Solicitation, total small business set-aside
Harsha Bridge Pier Spall Repair at William H. Harsha Lake
W912QR-42052812
Department of the Army, W072 Endist Louisville. Other Heavy and Civil Engineering Construction.
Response deadline
September 12, 2024 at 1:00 PM EDT
Closed 782 days ago. Posted September 4, 2024, first published August 16, 2024. Scheduled to archive September 4, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
132 like it are open now in other heavy and civil engineering construction
- Belle Fountain Ditch Cleanout Phase 2
Department of the Army, W07V Endist Memphis
SolicitationSDVOSBNAICS 237990MissouriW912EQ26BA002Closes todayNov 3 - Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Department of the Army, W076 Endist Galveston
SolicitationNAICS 237990Galveston, TXW912HY26BA019Closes todayNov 3 - Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Department of the Army, W072 Endist Pittsburgh
PresolicitationSmall businessNAICS 237990Millvale, PAW911WN27QA004Closes todayNov 3
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
Dear MATOC Contractors:Reference is made to your Indefinite Delivery Indefinite Quantity Contracts, Numbers W912QR21D0056 through W912QR21D0060, W912QR21D0085, W912QR21D0086, Multiple Award Task Order Contracts (MATOCs) for Design-Bid-Build (DBB) Operations and Maintenance Construction within the Districts mission boundaries.We request you submit a price proposal for Control Tower Concrete Column Spalling Repair located William H. Harsha Lake, detailed in the scope of work and specifications enclosed in this letter.
All vendors must be registered in the SAM database prior to submitting a proposal.The basis for award of this task order is lowest evaluated price. Please complete the price breakout schedule and include a labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract.
Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract.Offerors shall allow for Government acceptance of proposals for 60 calendar days from the date proposals are due.
Any proposal that does not allow acceptance for 60 days will not be considered and will be rejected.The cost range is Between $250,000.00 and $500,000 per FAR 36.204 Disclosure of the magnitude of construction projects.PLEASE NOTE:
THIS IS FOR CONSTRUCTION SERVICES ONLY: the effective DBA Wage Rate for this requirement is OH20240001 dated 07/26/2024.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 16, 2024
Solicitation
Control Tower Concrete Column Spalling Repair at William H. Harsha Lake
Due September 12, 2024 at 12:00 PM EDT. SAM.gov, notice 73105b5a73d7446ab2c82f4d27678d2d
August 16, 2024
Solicitation
Control Tower Concrete Column Spalling Repair at William H. Harsha Lake
Due September 12, 2024 at 12:00 PM EDT. SAM.gov, notice a6f146b35a734ad7be9e1aca8ade4bbe
August 16, 2024
Solicitation
Control Tower Concrete Column Spalling Repair at William H. Harsha Lake
Due September 12, 2024 at 1:00 PM EDT. SAM.gov, notice d5d626106168451c87db3791cd02f496
September 4, 2024
Solicitation
Due September 12, 2024 at 12:00 PM EDT. SAM.gov, notice 61c3d28501ca4218b414993b68637644
September 4, 2024
Solicitation
Due September 12, 2024 at 1:00 PM EDT. SAM.gov, notice b3ccb50efe434fb2998509c58af552ef
Points of contact
- Joel Hubermanjoel.huberman@usace.army.mil5023157409