Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

PLA Market Survey: FTC Unaccompanied Enlisted Personnel Housing Barracks FY26 & FY27

W912QR-26-UEPH-FY26_FY27

Department of the Army, W072 Endist Louisville. Commercial and Institutional Building Construction.

Response deadline

June 30, 2026 at 1:00 PM EDT

Closed 124 days ago. Posted June 23, 2026, first published June 16, 2026. Scheduled to archive September 30, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

184 like it are open now in commercial and institutional building construction

All 184 open in commercial and institutional building construction

Description

As published on SAM.gov.

W912QR-26-UEPH-FY26_FY27

Description: The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $35 million) for projects consisting of interior and exterior modernization, renovation, and repair of existing residential/commercial construction projects.

The proposed project is to construct two (2) standard design barracks to accommodate 260 unaccompanied enlisted personnel. Primary facilities include living and sleeping quarters, baths, storage, service areas, building, information systems, fire protection and alarm systems, antiterrorism measures, intrusion detection system (EDS), installation and Energy Monitoring Control Systems (ECMS) connection. Supporting facilities include site development, utilities and utility connections, exterior lighting, paving, sidewalks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by self-contained system for each living quarters unit along with a central system for common areas. Post construction award services (PCAS) will be provided. Utility connections are required to a privatized electric distribution, natural gas, water, and wastewater systems. Measures in accordance with the Department of Defense (DoD). Minimum antiterrorism for buildings standards will be provided. Building furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber security measures will be incorporated into this project. Sustainability/energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD’s UFC 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. Demolish two buildings at Ft. Campbell (6,389 total SF).

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy:

Federal Acquisition Regulation (FAR) Policy: Pursuant to Executive Order 14063 and FAR Subpart 22.5, it is the policy of the Federal Government to require the use of Project Labor Agreements (PLAs) on large-scale construction projects (exceeding $35 million) to promote economy and efficiency in Federal procurement. An agency may grant an exception to this requirement only under specific circumstances defined in FAR 22.504(d), such as if a PLA would substantially reduce the number of potential offerors to such a degree that the Government cannot meet its requirements at a fair and reasonable price, or if the project involves specialized construction work available from only a limited number of contractors

In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions:

1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.

2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.

3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.

4) Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.

5) Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.

6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project.

7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.

8) Would a PLA requirement substantially reduce the number of potential offerors (including subcontractors) for this project? If yes, please explain how your ability to secure necessary subcontractors would be impacted.

9) Does this project require highly specialized construction work? If so, is this specialized work available from both union and non-union contractors in the local area? Please explain.

10) What is the anticipated cost impact (increase or decrease) of implementing a PLA for this specific project at Ft. Campbell? Please provide an estimated percentage impact and explain the driving factors.

11) How likely are you to submit a proposal on this project if a PLA is required (choose a response):

            1 – My company will not submit a proposal if PLA is required.

             2 – My company only plans to submit a proposal if PLA is required.

Please provide your comments via e-mail to Ranzel Merideth at Ranzel.L.Merideth@usace.army.mil no later than 1:00 PM EST on 23 June 2026.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 16, 2026

    Sources sought

    Due June 16, 2026 at 1:00 PM EDT. SAM.gov, notice 258e0361707d4896b855ddcec7f7064c

    3 revisions on SAM
    • June 23, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 16, 2026: publish, sources sought
  2. June 17, 2026

    Sources sought

    Due June 16, 2026 at 1:00 PM EDT. SAM.gov, notice 967e7698484442d4a08626b328988ef1

    3 revisions on SAM
    • June 23, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 16, 2026: publish, sources sought
  3. June 23, 2026

    Sources sought

    Due June 30, 2026 at 1:00 PM EDT. SAM.gov, notice f8a3a986b8a143aaa501cc0b10f1e498

    3 revisions on SAM
    • June 23, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 16, 2026: publish, sources sought

Points of contact