Skip to content
Abierto

Award notice, total small business set-aside, first published as presolicitation

Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements

W912HN24B5004

Department of the Army, W074 Endist Savannah. Other Heavy and Civil Engineering Construction.

Awarded

Herve Cody Contractor LLC

$12,703,191.73 obligated so far on USAspending

Description

As published on SAM.gov with the solicitation of July 31, 2024.

The abstract is posted as of 31 July 2024.

Amendment 4 amends the specifications and extends the date bids are due from 24 July 2024 at 12:00 pm to 25 July 2024 at 1200 pm.

Amendment 3 amends specifications and drawings.

Amendment 0002 extends the date bids are due from 17 July 2024 at 12:00 pm to 24 July 2024 at 12:00 pm.

Amendment 0001 to include a site visit on 20 June 2024 at 10:00 am. Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW.

The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike.

Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
NYRFDK7TH454
CAGE
5GJ49
Vendor location
Robbinsville, NC
Contract
W912HN24C5006, definitive contract
Obligated
$12,703,191.73
Actions
7 between August 30, 2024 and March 12, 2026
Competition
Full and Open Competition After Exclusion of Sources, 5 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Savannah Harbor Expansion Project (Shep) 14A Dike Raising and Weir Improvements
Match
award number W912HN24C5006 equals the contract number; same awarding office W912HN (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 23, 2024

    Presolicitation

    Savannah Harbor Expansion (SHEP) 14A Dike Raising and Weir

    Due July 17, 2024 at 12:00 PM EDT. SAM.gov, notice c332f924bbec452d948000645e3b89cc

  2. June 6, 2024

    Solicitation

    Due July 17, 2024 at 12:00 PM EDT. SAM.gov, notice c2ce2fc08a384ab1ae62cf69c1ac3654

  3. June 13, 2024

    Solicitation

    Due July 17, 2024 at 12:00 PM EDT. SAM.gov, notice fb27c445ce244b369a5b2057a3b8c8e1

  4. June 17, 2024

    Solicitation

    Due July 17, 2024 at 12:00 PM EDT. SAM.gov, notice a8be0f8aa74546e39eaf4674a0c3679c

  5. June 21, 2024

    Solicitation

    Due July 17, 2024 at 12:00 PM EDT. SAM.gov, notice 53e4215c53f4403ca6b23dec9b51631a

  6. June 28, 2024

    Solicitation

    Due July 17, 2024 at 12:00 PM EDT. SAM.gov, notice bb9a8acbaaff42bda2aa3704d3511c2e

  7. July 3, 2024

    Solicitation

    Due July 24, 2024 at 12:00 PM EDT. SAM.gov, notice 1d5839b709be49dc9bc06e289ba0243b

  8. July 17, 2024

    Solicitation

    Due July 24, 2024 at 12:00 PM EDT. SAM.gov, notice 8e1bccd3eb4a42ffa3804aab1ea3d2a4

  9. July 18, 2024

    Solicitation

    Due July 25, 2024 at 12:00 PM EDT. SAM.gov, notice 705c4e8800c7417f83e0b4f145e36004

  10. July 23, 2024

    Solicitation

    Due July 25, 2024 at 12:00 PM EDT. SAM.gov, notice 16412bb40e6f4b83b27342b248978b21

  11. July 31, 2024

    Solicitation

    Due July 25, 2024 at 12:00 PM EDT. SAM.gov, notice 65aedbd993064285982f16e2129efaf0

  12. August 30, 2024

    Award notice, originally solicitation

    Awarded to HERVE CODY CONTRACTOR LLC Robbinsville for $12,257,625. SAM.gov, notice 23752813c9b941009bd008f62d512e99

Points of contact