Skip to content
  • 6,705 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDA

W912EP24R0001

Department of the Army, W074 Endist Jacksnvlle. Other Heavy and Civil Engineering Construction.

Response deadline

January 16, 2025 at 1:00 PM EST

Closed 656 days ago. Posted June 11, 2024, first published March 7, 2024. Scheduled to archive June 11, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

TITLE: CENTRAL EVERGLADES PLANNING PROJECT (CEPP), SOUTH PHASE, CONTRACT 2A, S-356E PUMP STATION AND S-334E SPILLWAY PROJECT, MIAMI-DADE COUNTY, FLORIDADESCRIPTION OF WORK:As noted above, the CEPP South, Contract 2A, S-356E Pump Station and S-334E Spillway project is in western Miami-Dade County at the intersection of the L-29 Canal, the L-30 Canal, and the L-31N Borrow Canal.

The structures will be constructed in the L- 29 Canal, adjacent Tamiami Trail (US-41), approximately 1/4 mile east of the existing S-334 Spillway and the temporary S-356 Pump Station. The project work includes excavation, dewatering, blasting, and construction for a new levee system, a new pump station structure, a new spillway structure, and a steel pile bulkhead wall. The overall site is approximately 20 acres, north of the site is Water Control Area 3 (WCA3).

Specific major project components include the following items:1. A new levee system located along the northern side of the project site, approximately 1,600-feet long, with a crest width of 16.0 feet with 3H:1V side slopes.2. A new pump station structure has a total pumping capacity of 1,250 cubic feet per second (cfs) that consists of four (4) 250 cfs diesel motor driven pumps and two (2) 125 cfs electric motor driven pumps, superstructure, substructure, service bridge, and vehicle access ramps.3.

A new spillway structure with a design capacity of 1,200 cfs with two (2) bays, vertical lift roller gate, and a service bridge.4. Both structures will have an anchored steel pile bulkhead wall located at the intake bay and discharge of the pump station5. The installation of rip rap slope protection along the canal banks and canal bottom of the L-29 canal. The estimated period of performance is 2548 calendar days after issuance of Notice to Proceed with 90 days to commence performance after award.

Offerors shall submit an offer subject to Project Labor Agreement (PLA) requirements in accordance with FAR 22.504, General requirements for project labor agreements. Any PLA reached pursuant to the PLA requirements in the solicitation does not change the terms of the contract or provide for any price adjustment by the Government.

Pre-proposal conference information will be provided on a later date.

PROPOSAL REQUIREMENTS: Award will be made to the offeror whose proposal represents the best value to the Government utilizing the Best Value Tradeoff Process. Proposals will be evaluated in the areas of Technical Merit, Past Performance, Small Business Participation, and Price. A fourth non-price factor will be assessed by the Government: namely, the submission of a Project Labor Agreement.

The anticipated magnitude of construction per DFARS 236.204 is between $100,000,000 and $250,000,000.THIS SOLICITATION IS UNRESTRICTED. This solicitation will issued on or about Thursday, 05 December 2024 with receipt of proposals on or about Thursday, 16 January 2025. Solicitation will be issued in electronic format only and will be posted on the Procurement Integrated Enterprise Environment (PIEE) website.

The PIEE website can be found at https://piee.eb.mil/In order to receive notification of any amendments to the solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the sam.gov website. If you are not registered, the Government is not responsible with providing you with notification of any changes to the solicitation. You must be registered in the System for Award Management (SAM) in order to receive an award from the solicitation. The SAM website can be located at https://sam.gov.The Pre-proposal Conference information will be provided with the solicitation posting.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 7, 2024

    Presolicitation

    Due May 6, 2024 at 2:00 PM EDT. SAM.gov, notice 684977b3d9e74bbe8c16351d79ffb159

  2. March 14, 2024

    Presolicitation

    Due May 6, 2024 at 2:00 PM EDT. SAM.gov, notice 432afc53f3ed4c44b8b9582b7e89ab77

  3. June 11, 2024

    Presolicitation

    Due January 16, 2025 at 1:00 PM EST. SAM.gov, notice 88c76756456d49c9a8d62280b2922465

Points of contact