Skip to content
  • 6,814 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Blast Overpressure Sensor System (BOSS)

W91CRB-26-RFI-BOSS

Department of the Army, W6QK ACC-APG. Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables.

Response deadline

September 11, 2026 at 4:00 PM EDT

Closed 51 days ago. Posted September 8, 2026, first published August 26, 2026. Scheduled to archive September 18, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed 51 days ago

34 like it are open now in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables

All 34 open in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables

Description

As published on SAM.gov.

*** Amendment 01 Summary of Changes ***

  • Attachment 1 Updated: Replaced the original Attachment 1 with "Amended_RFI Attachment 1- Blast Overpressure Sensor System (BOSS) Requirement Document.pdf". The chart headings on pages 2 and 3 have been corrected to read "Key Performance Parameter" to align with the definitions on page 1.

  • Industry Q&A Provided: Added the official Industry Q&A log addressing COTS requirements and KPP chart clarifications.

  • Addition of Missing Attachment: "RFI Attachment 2_Blast Overpressure Sensor System (BOSS) Remarks.xlsx" has been added to the solicitation on SAM.gov.

    • Action Required: As stated in Section 3 (Submission Instructions), vendors must utilize and complete this Excel file as part of their response package.

  • Clarification of Requirement Document: "Amended_RFI Attachment 1- Blast Overpressure Sensor System (BOSS) Requirement Document.pdf" remains a mandatory attachment. Vendors must review this document to understand the Key Performance Parameters (KPPs) and Critical Logistic Specifications (CLS) required to formulate a complete response.

=======================================
[ORIGINAL RFI TEXT]

1. Background:
Through three National Defense Authorization Acts (NDAA), Section 734 of the 2018 NDAA, Section 253 of the 2019 NDAA, and Sections 717 and 742 of the 2020 NDAA, Congress mandated longitudinal medical studies on Blast Overpressure (BOP) exposure. These studies aim to improve the DoD’s understanding of how blast exposure affects Service Members’ brain health and to better inform policies on risk mitigation, unit readiness, and health care decisions. The BOSS will be a Soldier-worn device designed to track, store, and transmit blast overpressure events caused by shock waves above normal atmospheric pressure, whether from tier-one weapons or explosions during training and combat. By proactively monitoring blast exposure, BOSS may help reduce injury severity. It will provide real-time data to inform medical decisions and maintain exposure history for long-term health monitoring within the PEO Soldier Data Eco-System.

2. Objective and Purpose/Scope:
The Government intends to conduct a Sources Sought to identify qualified sources capable of meeting the required Key Performance Parameters (KPPs), as well as to gain an understanding of how potential vendors may be able to meet these requirements in the future. Through this market research effort, the Government seeks to assess current industry capability, evaluate associated risks, and determine the feasibility and maturity of potential paths toward full KPP compliance. The information received will help the Government shape acquisition planning, refine requirements, and better understand the solutions available or emerging within industry.

3. Submission Instructions:

  • Response Due Date: Interested parties shall submit the RFI response electronically by 1600 Eastern on 11 September 2026 via e-mail to: roxanne.a.dalrymple.civ@army.mil; timothy.j.compton7.civ@army.mil

  • Email Subject/Title: "RFI response for W91CRB-26-RFI-BOSS"

  • Format: Microsoft Word or searchable Adobe PDF. Arial 12-point font, single spaced, single sided, 8.5 by 11-inch paper with 1-inch margins.

  • Required Contents:

    • Cover Page (1-page limit) including Title, Organization, Technical and administrative points of contact (names, addresses, phone, fax number and email addresses), and Topic area: Blast Overpressure Sensor System (BOSS).

    • Completed Attachment 1 (Amended BOSS Requirement Document) and Attachment 2 (BOSS Remarks). The response shall provide sufficient technical data to determine how you fully meet the requirements.

4. Disclaimer:
THIS IS NOT A REQUEST FOR PROPOSALS (RFP) OR A REQUEST FOR QUOTATIONS (RFQ); IT IS STRICTLY A REQUEST FOR INFORMATION (RFI). This RFI is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents are solely responsible for all expenses associated with responding to this RFI. NO PHONE CALLS WILL BE ACCEPTED OR RETURNED. All 'Proprietary', 'Classified', 'Confidential', or 'Sensitive' information shall be marked as such and will be treated accordingly.

5. See Attachments at the bottom of this posting:
Updated List of Attachments (Revision to Section 5):
The complete and official list of attachments for this RFI is now updated to include the following four (4) documents:

  • Main Solicitation Document: Boss Sources Sought.pdf

  • Attachment 1 (AMENDED): Amended_RFI Attachment 1- Blast Overpressure Sensor System (BOSS) Requirement Document.pdf

  • Attachment 2: RFI Attachment 2_Blast Overpressure Sensor System (BOSS) Remarks.xlsx

  • Industry Q&A: Q_and_A_W91CRB_26_RFI_BOSS.pdf

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 26, 2026

    Sources sought

    Due September 11, 2026 at 4:00 PM EDT. SAM.gov, notice d1b4b589d97e402099704d98a474269c

    3 revisions on SAM
    • September 8, 2026: publish, sources sought
    • August 31, 2026: publish, sources sought
    • August 26, 2026: publish, sources sought
  2. August 31, 2026

    Sources sought

    Due September 11, 2026 at 4:00 PM EDT. SAM.gov, notice ef1123b820ee4fd98ba32df79bfdb9af

    3 revisions on SAM
    • September 8, 2026: publish, sources sought
    • August 31, 2026: publish, sources sought
    • August 26, 2026: publish, sources sought
  3. September 8, 2026

    Sources sought

    Due September 11, 2026 at 4:00 PM EDT. SAM.gov, notice dac22930c2da40299c25e7ed436a43b3

    3 revisions on SAM
    • September 8, 2026: publish, sources sought
    • August 31, 2026: publish, sources sought
    • August 26, 2026: publish, sources sought

Points of contact