FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas
W912HY26X1B38
Department of the Army, W076 Endist Galveston. Other Heavy and Civil Engineering Construction.
Response deadline
February 4, 2026 at 11:00 AM EST
Closed 276 days ago. Posted January 20, 2026. Scheduled to archive February 19, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
142 like it are open now in other heavy and civil engineering construction
- FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING
Department of the Army, W076 Endist Galveston
SolicitationNAICS 237990TexasW912HY26BA018Closes in 3 daysNov 10 - Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
Department of Veterans Affairs, National Cemetery Admin
Closes in 5 daysNov 12 - USACE Enterprise Dredge Delivery Center Scope Dredge to Budget Shallow Draft
Department of the Army, W074 Endist Wilmington
PresolicitationSmall businessNAICS 237990TexasW912PM27RA008Closes in 12 daysNov 19
All 142 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island.
Schedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimated volume; 125,000 CY. And Hopper dredging of BIH Jetty Channel station -6+000 to 0+000; estimated volume: 225,000 CY.
Placement Area: Near Shore Feeder Berm 1A/1B
Options 1-3: Sea Turtle Trawling 15 days each. No additional time added to contract duration if awarded.
Option 4: Beach Placement at two locations on South Padre Island in lieu of Near Shore Feeder Berm 1A/1B. If awarded, additional time of 14 calendar days will be added to contract duration.
Option 5: Sea Turtle Trawling 15 days. No additional time added to contract duration if awarded.
Dredging and beach placement option are subject to environmental windows for swimming and nesting sea turtles.
Period of Performance: Complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the Notice to Proceed. Completion time for Options 1-5 is 14 calendar days.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 1 - Sources Sought Notice_BIH_W912HY26X1B38_20 Jan 2026.pdf114 KB, January 20, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 20, 2026
Sources sought
Due February 4, 2026 at 11:00 AM EST. SAM.gov, notice 153c06c654c24ddcb37d5c148fdfa10f
2 revisions on SAM
- May 12, 2026: publish, presolicitation