Combined synopsis and solicitation, total small business set-aside
Caesar Creek Lake Dike Gravel Overlay
W912QR26QA111
Department of the Army, W072 Endist Louisville. Highway, Street, and Bridge Construction.
Response deadline
September 22, 2026 at 1:00 PM EDT
Closed 40 days ago. Posted September 17, 2026, first published September 8, 2026. Scheduled to archive October 7, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed 40 days ago
36 like it are open now in highway, street, and bridge construction
- FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3 - TX FW LGA 10(5) Steve Thompson Wildlife Drive
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 2 daysNov 3
Description
As published on SAM.gov.
PROJECT TITLE: CAESAR CREEK LAKE DIKE GRAVEL OVERLAY
PROJECT LOCATION: CAESAR CREEK LAKE, 4020 N. CLARKSVILLE RD., WAYNESVILLE, OH
CONTRACTOR WILL PROVIDE ALL MATERIALS, EQUIPMENT, PPE AND LABOR TO SPREAD GRAVEL ALONG CAESAR CREEK DIKE A ACCESS ROAD (BASE CONTRACT) AND DIKE B ACCESS ROAD (OPTION 1). THE CONTRACTOR SHALL EVENLY DISTRIBUTE #57 CRUSHED LIMESTONE GRAVEL AT A DEPTH OF AT LEAST 2 INCHES AND NO MORE THAN 3 INCHES. THE GRAVEL MUST BE UNIFORMED AND LEVEL IN APPEARANCE FILLING ALL EXISTING POTHOLES AND DIVOTS. DIKE A IS APPROXIMATELY 50,000 SQUARE FEET AND DIKE B IS APPROXIMATELY 33,000 SQUARE FEET.
DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION PROJECT: BETWEEN $25,000 AND $100,000.
THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 237310, SIZE STANDARD $45,000,000.00.
IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.
***Amendment 0001***
The Statement of Work (SOW) file has been revised with the following statement, Prior to the commencement of contractor work, the Government will prepare the site by mechanically grading and leveling the access roads for Dike A and Dike B. The revised SOW has been attached to this solicitation and replaces the previous version. The offeror due date remains unchanged. All other terms and conditions remain unchanged.
***Amendment 0001***
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 56cb5f0edcb444f3afa2fddc79678dc50 B, September 8, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 8, 2026
Combined synopsis and solicitation
Due September 22, 2026 at 1:00 PM EDT. SAM.gov, notice 446e3edca4b842ae9ebf23f8775807bb
3 revisions on SAM
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
September 8, 2026
Combined synopsis and solicitation
Due September 22, 2026 at 1:00 PM EDT. SAM.gov, notice 4d18af8a0f2d4462927879b7c82cddcb
3 revisions on SAM
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
September 8, 2026
Combined synopsis and solicitation
Due September 22, 2026 at 1:00 PM EDT. SAM.gov, notice 8252e30fc9314d989db73125ad935c8a
3 revisions on SAM
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
September 17, 2026
Combined synopsis and solicitation
Due September 22, 2026 at 1:00 PM EDT. SAM.gov, notice 95da7bdec3ad4fa8bf4eb436d647f05f
5 revisions on SAM
- September 17, 2026: publish, combined synopsis and solicitation
- September 17, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
September 17, 2026
Combined synopsis and solicitation
Due September 22, 2026 at 1:00 PM EDT. SAM.gov, notice f25e203d59ea4112963fe98d3c8e2cd9
5 revisions on SAM
- September 17, 2026: publish, combined synopsis and solicitation
- September 17, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
- September 8, 2026: publish, combined synopsis and solicitation
Points of contact
- Justin Mcphersonjustin.m.mcpherson@usace.army.mil5023157057