Skip to content
Abierto

Solicitation, first published as presolicitation

Fort Pierce Beach Renourishment St. Lucie County, Florida

W912EP25B0011

Department of the Army, W074 Endist Jacksnvlle. Other Heavy and Civil Engineering Construction.

Response deadline

January 21, 2025 at 1:00 PM EST

Closed 605 days ago. Posted February 18, 2025, first published December 6, 2024. Scheduled to archive February 21, 2025.

Description

As published on SAM.gov.

Project Description Project work includes construction of a beach berm along approximately 5,400 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-39. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters.

Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area.

Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring.The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the Notice to Proceed (NTP) and be off the beach no later than 15 May 2025 for Area B and 30 May 2025 for Area A, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 June 2025. For clarification: - Area A is the area between the south jetty (pump off location) Florida Department of Environmental Protection (FDEP) Range monument R-34 to R-37 where our contractor will need to be off the beach by 30 May 2025. - Area B is south of R-37 where all beach fill activities will need be out of that area by 15 May 2025.A Pre-Bid Conference will be held virtually on Tuesday, December 31, 2024 at 10:00 AM, EST. Please utilize the link and call information provided below:

Webex Link: https://usace1.webex.com/meet/nicole.m.batista-cruzAudio Teleconference: 1-844-800-2712Access code: 199 262 9798

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 6, 2024

    Presolicitation, originally sources sought

    FORT PIERCE BEACH RENOURISHMENT 2025, ST. LUCIE COUNTY, FLORIDA

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice 22e038c04f224c38be3aa13e3a7d09d0

  2. December 20, 2024

    Solicitation

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice d65d321993d0464890464f0f9e161ec5

  3. December 31, 2024

    Solicitation

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice 1706bd8971494bf4a94bbfab53951a52

  4. January 16, 2025

    Solicitation

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice 65858cb7b4ba498c8fa12d07f1425602

  5. January 22, 2025

    Solicitation

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice 0022ec22b1544859aeb240aacc294bb8

  6. February 14, 2025

    Solicitation

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice 7141c988493a4dd9bde94450d3094d46

  7. February 18, 2025

    Solicitation

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice 2a9b501af3a642c09e0cbe75845bf650

  8. February 18, 2025

    Solicitation

    Due January 21, 2025 at 1:00 PM EST. SAM.gov, notice c69fc1edc3f645eabc9a8f16c28ac9c9

Points of contact