Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

FY26 Houston Ship Channel, Texas Bayport Flare Hopper Dredging

W912HY26

Department of the Army, W076 Endist Galveston. Other Heavy and Civil Engineering Construction.

Response deadline

July 22, 2026 at 11:00 AM EDT

Closed 102 days ago. Posted July 7, 2026, first published July 7, 2026. Scheduled to archive August 6, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

Final Pre-solicitation Synopsis


W912HY26BA018

The U. S. Army Corps of Engineers, Galveston District Office requires a contract for Houston Ship Channel, Texas Bayport Flare Hopper Dredging in Chambers and Galveston County, Texas. Full and Open Competition.

THE WORK CONSISTS OF:
1. Schedule 1 – Project is for Hopper Dredging of the Bayport Flare, Houston Ship Channel, Ocean Dredged Material Disposal Site (ODMDS_ Monitory Surveys, Sea Turtle Protection for Bayport Flare, and Sea Turtle Trawling and Relocation (Schedule 1 and Option 1). Schedule 1 includes dredging of approximately 658,000 cubic yards (CY) of Section 1 Bayport Flare, 645,000 CY of Section 2 Bayport Flare, and 430,000 CY of the Houston Ship Channel. Option 1 is for mobilization and demobilization Sea Turtle Trawler and about 30 days for Sea Turtle Trawling and Relocation.

2. Contractor should be familiar with the traffic conditions of the Houston Ship Channel and have experience as a prime contractor for hopper dredging deep draft navigation channels. Contractor should be able to demonstrate experience producing at least 20,000 CY per day utilizing a hopper trailing suction dredge on a deep draft navigation dredging job.

3. Completion Time for Schedule No. 1 for this project is estimated at 69 calendar days after receipt of the Notice to Proceed. There will be no additional calendar days added to the period of performance if the option is exercised. The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in an amount to be determined for each calendar day of delay until the work is completed or accepted.

4. The solicitation issued will be a firm-fixed price contract award. Estimated magnitude for this effort is estimated between $25,000,000.00 - $100,000,000.00.

5. Bonding Requirements - The Contractor will be required to provide the Performance and Payment Bonds within 5 calendar days after award. The contractor shall begin work within 10 calendar days after receipt of the Notice to Proceed.

6. Furnish pre-award documents within 2 working days after Bid Opening.

Prior Government contract work is not required for submitting a response to the solicitation.

The Solicitation issued will be Firm Fixed Price. This solicitation is subject to the availability of
funds. The Solicitation is a FULL AND OPEN COMPETITION. The Solicitation will be issued on or
about SEPTEMBER 2026. Response date on or about OCTOBER 2026.

The North American Industrial Classification System (NAICS) Code applicable to this project is
237990. The Small Business Size Standard is $37 Million for Dredging and Surface Cleanup
Activities.

Availability of plans and specification on the Procurement Integrated Enterprise Environment
(PIEE) Solicitation Module, DASA(P)POLICY 21-81, DATED 20 AUGUST 2021

Contractors may view and/or download the Invitation for Bid (IFB) and all amendments at the
Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite
at https://piee.eb.mil/ .

Plans and specification will not be available in paper format or on compact disc. It is the
offeror’s responsibility to monitor the PIEE Solicitation Model daily (using the above link) for
plans, specification, and amendments to the solicitation.

All bids are to be submitted per Section 00 21 00, Solicitation Module of the Procurement
Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/.

To register as an “Interested Vendor”, visit https://sam.gov/content/home . Offerors must be
registered with the Systems for Award Management (SAM), in order to receive a government
contract award. To register, the SAM Internet address is: https://sam.gov/content/home .

RECOMMEND OFFERS BE SUBMITTED AT LEAST “2 HOURS” PRIOR TO “RESPONSE TIME” TO
ALLOW FOR ELECTRONIC TRANSMISSION.

ATTENTION TO OFFEROR(s)/CONTRACTOR(s): EFFECTIVE MARCH 22, 2018, YOU MUST
SUBMIT A NOTARIZED LETTER APPOINTING THE AUTHORIZED ENTITY ADMINISTRATOR
BEFORE YOUR REGISTRATION WILL BE ACTIVATED. THIS REQUIREMENT NOW APPLIES TO
BOTH NEW AND EXISTING ENTITIES. MAKE SURE YOUR SAM PROFILE INCLUDES “ALL
AWARDS” AND NOT JUST “FEDERAL ASSISTANCE AWARDS” AS THIS OPTION IS ONLY FOR
GRANTS AND COOPERATIVE AGREEMENTS. PLEASE VISIT https://sam.gov/content/home

FOR MORE INFORMATION.

The Contract Specialist for this Solicitation will be Ms. Sarah Eisele; E-mail:
Sarah.M.Eisele@usace.army.mil.

IAW FAR 52.219-9 Alt I, a subcontracting plan will be required of the successful offeror if
awarded to a large business and the contract amount is in excess of $1.5 million in the
percentage of 49% for SB, 4% for SDB, 5% for WO, 25% for HZ, 25% for VO and 24% for SDV.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 7, 2026

    Presolicitation, originally sources sought

    FY26 HSC Bayport Flare Dredging

    Due July 22, 2026 at 11:00 AM EDT. SAM.gov, notice dd51dae709fc41a8acb47621be25b85b

    3 revisions on SAM
    • July 7, 2026: publish, presolicitation
    • July 7, 2026: publish, presolicitation
    • October 22, 2025: publish, sources sought
  2. July 7, 2026

    Presolicitation

    Due July 22, 2026 at 11:00 AM EDT. SAM.gov, notice f28fa46270024c13b3df1ad69076c165

    3 revisions on SAM
    • July 7, 2026: publish, presolicitation
    • July 7, 2026: publish, presolicitation
    • October 22, 2025: publish, sources sought

Points of contact