Award notice, total small business set-aside, first published as presolicitation

Storage Building Construction, Buffumville Lake, Charlton, MA

W912WJ25QA018

Department of the Army, W2SD Endist New England. Commercial and Institutional Building Construction.

Awarded

JP Solution LLC

$245,245.00 obligated so far on USAspending

Description

As published on SAM.gov with the solicitation of May 7, 2025.

The U.S. Army Corps of Engineers – New England District is issuing a Solicitation Notice for Storage Building Construction, Buffumville Lake, Charlton, MA.

THE WORK CONSISTS OF:

Contractor shall furnish all materials, equipment, and labor required to prepare the site, pour a concrete footing, and purchase and construct a pre-engineered metal building, approximately 40’ wide by 50’ long, and between 15’ - 17’ tall for vehicle and equipment storage. This scope of work includes installation of electrical components and has an option task for insulation and plywood walls. All work shall be completed in accordance with the Statement of Work.

The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 236220 with a Small Business Size Standard of $45 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
K2L3BVRS8BX1
CAGE
86KV4
Vendor location
Willington, CT
Contract
W912WJ25PA026, purchase order
Obligated
$245,245.00, potential $269,472
Actions
4 between May 30, 2025 and May 26, 2026
Competition
Competed Under SAP, 14 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Storage Building Construction, Buffumville Lake, Charlton, Ma
Match
award number W912WJ25PA026 equals the contract number; same awarding office W912WJ (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 4, 2025

    Presolicitation

    SAM.gov, notice e5f53e72a5d24246b50bff183db5c126

  2. April 22, 2025

    Solicitation, originally presolicitation

    Due May 6, 2025 at 5:00 PM EDT. SAM.gov, notice 5b213215b63e4ee6968669b722ad020a

  3. April 29, 2025

    Solicitation

    Due May 6, 2025 at 5:00 PM EDT. SAM.gov, notice f0d5725f417241709b347c539e65e06e

  4. May 1, 2025

    Solicitation

    Due May 13, 2025 at 5:00 PM EDT. SAM.gov, notice 7e18d91bddd94dc6b0122215867fa281

  5. May 7, 2025

    Solicitation

    Due May 13, 2025 at 5:00 PM EDT. SAM.gov, notice 134d82a8fe5a4de49ce46d1bb449730e

  6. May 30, 2025

    Award notice, originally solicitation

    Awarded to JP SOLUTION LLC Willington for $269,472. SAM.gov, notice 8c88776c2ef442f48d1105ea6d28a9c6

Points of contact