Skip to content
Abierto

Sources sought

USACE Mouth of Colorado Maintenance Dredging with Sargent Beach, Beneficial Use, Breakwaters, and Beach Placement, Matagorda County, Texas

W912HY25X12N5

Department of the Army, W076 Endist Galveston. Other Heavy and Civil Engineering Construction.

Response deadline

December 18, 2024 at 3:00 PM EST

Closed 639 days ago. Posted November 26, 2024. Scheduled to archive January 2, 2025.

Description

As published on SAM.gov.

Schedule 1 will include dredging of approximately 820,000 Cubic Yards (CYs) of the Mouth of Colorado Entrance Jetty Channel and Detention Basin and will include varying advanced maintenance and 2' over-depth. Material will be placed west of west/south Jetty in nearshore zone; Construction of Terminal Groin and 4 of the 5 planned nearshore breakwaters at Sargent Beach, 25 miles east of the Mouth of Colorado. Estimate duration is 270 Calendar Day (CD) for construction of groin and breakwaters and 90 CD for dredging.

And 3 Options for beach placement and construction of 5th nearshore breakwater. Placement of material will include both beach placement and upland confined placement. Sources Sought attached fur further informaiton.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 26, 2024

    Sources sought

    Due December 18, 2024 at 3:00 PM EST. SAM.gov, notice 5195061ef69148499778b8815115b1e0

Points of contact