Special notice
Brandon Road Interbasin Project Industry Day - 7 April 2026
W912EK26BRIPID
Department of the Army, W07V Endist Rock Island. Other Heavy and Civil Engineering Construction.
Response deadline
April 7, 2026 at 9:30 AM EDT
Closed 208 days ago. Posted March 27, 2026. Scheduled to archive April 22, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
132 like it are open now in other heavy and civil engineering construction
- GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes tomorrowNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes tomorrowNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990New JerseyW912PM27BA004Closes tomorrowNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The U.S. Army Corps of Engineers, Rock Island District invites you to an Industry Day on Tuesday 7 April 2026 from 8:30am – 12:00pm for the Brandon Road Interbasin Project.
Agenda
8:30 - 9:00 a.m. Check-In
9:30 - 11:30 a.m. Presentation and Question and Answer Session
Location:
Davenport River Center - Arkansas Room
136 E 3rd St
Davenport, Iowa 52801
**Please see the following link for registration for the Brandon Road Interbasin Project Industry Day.**
https://forms.osi.apps.mil/r/EGBRszaBQX
This is your opportunity to learn about this significant infrastructure project and how your company can be a part of it.
Project Overview:
The Brandon Road Interbasin Project is a critical control point in preventing Invasive Species, including Invasive Carp fish, from becoming established in the Great Lakes. This project will construct a series of deterrent measures in the lock chamber and approach channel. Once complete, a series of electric, hydroacoustic, and bubble deterrents will be operational while facilitating river navigation traffic. The project is broken into 3 construction increments (shown below). This presentation will focus on Increment II – Flushing Lock and Right Descending Bank Construction Contract. The purpose of this engagement is to provide contractors awareness of the upcoming contract and also to solicit feedback during this presentation regarding ways to improve the design to allow for more efficient and cost-effective construction.
The project is designed in 3 construction increments, as follows:
Increment I - Leading Edge
- Automated Barge Clearing (ABC) Deterrent
- Bubble Curtain Deterrent
- Acoustic Deterrent (Leading Edge)
- Leading Edge Support Facilities
- Upstream Boat Ramp
- Channel Rock Excavation
Increment II – Flushing Lock and Right Descending Bank
- Flushing Lock (FL)
- Right Descending Bank (RDB) Wall
- Channel Rock Excavation
Increment III - Engineered Channel
- Electric Deterrent
- Acoustic Deterrent (Eng Channel)
- Support Facilities Building
- Engineered Channel Floor & Walls
- Downstream Boat Ramp
Industry Day Highlights:
- Attend the presentation with detailed information about the project scope, timeline, and specific requirements for each phase.
- Get your questions answered by USACE representatives and project engineers during Q&A.
- Provide feedback on how to improve design to allow for more efficient and cost-effective construction.
- Network with potential prime contractors, subcontractors, and suppliers to explore partnerships and innovative solutions.
Presentation will include:
- Project Background
- Construction Phasing and Sequencing
- Status of Increment II Design
- Details of Increment II Design
- Industry Questions
**Draft Plan Sets for the Flushing Lock and RDB Wall are attached below in the Attachments/Links section**
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Draft Plan Set - Flushing Lock - April 2026 Industry Day.pdf73.4 MB, March 27, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 27, 2026
Special notice
Due April 7, 2026 at 9:30 AM EDT. SAM.gov, notice 78b78b8cb98b470985e34312a7c3ed20
1 revisions on SAM
- March 27, 2026: publish, special notice
Points of contact
- Samantha Johansonsamantha.k.johanson@usace.army.mil