Skip to content
Abierto

Sources sought, total small business set-aside

2026 Wright-Patterson Air Force Base Multiple Award Construction Contract (MACC)

ZHTV2026

Department of the Air Force, FA8601 AFLCMC Pzio. Commercial and Institutional Building Construction.

Response deadline

July 23, 2025 at 5:00 PM EDT

Closed 421 days ago. Posted July 7, 2025, first published June 10, 2025. Scheduled to archive August 7, 2025.

Description

As published on SAM.gov.

The anticipated requirement will be issued as a total small business set aside with an 8(a) pool. Contractors selected for award will form the two (2) pools of contractors eligible to compete for individual Task Orders; one Small Business Pool and one 8(a) Pool. Task orders will be competed amongst both area pools. The MACC will be utilized to procure design and construction efforts at Wright-Patterson AFB, OH (WPAFB).

The contractor shall provide all management, labor, material, and equipment (unless furnished by the Government), transportation, supervision and designs to accomplish multiple concurrent projects for a broad range of maintenance, repair and minor construction work on real property at Wright Patterson AFB, OH and local USAF Leased spaces. The base covers more than 8,000 acres of land (12.5 square miles) and provides operational support for more than 100 associate units located at Wright-Patterson.

The base is divided into two areas - A and B. Ohio SR 444 runs between the two areas. WPAFB has 850 facilities containing 16.4 million SF, with missions varying tremendously in complexity and nature.

Facilities include, but are not limited to, research and development, hospital, secure areas, airfields, flight line, infrastructure, administrative, residential, pavements, industrial, etc. The size and diversity of WPAFB necessitates expeditious response and efficient management of the heavy volume of task orders (TOs) placed against the MACC. The prime contractor level is limited to US owned/operated contractors/companies only, foreign contractors are prohibited to participate.

Contractors that participate in the MACC will be expected to accomplish a wide variety of individual construction projects. Project types may include renovations/upgrades, additions, and complex repair work. Specific projects may routinely include general construction and finishing work, hazardous material surveying and abatement, mechanical, electrical, and telecommunications installations.

The requirements for specific projects will be identified in individual TO RFP (Task Order Request for Proposal) that will be sent to MACC contractors to base their proposals on. Project delivery methods form MACC TO (Task Orders) may include both Design/Build and Design/Bid/Build. Therefore, in addition to providing for general construction services, the Contractor will need to provide in-house design capability or ready access to design capabilities.

The Contractors shall provide sufficient technical support and project management to assure quality and completeness of TO proposals, accommodate multiple concurrent “active” projects, provide flexibility of design staff and subcontractor pool to handle rapid increases in work volume, process submittals in a timely manner, and perform according to schedule.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 10, 2025

    Sources sought

    Due July 9, 2025 at 5:00 PM EDT. SAM.gov, notice 4b240d8c07f14c439bf4d89910e3b9a1

  2. June 18, 2025

    Sources sought

    Due July 9, 2025 at 5:00 PM EDT. SAM.gov, notice 08591dd9f8e3450ea320206d28b703d4

  3. July 2, 2025

    Sources sought

    Due July 9, 2025 at 5:00 PM EDT. SAM.gov, notice 2b91dbf423954c2281ddfa519785edc5

  4. July 7, 2025

    Sources sought

    Due July 23, 2025 at 5:00 PM EDT. SAM.gov, notice 57ef46fbf4384ab6b1edc2796595c32c

Points of contact