Skip to content
Abierto

Award notice, first published as presolicitation

Construction of a Spur Jetty at Camp Ellis Beach in Saco, Maine

W912WJ26BA004

Department of the Army, W2SD Endist New England. Other Heavy and Civil Engineering Construction.

Awarded

Mohawk Northeast Inc.

$24,434,100.00 obligated so far on USAspending

Description

As published on SAM.gov with the solicitation of December 3, 2025.

The U.S. Army Corps of Engineers, New England District is issuing an Invitation for Bids for construction of a spur jetty that will be tied into the existing North Jetty located at the mouth of the Saco River at Camp Ellis Beach in the City of Saco, Maine. The NAICS code for this procurement is 237990 with a size standard of $45M.

The estimated construction cost is between $10,000,000 and $25,000,000.The existing North Jetty at Camp Ellis Beach is an interlocked stone structure located at the entrance to the Saco River. Originally constructed in 1872, the structure has been lengthened and repaired numerous times over the years. The existing North Jetty is approximately 6,600 feet in length and constructed to a height of 15 feet MLW with an 8-ft crown width. Side slopes are 1H:1V.

The proposed jetty spur will extend from the existing North Jetty into Saco Bay.The proposed work consists of constructing a 750-ft long spur jetty extending from the North Jetty into the Saco Bay at a location approximately 1500? from shore. As part of the spur jetty construction, the Contractor will reinforce an approximately 100-ft length of the North Jetty.

The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of new bedding, underlayer and armor stone for tie-in between the new and the existing structure.

Anticipated stone required to construct the spur jetty and reinforce the existing north jetty includes approximately 9,500 square yards of 2-ft thick, stone-filled marine mattress; 13,000 tons of underlayer stone; and 38,000 tons of 8-12 ton armor stone (36,000 tons for the spur and 2,000 for the existing jetty reinforcement.) The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances.

Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of the structure are approximately 10 feet, and the average tidal range is approximately 9 feet. The area is located 1500? off the shoreline and subject to wave action.

No spudding or anchoring into the existing structure is permitted.Please note that this solicitation is unrestricted. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/).

All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at brian.t.mannion@usace.army.mil

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
CE4UBZFNCKU9
CAGE
1QLQ9
Vendor location
Plantsville, CT
Contract
W912WJ26CA001, definitive contract
Obligated
$24,434,100.00
Actions
2 between January 21, 2026 and February 3, 2026
Competition
Full and Open Competition, 4 offers received
Set-aside reported
No Set Aside Used.
Described as
Construction of a Spur Jetty, Saco River at Camp Ellis Beach, Saco, Maine
Match
award number W912WJ26CA001 equals the contract number; same awarding office W912WJ (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 5, 2025

    Presolicitation

    Construction of a Spur Jetty at the mouth of the Saco River at Camp Ellis Beach in Saco, Maine.

    Due October 15, 2025 at 1:00 PM EDT. SAM.gov, notice 2cd0e2d5e6b642609b73663ae0678a00

  2. October 17, 2025

    Solicitation

    Due November 18, 2025 at 1:00 PM EST. SAM.gov, notice 4a37359b15944a33b403c7fc4fb01ae6

  3. October 29, 2025

    Solicitation

    Due November 18, 2025 at 1:00 PM EST. SAM.gov, notice 3487113e345a44fd95765cf6169bfad0

  4. December 3, 2025

    Solicitation

    Due November 18, 2025 at 1:00 PM EST. SAM.gov, notice ca59cb9fb6c04d708f95e9169822954d

  5. January 22, 2026

    Award notice, originally solicitation

    Awarded to Mohawk Northeast, Inc. Plantsville for $24,434,100. SAM.gov, notice 0e5f0cff92b94511a3261b3529c5f55b

Points of contact