C1LB | $254,030 |
| 6982AF24F00078NDelivery Order, August 7, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az Flap SR88(1) Apache Trail Complete Env. Mitigation (Coffee Table Book)NAICS 541330, PSC C1LB | $242,586 |
| 6982AF24F00061NDelivery Order, June 18, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo NP Yose 2023-2(1) John Muir Trail ICE Cut Scoping Task Order for AE Design the General Scope of the Project Is to Remove a Hanging BNAICS 541330, PSC C1LB | $202,530 |
| 6982AF25F00014NDelivery Order, December 19, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Architect-Engineering Services - This Task Order Concerns the Preliminary to Final Design of the Rehabilitation of the New Hogan Parkway (0.NAICS 541330, PSC C1LB | $190,700 |
| 6982AF26F00037NDelivery Order, April 3, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap CR109(1) Sir Francis Drake Boulevard Task Order Is for Post-Construction Monitoring as Required Under 404/401 PermitsNAICS 541330, PSC C1LB | $170,372 |
| 6982AF24F00038NDelivery Order, April 1, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Ce Sac Multi(1) Boat Launch Parking and New Hogan Pky Improvements Award Task Order for A&e Final Design Services.NAICS 541330, PSC C1LB | $155,763 |
| 6982AF26F00103NDelivery Order, September 9, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Co FW RKM 10(1) Wildlife Dr. & VC Parking Design to 0% - 100%NAICS 541330, PSC C1LB | $154,345 |
| 6982AF27F00003NDelivery Order, October 28, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SCR T5(1A) Monterey Bay Sanctuary Scenic Trail Mitigation Annual Reporting of Post Design ServicesNAICS 541330, PSC C1LB | $150,000 |
| 6982AF25F00033NDelivery Order, April 17, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca BLM 34003(1) Mendo Lake Road - Environmental Compliance Studies Which Include Cultural Resources Survey (Photos, Records Forms, Gis Data,NAICS 541330, PSC C1LB | $145,026 |
| 6982AF23F00132NDelivery Order, July 17, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SR89(4) Fanny Bridge the Purpose of This Modification Is to Add Funds in the Amount of $50,000.00 to the Not-To-Exceed Amount of $10NAICS 541330, PSC C1LB | $125,000 |
| 6982AF26F00095NDelivery Order, September 2, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NM Flap SR475(1) Hyde Park Road Improvements Scoping and PDP EffortNAICS 541330, PSC C1LB | $115,640 |
| 6982AF25F00002NDelivery Order, November 4, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az/Nm IHS Navajo (1) Health Facilities Improvements Task Order for Scoping and Development of the Project Delivery PlanNAICS 541330, PSC C1LB | $89,513 |
| 6982AF26F00036NDelivery Order, April 23, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | This Task Order Is for Post Design Architecture & Engineering Services for the Ca Flap SR36(13) State Route 36 Humboldt County ProjectNAICS 541330, PSC C1LB | $80,000 |
| 6982AF26F00038NDelivery Order, April 6, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NM Flap Ridge(1)ridge Road Design Task Order for Scoping a Road Construction Project.NAICS 541330, PSC C1LB | $77,098 |
| 6982AF26F00057NDelivery Order, May 21, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NV Flap CCRTC ASH(1) Ash Canyon Road and Trailhead: Environmental Clearance & PermittingNAICS 541330, PSC C1LB | $73,209 |
| 6982AF24F00055NDelivery Order, May 28, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Co BR Ucpo Blue Mesa Road (1) Blue Mesa Environmental Resource StudiesNAICS 541330, PSC C1LB | $63,857 |
| 6982AF25F00094NDelivery Order, September 12, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ut Flap 2496(2) Ephraim Canyon Road - Scoping and PDP DevelopmentNAICS 541330, PSC C1LB | $57,126 |
| 6982AF24F00093NDelivery Order, August 21, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NV Flap 500(1) Red Rock Trail Post DesignNAICS 541330, PSC C1LB | $55,000 |
| 6982AF24F00081NDelivery Order, August 8, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo Sierra NF 05S07(1) Conduct Independent Concrete Analysis of Abutment and Wingwalls.NAICS 541330, PSC C1LB | $52,026 |
| 6982AF22F00130NDelivery Order, September 4, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap 03S11(1) Reds Meadow Road the Purpose of This Modification Is to Additional Funds for Post Design Services Through Construction CompNAICS 541330, PSC C1LB | $50,000 |
| 6982AF26F00024NDelivery Order, February 6, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Co FW RKM 10(1) Wildlife Dr. & VC Parking Design to for Scoping Site Visit and Project Delivery Plan DevelopmentNAICS 541330, PSC C1LB | $49,493 |
| 6982AF25F00037NDelivery Order, April 22, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NM FTBL 2004(2) Wild Rivers Road: Post Design Services the Purpose of This Action Is to Award an A&e Task Order for Post Design Services.NAICS 541330, PSC C1LB | $35,000 |
| 6982AF24F00022NDelivery Order, January 19, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Er Inyo 2023-4(1) Whitney Portal Road Cultural Resource Studies All Work to Be Performed in Accordance with the Attached Scope of Work (SNAICS 541330, PSC C1LB | $27,321 |
| 6982AF25F00048NDelivery Order, May 27, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | The Purpose of This Task Order Is for Post Design Services for Construction Project Ca Erfo NP Yose 2023-2(1) John Muir Trail - ICE Cut.NAICS 541330, PSC C1LB | $25,000 |
| 6982AF22F00157NDelivery Order, June 18, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | NV Flap 500(1) Red Rock Trail Fd: Additional Repackaging Design the Purpose of This Task Order Is to Add Funds in Accordance with the AttachNAICS 541330, PSC C1LB | $20,679 |
| 6982AF23F00134NDelivery Order, February 19, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SCR T5(1) Monterey Bay Sanctuary Scenic Trail: Post-Design Services the Purpose of This Modification Is to Add Nte Funds to the SubjNAICS 541330, PSC C1LB | $20,000 |
| 6982AF25F00079NDelivery Order, August 18, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az FS 289(1) Az NFSR 289 Bridge Replacement - Post Design ServicesNAICS 541330, PSC C1LB | $20,000 |
| 6982AF26F00022NDelivery Order, February 2, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Ce Sac 570(1) New Hogan Parkway Improvements PDSNAICS 541330, PSC C1LB | $20,000 |
| 6982AF26F00029NDelivery Order, March 9, 2026, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SCR T5(1A) Monterey Bay Sanctuary Scenic Trail: Post Design ServicesNAICS 541330, PSC C1LB | $20,000 |
| 6982AF23F00056NDelivery Order, January 9, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap La CR2N40(1) Santa Anita Canyon Road Post-Design Task Order for Design Services the Purpose of This Modification Is to Add $20,000 iNAICS 541330, PSC C1LB | $19,973 |
| 6982AF26F00006NDelivery Order, November 18, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo FS LSPDR 2023-1(1B) Black Mountain Road Post Design Services During Construction.NAICS 541330, PSC C1LB | $10,000 |
| 6982AF25F00095NDelivery Order, September 16, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Hi STP SR11(1) Hilea Stream Bridge - Claim Defense Support and Trial PreparationNAICS 541330, PSC C1LB | $5,981 |
| 6982AF22F00159NDelivery Order, February 7, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca FAA PRB(1) Paso Robles Radar Road Repair: A&e Consulting Engineering Services the Purpose of This Modification Is to Close Out the SubjecNAICS 541330, PSC C1LB | $0 |
| 6982AF22F00167NDelivery Order, April 1, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap Ed CR147(2) ICE House Road: Bridge Barrier Rail Design and Unshelving the Purpose of This Modification Is to Close Out the Subject TNAICS 541330, PSC C1LB | $0 |
| 6982AF22F00169NDelivery Order, August 29, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Mod P00002 Ca Erfo FS Eldor 2021-02(4) Alder Creek Bridge the Purpose of This Modification Is to Close Out the Task Order.NAICS 541330, PSC C1LB | $0 |
| 6982AF22F00170NDelivery Order, August 29, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Mod P00002 Ca Erfo FS Sequi 2021-02(2) Powderhorn Bridge the Purpose of This Modification Is to Close Out the Task Order.NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00010NDelivery Order, March 6, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo NP Seki 2021-1(1) Generals Highway Wall Repairs: Design Services the Purpose of This Task Order Is to Close Out the Subject Task OrdNAICS 541330, PSC C1LB | $0 |
| 6982AF23F00018NDelivery Order, February 7, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SR89(4) Fanny Bridge: Completion of 401 and 404 Permits. the Purpose of This Modification Is to Close Out Subject Task Order.NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00029NDelivery Order, April 12, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az FS 516(1) Snowbowl Road: Scoping Services the Purpose of This Modification Is to Close-Out the Subject Task Order.NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00045NDelivery Order, April 12, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az FS 289(1) Az NFSR 289 Bridge Replacement: Scoping Services the Purpose of This Modification Is to Close-Out the Subject Task Order.NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00054NDelivery Order, February 26, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Environmental Studies - Co Flap SH139(1) Douglas Pass the Purpose of This Modification Is to Extend the Period of Performance from 02/29/202NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00058NDelivery Order, January 2, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ut Flap Web 10(1) Causey Reservoir Access the Purpose of This Modification Is To: 1) Extend the Period of Performance (Pop) to February 29, NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00073NDelivery Order, February 7, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ut Flap Eme CR216(1) Jurassic NM Access Road - Environmental Field Studies the Purpose of This Modification Is to Close Out Subject Task OrdNAICS 541330, PSC C1LB | $0 |
| 6982AF23F00082NDelivery Order, March 12, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo NP Deva 2022-1(2) Mod P00001 the Purpose of This Modification Is to Close Out the Subject Task Order.NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00101NDelivery Order, February 21, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo FS LSPDR 2023-1(1) Black Mountain Road: Prelim-Final Design the Purpose of This Modification Is to Close Out the Subject Task Order.NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00123NDelivery Order, April 25, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap Alp 4(1) Hot Spring Road Environmental Resource Studies Task Order the Purpose of This Modification Is to Extend the Period of PerfoNAICS 541330, PSC C1LB | $0 |
| 6982AF23F00138NDelivery Order, May 7, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap SCR T5(1) Monterey Bay Sanctuary Scenic Trail: Parking Lot Design Services the Purpose of This Modification Is to Close Out the TaskNAICS 541330, PSC C1LB | $0 |
| 6982AF24F00003NDelivery Order, May 2, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Ce Sac Multi(1) Boat Launch Parking and New Hogan Pky Improvements Scoping Services Task Order the Purpose of This Modification Is to CloNAICS 541330, PSC C1LB | $0 |
| 6982AF24F00010NDelivery Order, March 11, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo NP Deva 2022-1(2) Salt Creek Interpretive Trail: Aquatic Resources Delineation the Purpose of This Modification Is to Close Out the NAICS 541330, PSC C1LB | $0 |
| 6982AF22D000003September 5, 2025, Full and Open Competition, 12 offers | 6982AF Central Federal Lands DivisiFederal Highway Administration | The Purpose of This Modification Is to Update Section I.4, Transportation Acquisition Regulation (48 CFR Chapter 1) Clauses 1252.237-73 Key NAICS 541330, PSC C1LB | $0 |
| 6982AF23F00135NDelivery Order, April 25, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo FS LSPDR 2023-1(1) Black Mountain Road: Post Design Services the Purpose of This Modification Is to De-Obligate Remaining Funds and NAICS 541330, PSC C1LB | -$8 |
| 6982AF23F00125NDelivery Order, November 20, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Flap Ed CR147(2) ICE House Road Post Design Service Task Order the Purpose of This Modification Is to Extend the Period of Performance frNAICS 541330, PSC C1LB | -$763 |
| 6982AF23F00089NDelivery Order, March 7, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az Flap 202(3) Red Cloud Mine Road Post Design Services the Purpose of This Modification Is to De-Obligate Excess Funds and Close Out the TaNAICS 541330, PSC C1LB | -$7,624 |
| 6982AF23F00100NDelivery Order, April 22, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo NP Seki 2021-1(1) Generals Highway Wall Repairs Post Design Services for A-E Contractor Support the Purpose of This Modification Is NAICS 541330, PSC C1LB | -$7,903 |
| 6982AF23F00111NDelivery Order, April 16, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo FS Sequi 2021-02(2) Powderhorn Bridge: Post Design Services the Purpose of This Modification Is to De-Obligate Remaining Funds and CNAICS 541330, PSC C1LB | -$9,288 |
| 6982AF23F00113NDelivery Order, February 11, 2025, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Ca Erfo FS Eldor 2021-02(4) Alder Creek Bridge Post Design Services Task OrderNAICS 541330, PSC C1LB | -$9,288 |
| 6982AF23F00012NDelivery Order, May 2, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Co Flap Pit 82(1) Brush Creek Parking Area Post Design Services 6982af22d000003/6982af23f00012n Mod P00004 the Purpose of This Modification NAICS 541330, PSC C1LB | -$9,798 |
| 6982AF22F00116NDelivery Order, April 17, 2024, Full and Open Competition | 6982AF Central Federal Lands DivisiFederal Highway Administration | Az Flap SR181(1) Chiricahua Access Road: Post Design Services the Purpose of This Modification Is to Change the Cor from Ryan Olson to KevinNAICS 541330, PSC C1LB | -$15,132 |
- Places of performance
- ColoradoCaliforniaWashingtonUtah
- Product and service codes
- C1LB Architect And Engineering- Construction: Highways, Roads, Streets, Bridges, And Railways
- Transactions
- 154 across 73 awards