Solicitation, total small business set-aside
Inspection of a Radial Thrust Bearing Assembly
W912ES26QA0110001
Department of the Army, W07V Endist ST Paul. Measuring, Dispensing, and Other Pumping Equipment Manufacturing.
Response deadline
December 30, 2025 at 3:00 PM EST
Closed 312 days ago. Posted December 17, 2025. Scheduled to archive January 14, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
48 like it are open now in measuring, dispensing, and other pumping equipment manufacturing
- SERFILCO PUMPS FOR PLATING SHOP
Department of the Air Force, FA8132 AFSC Pzimc
Combined synopsis and solicitationSmall businessNAICS 333914Anywhere in the USFA813227Q0004Closes in 2 daysNov 9 - PUMP,CENTRIFUGAL
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationHUBZoneNAICS 333914Anywhere in the USSPE7M127T1691Closes in 3 daysNov 9 - NOZZLE,FUEL AND OIL SE
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333914Anywhere in the USSPE8EE27T0348Closes in 3 daysNov 9
All 48 open in measuring, dispensing, and other pumping equipment manufacturing
Description
As published on SAM.gov.
Statement of Work (SOW)
Radial Thrust Bearing Assembly Inspection and Repair
1. Scope
This Statement of Work (SOW) defines a two-part effort for the inspection and repair of the radial thrust bearing assembly installed on the VOSTA HPD 550-1350-280 dredge pump.
Phase 1 – Inspection, Report, and Repair Estimate
The contractor shall perform a full inspection of the radial thrust bearing assembly to document component condition, identify the cause of oil leakage, and produce a written inspection report with a detailed repair/replacement cost estimate. The phase 1 price will include return shipping to the Corps’ FCSB location.
Phase 2 – Repair and Replacement (Upon Government Approval)
Repair or replacement activities shall occur only after the Government issues written approval. The objective is to restore the assembly to full operational capability in accordance with OEM and industry standards.
Oil leakage has been observed at the seals; therefore, special attention shall be given to seal condition, integrity, and lubrication during both inspection and repair.
The Corps reserves the right to compete the repair among other vendors. Should the firm awarded the inspection contract not win the contract for repair work the unit will be, reassembled (if needed), safely packaged, and returned to the Corps’ FCSB location no later than 14 business days from notification.
2. Applicable Documents
The following documents shall guide this effort.
The contractor shall have permission for use and access to the following company provided documents:
- VOSTA HPD 550-1350-280 Operation and Maintenance Manual
- OEM technical drawings, specifications, and service bulletins
The work shall comply with the latest revisions of the following standards:
Standard
Description
ISO 13709 / API 610
Centrifugal Pumps for Petroleum, Petrochemical, and Natural Gas Industries (primary heavy-duty pump specification).
ISO 5199
Technical specifications for centrifugal pumps — Class II.
ISO 281
Rolling bearings — Dynamic load ratings and rating life.
ISO 1940-1
Mechanical vibration — Balance quality for rigid rotors.
ANSI/ABMA 9
Load Ratings and Fatigue Life for Ball Bearings.
ANSI/ABMA 11
Load Ratings and Fatigue Life for Roller Bearings.
ANSI/ABMA 7
Shaft and Housing Fits for Metric Radial Ball and Roller Bearings.
ANSI/EASA AR100
Recommended practice for repair of rotating electrical apparatus—Section 2.2 regarding bearings.
3. Requirements
3.1 Phase 1 – Inspection Requirements
The contractor shall:
- Perform a complete inspection of the radial thrust bearing assembly to identify wear, damage, or defects.
- Document the condition of all bearing components, including races, rollers, cages, seals, lubrication channels, and other related parts.
- Evaluate and document the source and extent of oil leakage, including photographs and corrective recommendations.
- Provide a written inspection report identifying components requiring replacement.
- Include photographic documentation of all damaged or worn components.
- Provide a detailed cost estimate for repairs or replacements, including part lead times.
3.2 Phase 2 – Replacement of Damaged Components (Upon Approval)
The contractor shall:
- Remove and replace only Government-approved components identified in Phase 1.
- Use OEM-certified replacement parts only.
- Install components using OEM procedures and correct torque specifications.
- Apply proper lubrication, seals, and fasteners in accordance with OEM guidance.
- Document all replaced components with photographs.
3.2.1 Government Approval Requirement
No removal, replacement, or repair work shall begin without written authorization from the Contracting Officer (CO). Any unauthorized repair work shall be performed at no cost to the Government.
3.3 Testing and Verification – to be priced as part of any repair submission.
After completion of approved repairs, the contractor shall:
- Perform alignment and functional checks.
- Verify rotational performance, load capacity, and lubrication flow per OEM standards.
- Provide documentation of all test results.
4. Materials and Workmanship
- All replacement parts shall be new, OEM-certified, and free of defects.
- All work shall comply with OEM instructions and accepted industry best practices.
- Personnel performing the work shall be qualified in heavy-duty pump bearing maintenance.
5. Deliverables
The contractor shall provide:
- Phase 1 inspection report, including findings, required replacements, and photos.
- Repair cost estimate.
6. Quality Assurance and Acceptance
Government representatives may witness inspection, repair, and testing activities.
Final acceptance shall be based on:
- Compliance with this SOW
7. Schedule
- The contractor shall submit a detailed schedule for inspection, reporting, approval, repair, and testing no later than 15 January 2026.
- All work, to include any authorized repair, shall be completed no later than 15 March 2026.
8. Shipping, Delivery, and Reporting
- The contractor is responsible for all shipping costs and logistics for transporting the unit to and from their facility.
- The unit is Approx. 8,000 pounds, is on cribbing and can be loaded and unloaded from/to the Army Corp. facility 0730-1500 Mon-Friday.
- Loading/unloading from Corp. facility shall be completed by the contractor.
- Pick up/Shipping Address:
431 North Shore Drive
PO Box 397
Fountain City, WI 54629 - All documentation shall be submitted to the Government Technical Point of Contact (TPOC).
- All replaced components shall be returned to the Government for inspection and final disposition.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Solicitation - W912ES26QA011.pdf2.6 MB, December 17, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 17, 2025
Solicitation
Due December 30, 2025 at 3:00 PM EST. SAM.gov, notice 4f619ff4e4cf451aadecb9352ed8b130
1 revisions on SAM
- December 17, 2025: publish, solicitation