Skip to content
Abierto

Sources sought

Solar Photovoltaic Microgrid

W912ER26R0003

Department of the Army, W076 Endist Middle Eas. Other Heavy and Civil Engineering Construction.

Response deadline

December 6, 2025 at 3:00 PM EST

Closed 286 days ago. Posted November 6, 2025, first published November 6, 2025. Scheduled to archive December 7, 2025.

Description

As published on SAM.gov.

THIS IS A SOURCES SOUGHT NOTICE FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. The Middle East District is seeking interest and capabilities of experienced construction contractors capable of performing the work. The work includes installing a renewable energy system at Isa Air Base and incidental related work. Provides a 1000-kilowatt renewable energy solar ground mounted array on undeveloped dirt land located at north-east side of Logistic Support Area (LSA), Isa Air Base Bahrain.

The project includes construction of renewable energy solar panels, invertors, wiring of protective devices, grounding conductors, lightning protection, automatic metering system and battery storage. The energy storage system shall be connected to the installation's primary electrical distribution grid and shall be capable of functioning as a component of a microgrid subsystem which is connected with other distributed generation and critical loads within LSA site.

The project will include (2) 500Kwh storage battery system and microgrid infrastructure to work as a backup generator for reverse osmosis (RO) plant and utility services building. Site preparations include excavation, trenching, utilities, paving, site improvements, grading, leveling and compaction of existing undeveloped dirt land. Paving and site improvements include asphalt and gravel paving existing asphalt pavement replacement and (fire department access), and security fencing.

Special foundation features include reinforced concrete foundations for the BESS, Inverter, and PV Disconnect. P-181 is the Base Bid, while P-183 is optional. Electrical utilities include utility trenches, direct current (DC) and alternating current (AC) cabling, underground ducts and manholes, conduit, step-up transformers with primary and secondary over-current protection and lighting. Also includes construction of reinforced concrete pad for battery storage and other utility accessories.

Communication utilities include utility trenches, ducts and manholes, conduit, and fiber optic cabling. Water utilities include non-potable fire water distribution system including fire hydrants, connections, fittings, and valves. The new water system will also be extended and provide service connections for maintenance. A total of 40 quick release yard hydrants are needed, two for each solar array group. 20 Hydrants for the base bid, with 20 additional hydrants as part of the option.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 6, 2025

    Sources sought

    Due December 6, 2025 at 3:00 PM EST. SAM.gov, notice 50ab4cc5c6c84eab83ccb40ae885e979

  2. November 6, 2025

    Sources sought

    Due December 6, 2025 at 3:00 PM EST. SAM.gov, notice d1a52f33bcbd4405af325cacda6ded8c

Points of contact