Presolicitation
Fort Cavazos Phantom Warrior Microgrid
W912QR25RA033
Department of the Army, W072 Endist Louisville. Power and Communication Line and Related Structures Construction.
Response deadline
May 30, 2025 at 10:00 AM EDT
Closed 476 days ago. Posted May 7, 2025. Scheduled to archive June 14, 2025.
Description
As published on SAM.gov.
SPECIAL NOTICE: The FY24 NDAA provided separate authority to sole source specific Energy Resilience and Conservation Investment Program (ERCIP) projects where the utility system has been conveyed under 10 USC Section 2688 and only provides services to a military installation. The U.S. Army Corps of Engineers Louisville District (USACE) will be soliciting a proposal for the construction of the Fort Cavazos Phantom Warrior Microgrid.
As part of the construction contract solicitation, the USACE intends to include the following sole source requirement: Dominion Privatization Texas, LLC – This project provides electricity to a cluster of multiple critical loads (2.12MW) and multiple non-critical loads (0.79MW) to serve a total of 2.9MW of load.
The microgrid system will include 3MW of natural gas fueled reciprocating internal combustion engines (RICE), 1.5MW solar photovoltaic (PV) parking canopy array, 1MW battery energy storage system (BESS), automated switches required to isolate, island and blackstart the system, and microgrid controls. These pieces of equipment will connect to the 12.47kV distribution system.
In non-emergency situations, the RICE will be disconnected and the solar will offset load on feeder 2. The isolating switches will isolate a portion of the grid on feeder 2 and 14. This will power multiple critical facilities as well as non-critical loads in the isolation. Once the system is engaged, these loads will continue to receive power from the installation distribution system as usual.
The microgrid will be installed to operate as a stand-alone autonomous electrical power system with capability to provide data link connection to the installation monitoring and control system. The RICE will meet the basic requirement for dispatchable generation at any time as well as establish the voltage and frequency reference for the solar array.
The solar array will assist the generators in meeting the power requirements during daylight hours, provide the installation with power daily, and shade vehicles from the sun.
This solar generation, totaling 1.5MW AC, will be constructed on canopies above the parking lots behind Building 1001. TYPE OF CONTRACT AND NAICS: This contract will be for one (1) Firm-Fixed-Price (FFP) contract will be awarded to Dominion Privatization Texas, LLC. The North American Industrial Classification System Code (NAICS) for this effort is 237130 – Power and Communication Line and Related Structures Construction.
CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $25,000,000 and $100,000,000 in accordance with DFARS 236.204.
ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 30 May 2025. *This is not a solicitation for competitive proposals. This announcement serves as the Advance Notice for this project. Responses to this synopsis are not required.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 7, 2025
Presolicitation
Due May 30, 2025 at 10:00 AM EDT. SAM.gov, notice 0f71f8ff63464fdbb9440bb7e2ab25a2
Points of contact
- Kari Rogerskari.a.rogers@usace.army.mil
Also open from this buyer
- Nolin River Lake Tailwater Restroom ConstructionCombined synopsis and solicitationSmall businessNAICS 236220KentuckyW912QR26QA110Closes todaySep 18
- C.J. Brown Dam and Reservoir Elevator Modernization - Amendment 01Combined synopsis and solicitationNAICS 333921W912QR26QA101Closes todaySep 18
- Soo Lock Fire Alarm ModernizationSolicitationNAICS 236220Sault Ste. Marie, MIW912QR-62373550Closes todaySep 18
- Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinSolicitationNAICS 238910W912QR26QA094Closes todaySep 18
- Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, CaliforniaPresolicitationSmall businessNAICS 236220CaliforniaW912QR27BA001Closes tomorrowSep 19