Award notice, total small business set-aside, first published as solicitation
Paducah Levee System Reconstruction Phase 3
W912QR52370251
Department of the Army, W072 Endist Louisville. Other Heavy and Civil Engineering Construction.
Awarded
$0.00 obligated so far on USAspending
Description
As published on SAM.gov with the solicitation of December 16, 2025.
Login at https://piee.eb.mil and search for 'W912QR52370251' to obtain more details.*
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Aleut Flood Management, LLC
- UEI
- YEW4GSMDXTH7
- CAGE
- 96PW4
- Vendor location
- Oak Ridge, TN
- Contract
- W9123723D0006
- Obligated
- $0.00, potential $98,000,000
- Actions
- 3 between December 20, 2024 and December 19, 2025
- Competition
- Full and Open Competition, 7 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- Modification to Exercise Option Period 2 Design-Bid-Build (Dbb) Land Construction Within the Rivers Districts (Huntington, Louisville, Nashville, and Pittsburgh)
- Match
- award number W9123723D0006 equals the contract number; same sub-agency 2100 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 29, 2025
Solicitation
Paducah Levees Reconstruction Phase 3
Due October 21, 2025 at 10:00 AM EDT. SAM.gov, notice b31e55feeeac4e219fb74b79acc84170
September 30, 2025
Solicitation
Paducah Levees Reconstruction Phase 3
Due October 21, 2025 at 10:00 AM EDT. SAM.gov, notice 1adbf4d7d9cb48d69196652eb1fa30e6
October 9, 2025
Solicitation
Paducah Levees Reconstruction Phase 3
Due October 30, 2025 at 10:00 AM EDT. SAM.gov, notice d492266196774d89a3e0975b08f99e83
October 14, 2025
Solicitation
Paducah Levees Reconstruction Phase 3
Due October 30, 2025 at 10:00 AM EDT. SAM.gov, notice e8254c08826f45d6a4ec9f401673d72e
December 3, 2025
Solicitation
Paducah Levees Reconstruction Phase 3
Due December 17, 2025 at 11:00 AM EST. SAM.gov, notice 3cc008ab12374be19e0de93500b047eb
December 3, 2025
Solicitation
Paducah Levees Reconstruction Phase 3
Due December 17, 2025 at 11:00 AM EST. SAM.gov, notice 4eb174abea314dc4a54ddcdcfc6ce217
December 16, 2025
Solicitation
Paducah Levees Reconstruction Phase 3
Due December 17, 2025 at 11:00 AM EST. SAM.gov, notice c0534db3ad6d47f9a96b451fb9970377
January 9, 2026
Award notice
Awarded to ALEUT FLOOD MANAGEMENT, LLC Oak Ridge for $752,815. SAM.gov, notice 469d29b0a2cc48099f5eec681a7320b4
Also open from this buyer
- Nolin River Lake Tailwater Restroom ConstructionCombined synopsis and solicitationSmall businessNAICS 236220KentuckyW912QR26QA110Closes todaySep 18
- C.J. Brown Dam and Reservoir Elevator Modernization - Amendment 01Combined synopsis and solicitationNAICS 333921W912QR26QA101Closes todaySep 18
- Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinSolicitationNAICS 238910W912QR26QA094Closes todaySep 18
- Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, CaliforniaPresolicitationSmall businessNAICS 236220CaliforniaW912QR27BA001Closes tomorrowSep 19
- Green River Lake- Floating Courtesy DockSolicitationSmall businessNAICS 237990W912QR26QA108Closes in 3 daysSep 21