Presolicitation, 8(a) set-aside
HVAC Repair
W91QV124R9999
Department of the Army, W6QM Micc-Ft Belvoir. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
August 7, 2024 at 1:00 PM EDT
Closed 823 days ago. Posted July 29, 2024. Scheduled to archive August 22, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
45 like it are open now in plumbing, heating, and air-conditioning contractors
- FY27 HVAC Maintenance Service
Department of the Army, W6QM Micc-Ft Belvoir
Sources soughtSmall businessNAICS 238220VirginiaPANMCC26P0000056336Closes in 5 daysNov 13 - CGC SCIOTO WATER MIST FIRE PROTECTION SYSTEM
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 238220Keokuk, IA70ZU0227Q0000282Closes tomorrowNov 9 - B41 Isolation Valve Installation
Department of Veterans Affairs, 256-Network Contract Office 16
Combined synopsis and solicitationSDVOSBNAICS 238220North Little Rock, AR36C25627Q0081Closes tomorrowNov 9
All 45 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
Building 3165 is located at 6921 Britten Dr, Fort Belvoir, VA 22060. It is the home to the Operational Support Airlift Activity (OSA-A). OSA-A is a multi-component Army activity which oversees the management of the non-executive fixed wing operations at the Davidson Amy Airfield. The building was built in 1976, totaling 15,485 gross square foot.
The building features office spaces (total 8,612 SF), conference rooms (total 1,157 SF), server room (497 SF), telecommunications room (292 SF), fitness area (271 SF), loading bay receiving area (465 SF), and secure working area (257 SF). The remainder of the building’s square footage are mechanical rooms, hallways, and storage rooms.
In general, the Building’s HVAC is divided between 1 central station air handling unit (AHU), (1) 20-ton packaged roof top unit (RTU) with electric heating, 11 mini-split units, 1 computer room air conditioning unit, 2-unit heaters, and 4 window units. The current central station AHU and RTU were zoned and ducted for a different layout within spaces. As a result, multiple spaces have large temperature and humidity deltas from the building’s set point.
The building also utilizes steam generated from (1) 400 MBH gas fired boiler to provide heating throughout the building. Additionally, the building has experienced water flowing out of the ductwork. The intent of this project is to demolish the old central station air handling unit and roof top unit along with their respective ancillary equipment, steam piping, ductwork, condensate pumps, controls, and boiler.
In its place the intent is to replace the 2 systems with a variable air volume (VAV) system with electric reheat at the terminal units. Additionally, the replacement HVAC system shall rezone the HVAC to provide local temperature control to command offices and provide the remaining areas with proper heating, cooling, and ventilation. Additionally, the replacement system shall not place air handlers or other large equipment on the roof.
The HVAC systems serving the server room, computer room, IT offices near the computer room, UPS room, and secure area will not be part of this contract and will remain in place. The spaces internal to the building shall not be reconfigured, change use, or change occupancy.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 29, 2024
Presolicitation
Due August 7, 2024 at 1:00 PM EDT. SAM.gov, notice 1f949d624613474ba47bc04e8c14e6dd
Points of contact
- Kenneth Mortonkenneth.c.morton.civ@army.mil5206698714
- Emmanuel Abbanemmanuel.c.abban.civ@army.mil5206698558