Special notice
INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)
W912QR-IndustryDay-FortCarsonECS-CMARwithOTA
Department of the Army, W072 Endist Louisville. Commercial and Institutional Building Construction.
Response deadline
October 6, 2026 at 11:00 AM EDT
Closed 33 days ago. Posted October 13, 2026, first published September 17, 2026. Scheduled to archive December 31, 2027.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed 33 days ago
190 like it are open now in commercial and institutional building construction
- Remove and Replace Carpet-Rooms 127 and 137 at the United States Customs House Denver CO
Public Buildings Service, PBS Project Delivery West - Branch a
PresolicitationWOSBNAICS 236220Denver, CO47PD5127Q9987Closes in 2 daysNov 10 - DFC Bldg. 56 Clean Room - Design/Build
Public Buildings Service, PBS Project Delivery West - Branch a
Combined synopsis and solicitationNAICS 236220Lakewood, CO47PD5127Q9995Closes in 9 daysNov 17 - Denver, CO Denver P&DC Roof Replacement K95856
Postal Service, Supplies Material MGMT
SolicitationNAICS 236220Denver, CO089495-27-A-0001Closes in 12 daysNov 20
All 190 open in commercial and institutional building construction
Description
As published on SAM.gov.
*** 13 October 2026 UPDATE ***: Formal Request for Qualifications has been issued under Notice ID: W912QR279A001. The RFQ was issued 13 October. Responses are currently due 28 October. See RFQ posting for additional details.
The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for construction solicitation for Fort Carson ECS using CM@Risk under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release.
I. INDUSTRY DAY
USACE intends to conduct an Industry Day on 06 October 2026 at 0900 Mountain Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Construction Manager at Risk (CM@Risk) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release.
General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Request for Qualifications (RFQ). Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ.
Please use the direct special event link below to register for access to Fort Carson. You must be a U.S. Citizen and have a REAL ID to complete registration. If you do not, you must go the Fort Carson Visitor Control Center (located at Gate 1, located off 115 HW) with your State ID plus a U.S. Passport OR Certified birth certificate and Social Security Card to obtain access. Individuals with a valid CAC, should be able to access the installation directly.
Direct Special Event Link
https://pass.aie.army.mil/?b=usa&i=carson&e=M6JLHPVK
Physical Access Control POC: Mark Elliott (719) 466-1132 mark.d.elliott24.civ@army.mil
II. LOCATION/LOGISTICS
Industry Day Presentation location: Butts Army Airfield Hangar – 9620 Son Tay Road
NOTE: Onsite parking space may be limited, overflow parking is available in the vicinity
Site Visit – Primary parking lot is at the CBRN Chamber across the tank trail at the intersection of Minick Ave and Prussman Blvd. Additional parking is available on Minick Ave less than a quarter mile NW of the CBRN Chamber lot.
Onsite Directions Link Below. Turn by turn directions and map attached for download.
https://maps.app.goo.gl/U4o1XusLDWip4gn87
III. PROJECT OVERVIEW
- Project Title: Construction of an Equipment Concentration Site (ECS) Complex
- Location: Fort Carson, Colorado
- Agency: U.S. Army Corps of Engineers, Louisville District
- NAICS Code: 236220
IV. PROJECT DESCRIPTION
This acquisition will deliver a consolidated, fully functional ECS complex on an undeveloped 48-acre parcel of land at Fort Carson, CO. This site features a comprehensive range of facilities designed to support the mission of ECS-42, which is responsible for the maintenance and storage of key military assets assigned to 83 regional Army Reserve units.
The operational readiness of this military equipment is essential for both training Army Reserve Soldiers and equipping units from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces.
Core Facilities include:
- General Purpose Warehouse (GPW): A 39,313 square-foot (SF) secure, clear-span storage facility designed for the protection and preservation of military equipment.
- Area Maintenance Support Activity (AMSA) Shop: A 26,217 SF vehicle maintenance facility featuring advanced vehicle maintenance exhaust systems, overhead cranes, heavy-duty hoists, and specialized tool rooms.
- Organizational Storage Building: A 5,000 SF high-bay vertical storage facility.
- Container Storage Area: A 4,440-square-yard (SY) reinforced concrete layout for secure tactical container storage.
Supporting Infrastructure & Specialized Systems include:
- Heavy Equipment Parking & Site Work: A Military Equipment Parking (MEP) lot featuring extensive heavy-duty concrete pavements designed to withstand high-shear tracked and wheeled tactical vehicle loads, alongside POV parking, security fencing, and utility tie-ins.
- Tactical Vehicle Wash Facilities: Two dedicated, high-capacity vehicle wash racks/platforms featuring industrial filtration and water-recycling systems.
- Bi-Level Loading Ramp: A reinforced bi-level loading ramp designed to facilitate the rapid loading and unloading of heavy armored vehicles onto transport carriers.
- Specialized Foundations: Geotechnical engineering solutions, including deep foundation systems and soil stabilization, to mitigate volatile soil conditions across the 48-acre site.
- Fire Protection: Advanced fire detection and suppression systems, including specialized solutions for high-bay maintenance areas and hazardous material storage, compliant with all relevant UFC and NFPA standards.
- Cybersecurity: Facility-related control systems will be designed and implemented in accordance with UFC 4-010-06, ensuring the cybersecurity of all networked building systems.
- UFC Compliance: The entire facility complex will be designed and constructed to meet all applicable Unified Facilities Criteria (UFC), including AT/FP (Antiterrorism/Force Protection) standards and sustainable design principles as outlined in the Army Sustainable Design and Development Policy.
V. ACQUISITION STRATEGY - PRE-AWARD
USACE, Louisville District will use a streamlined competitive selection process:
- Step 1 –White Papers: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ). Following evaluation of the qualification packages, the Government intends to down-select up to three (3) highest qualified firms to proceed to Step 2.
- Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected as the Construction Manager for negotiation and award of Agreement 1 for preconstruction services. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction of the ECS, which will be added as a bilateral modification at a later date.
VI. ACQUSITION STRATEGY – AWARD
The agreement will be awarded to the most qualified Construction Manager at Risk (CMAR) to provide preconstruction services and construction. Phase 1 of the CM@Risk agreement will include pre-construction services. The selected CMAR will act as an expert consultant to the Government, collaborating directly with USACE and the third-party Designer of Record during active design progression. The Government’s intent is to award the Phase I Agreement for Preconstruction Services prior to the 65% design review meeting. Phase 2 of the agreement will include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP).
All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ.
VII. Virtual Participation Opportunity:
For those who are unable to attend the Industry Day even in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below:
Microsoft Teams meeting
Join: https://dod.teams.microsoft.us/meet/993580238205?p=NgWECEurH73BprxGc1
Meeting ID: 993 580 238 205
Passcode: kB2Fr9e2
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Fort Carson Gate 20 to Parking lot Minick Ave Fort Carson CO 80913 - Google Maps.pdf4.6 MB, September 17, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 17, 2026
Special notice, originally sources sought
Due October 6, 2026 at 11:00 AM EDT. SAM.gov, notice 2f9b07d669b44f4aa080617dbc7b95a9
4 revisions on SAM
- September 21, 2026: publish, special notice
- September 21, 2026: publish, special notice
- September 17, 2026: publish, special notice
- July 29, 2026: publish, sources sought
September 21, 2026
Special notice
Due October 6, 2026 at 11:00 AM EDT. SAM.gov, notice 53787b99e75e4f3fb18ddceb8b9e329f
4 revisions on SAM
- September 21, 2026: publish, special notice
- September 21, 2026: publish, special notice
- September 17, 2026: publish, special notice
- July 29, 2026: publish, sources sought
September 21, 2026
Special notice
Due October 6, 2026 at 11:00 AM EDT. SAM.gov, notice d436ade70b504d718d0b3a37ba144617
4 revisions on SAM
- September 21, 2026: publish, special notice
- September 21, 2026: publish, special notice
- September 17, 2026: publish, special notice
- July 29, 2026: publish, sources sought
October 8, 2026
Special notice
Due October 6, 2026 at 11:00 AM EDT. SAM.gov, notice 644f108f5638434fbf0ea64dfb65e6f7
5 revisions on SAM
- October 8, 2026: publish, special notice
- September 21, 2026: publish, special notice
- September 21, 2026: publish, special notice
- September 17, 2026: publish, special notice
- July 29, 2026: publish, sources sought
October 13, 2026
Special notice
Due October 6, 2026 at 11:00 AM EDT. SAM.gov, notice 351fd0d0842f411fadbe22471214399a
6 revisions on SAM
- October 13, 2026: publish, special notice
- October 8, 2026: publish, special notice
- September 21, 2026: publish, special notice
- September 21, 2026: publish, special notice
- September 17, 2026: publish, special notice
- July 29, 2026: publish, sources sought
Points of contact
- Chris BrackettChristopher.brackett@usace.army.mil5023156666