Sources sought
W912HN24S5000 - Brunswick Harbor Modifications Project Construction, Glynn County
W912HN24S5000
Department of the Army, W074 Endist Savannah. Other Heavy and Civil Engineering Construction.
Response deadline
January 8, 2024 at 2:00 PM EST
Closed 984 days ago. Posted August 21, 2024. Scheduled to archive January 23, 2024.
Description
As published on SAM.gov.
The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform Brunswick Harbor Modifications Project Construction located in Glynn County, GA. This request does not obligate the Government in any way to post a solicitation or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS is 237990 with a size 27.5 million.
The potential magnitude for this requirement is estimated at more than $10,000,000 dollars. Inquiry will only be accepted via email to Contract Specialist, Mr. Rohan Bryan at rohan.a.bryan@usace.army.mil, or Contracting Officer, Ms. Glenda Canty at glenda.a.canty@usace.army.mil. The request for Information Sheet should be completed and submitted no later than January 8, 2024, at 2:00 pm, Eastern Standard Time. THIS IS NOT A SOLICITATION. THIS POSTING IS A SOURCES SOUGHT NOTICE ONLY.
The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable over depth dredging).
Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel’s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable over depth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew’s Island DMCA.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 21, 2024
Sources sought
Due January 8, 2024 at 2:00 PM EST. SAM.gov, notice a79cb57430d24772964263d02e1cc692
Points of contact
- Rohan Bryanrohan.a.bryan@usace.army.mil9126525619
- Glenda Cantyglenda.a.canty@usace.army.mil9126525030
Also open from this buyer
- Master Breacher Course (Construction Project) on Griswold Range for the Regimental Special Troops Battalion of the 75th Ranger Regiment in Fort Benning, Georgia.Sources soughtNAICS 236220Columbus, GAW912HNA050451Closes in 15 daysOct 3
- Market Research for FY 27 South Georgia Optimized Remediation ContractSources soughtNAICS 562910GeorgiaW912HN26S1001Closes in 21 daysOct 9
- Infantry Platoon Battle Course (IPBC) Fort Bragg, North CarolinaSolicitationNAICS 236220W912HN26BA005Closes in 27 daysOct 15
- Armed Forces Career Center - Greensboro, North CarolinaSolicitationNAICS 5311Greensboro, NCW912HN-27-GREENSBORO-NC-RELO-6004Closes in 362 daysSep 15, 2027