Solicitation, first published as presolicitation
Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008)
W912P826BA073
Department of the Army, W07V Endist New Orleans. Other Heavy and Civil Engineering Construction.
Response deadline
September 18, 2026 at 11:00 AM EDT
Closed 44 days ago. Posted August 17, 2026, first published July 23, 2026. Scheduled to archive September 18, 2027.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed 44 days ago
132 like it are open now in other heavy and civil engineering construction
- Calcasieu River and Pass, Bar Channel Hopper Dredge Rental Contract No. 2-2025, Cameron Parish, Louisiana. Specification Nos. OM25126
Department of the Army, W07V Endist New Orleans
SolicitationNAICS 237990LouisianaW912P825B0020Closes in 33 daysDec 4 - Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 1-2025, Cameron Parish, Louisiana. Specification Nos. OM25125
Department of the Army, W07V Endist New Orleans
SolicitationNAICS 237990LouisianaW912P825B0019Closes in 33 daysDec 4 - Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 3-2025, Cameron Parish, Louisiana. Specification Nos. OM25127
Department of the Army, W07V Endist New Orleans
SolicitationNAICS 237990LouisianaW912P825B0021Closes in 33 daysDec 4
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
Barataria Bay Waterway, Maintenance Dredging (Non-Continuous) Bayou Rigaud, Jefferson Parish, Louisiana (ED-25-008)
The work consists of removal of all material excavated from the limits of Bayou Rigaud Channel, and satisfactory disposal thereof within the Government furnished disposal area shown and associated retention dike work as specified herein and shown on the Contract Drawings. (The estimated time of completion is 100 calendar days after receipt of Notice to Proceed. The solicitation will include 13 drawings and specifications).
The magnitude of construction range for this dredge project is between $5,000,000 and $10,000,000.
BID OPENING WILL BE SCHEDULED BY AMENDMENT
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Solicitation W912P826BA073.pdf76.6 MB, August 17, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 23, 2026
Presolicitation
SAM.gov, notice 32f663fd308244da97a6c17b85958894
2 revisions on SAM
- August 17, 2026: publish, solicitation
- July 23, 2026: publish, presolicitation
August 17, 2026
Solicitation
Due August 17, 2028 at 1:00 AM EDT. SAM.gov, notice 8bc3ec0f75624f32b942f21208d029fe
3 revisions on SAM
- August 17, 2026: publish, solicitation
- August 17, 2026: publish, solicitation
- July 23, 2026: publish, presolicitation
August 17, 2026
Solicitation, originally presolicitation
Due September 18, 2026 at 11:00 AM EDT. SAM.gov, notice c8685cd6fa2e46beaf09128ed361e455
3 revisions on SAM
- August 17, 2026: publish, solicitation
- August 17, 2026: publish, solicitation
- July 23, 2026: publish, presolicitation
Points of contact
- Leann Thorntonleann.r.thornton@usace.army.mil5048621167
- Katherine Yountskatherine.b.younts@usace.army.mil5044325367