Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

Rough River LakeAxtel Wastewater Treatment Plant Replacement

W912QR26R-AXWWTP

Department of the Army, W072 Endist Louisville.

Response deadline

September 25, 2026 at 8:00 AM EDT

Closed 36 days ago. Posted September 10, 2026. Scheduled to archive September 10, 2027.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

Description

As published on SAM.gov.

Description of Proposed Work: The U.S. Army Corps of Engineers (USACE), Louisville District, anticipates issuing an Invitation for Bids (IFB) for a firm-fixed-price construction contract to execute the Rough River Lake Axtel Wastewater Treatment Plant Replacement. The overall scope of work comprises the complete demolition and decommissioning of the existing wastewater treatment plant and the construction of a new replacement subsurface sewage treatment and dispersal facility. Primary features of work include, but are not limited to:Demolition and Removal: Demolition and disposal of the existing Axtel Wastewater Treatment Plant, existing chain-link perimeter fencing, and gravel surfacing.Treatment and Disposal System Construction: Construction and installation of a new subsurface wastewater treatment and disposal system, including: Precast concrete primary pretreatment septic tanks conforming to ASTM C1227 and 902 KAR 10:081/085. Precast sewage lift stations, dose stations, and holding tanks. Packaged Aerobic Treatment Unit (ATU) / Advanced Wastewater Treatment System. Soil drip dispersal field and piping network.Piping and Distribution: Installation of gravity sewer piping and pressure piping networks, including supply/return manifolds, flush valves, and air release/vacuum breaker valves.Electrical and Control Systems: Complete electrical service and distribution, including coordination with Meade County RECC for service drop/upgrades, NEMA 4X (316 stainless steel) control enclosures, UL 1449 Type 2 Surge Protective Devices (TVSS), sequencing reactor controls, alarm systems, and associated conduits.Site and Civil Appurtenances: Rough and finish grading, trenching, erosion and sediment control measures, replacement chain-link perimeter security fence and gates with privacy slats, and site restoration.Optional Features: Contract Line Item Schedule includes an optional line item for Rock Excavation (unit-priced per cubic yard).

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 10, 2026

    Presolicitation

    Due September 25, 2026 at 8:00 AM EDT. SAM.gov, notice d4e704a79af04a8ea2441a9ffbf75d5a

    1 revisions on SAM
    • September 10, 2026: publish, presolicitation

Points of contact