Skip to content
Abierto

Sources sought

USACE Sabine-Neches Waterway Channel Improvement Project, Port Arthur Canal, Taylor's Bayou, Pipeline Dredging in

W912HY25X12M6

Department of the Army, W076 Endist Galveston. Other Heavy and Civil Engineering Construction.

Response deadline

December 16, 2024 at 3:00 PM EST

Closed 641 days ago. Posted November 25, 2024. Scheduled to archive December 31, 2024.

Description

As published on SAM.gov.

Contractor should demonstrate construction experience as a prime contractor for Pipeline Dredging, Deep Draft Navigation Channels. Contractor should demonstrate experience in excavating 26,000 Cubic Yards (CYs) per day utilizing a Pipeline Dredge on a Deep Draft Navigation Dredging requirement. The Estimated Number of CYs to be removed for this requirement is Six (6) Million. In addition to the dredging requirements, this project will also require a Sheet Pile Wall that will need to be constructed along the channel. The Estimated Linear Feet (LF) for this wall is 1,400. Sources Sought notice is attached for further details

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 25, 2024

    Sources sought

    Due December 16, 2024 at 3:00 PM EST. SAM.gov, notice ab6232a0833147eabba630bf4237fa1f

Points of contact