Skip to content
  • 6,811 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

CLARENCE CANNON NATIONAL WILDLIFE REFUGE HABITAT REHABILITATION AND ENHANCEMENT PROJECT STAGE 5 GRAVITY DRAIN DEBRIS BARRIER SYSTEM

W912P925R0004

Department of the Army, W07V Endist ST Louis. Other Heavy and Civil Engineering Construction.

Response deadline

December 4, 2024 at 11:00 AM EST

Closed 697 days ago. Posted November 13, 2024. Scheduled to archive December 4, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2024

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

USACE St. Louis District is seeking businesses that can provide a debris barrier system at Clarence Cannon National Wildlife Refuge (CCNWR) gravity drain in Annada, Missouri. The gravity drain is along the southern exterior berm of the refuge along Bryant?s Creek. The gravity drain is a concrete structure with a 16 ft wide and 18 ft tall opening. The structure allows water to flow in and out of the refuge by operating an overshot gate.

A bridge deck lays over the gravity drain to allow vehicular access along the berm. The bridge was designed to resist AASHTO HL-93 tandem and lane loads.The project consists of designing and installing a debris barrier system to the existing gravity drain structure that can be raised when operating the gate. The barrier must be removed during the event of water overtopping. The barrier must prevent woody debris from entering the gravity drain. The woody debris ranges from 1 in. to 6 in. in diameter.

A maximum of two workers is desirable to operate and maintain the system. There are no power sources onsite and no permanent power sources are anticipated. The gravity drain holds approximately 4 feet of water when the gate is closed.The proposed design must follow USACE guidance and standards.The following figure shows the overshot gate at the gravity drain. The photo was taken from the refuge side during construction.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 13, 2024

    Sources sought

    Due December 4, 2024 at 11:00 AM EST. SAM.gov, notice 00ea98af290b40a6a9530f3e51a102cc

Points of contact