Solicitation
Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
W912EK25RA018SOL
Department of the Army, W07V Endist Rock Island. Other Heavy and Civil Engineering Construction.
Response deadline
August 11, 2025 at 3:00 PM EDT
Closed 448 days ago. Posted July 31, 2025, first published June 18, 2025. Scheduled to archive August 26, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
132 like it are open now in other heavy and civil engineering construction
- GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes todayNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes todayNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990New JerseyW912PM27BA004Closes todayNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
Project Title: Mississippi River Basin, Keokuk, IA, Lock 19 Nose Pier Replacement and Bulkhead Recess See Section 01-11-00 of the Specifications for the Scope Of Work Estimated Range: $25,000,000 - $100,000,000 Completion Days: 638 Consecutive Calendar Days, 973 Consecutive Calendar Days If Option 2 Is Awarded NAICS Code: 237990 - Size Standard $45,000,000 Unrestricted - Lowest Price Technically Acceptable (LPTA) Questions regarding this project shall be submitted via Projnet. The US Army Corps of Engineers (USACE) Rock Island District has a requirement for a Nose Pier Replacement and Bulkhead Recess at Lock 19, Keokuk, IA. The work includes but is not limited to:
a base bid and two options. The base bid extends the river wall monolith upstream and includes mobilization, hydrographic surveys, concrete removal above and underwater, mechanical dredging, underwater rock excavation, monolith extension using precast concrete segments and tremie concrete placement, checkposts and other appurtenances, fabrication of protection plate assembly, and electrical work.
Option 1 constructs a bulkhead recess in the land wall and includes fabrication and installation of a cofferbox, concrete removal above and underwater, fabrication and installation of a bulkhead recess, concrete placement above and underwater, fabrication and installation a of protection plate assembly, and electrical work.
Option 2 constructs the bulkhead sill and includes mobilization, hydrographic surveys, mechanical dredging, drilled shafts, stay-in-place formwork, and tremie concrete placement, and test dewatering of the upstream chamber from the new bulkhead sill to the guard gate, bulkheads will be government furnished equipment.
Updates:
06/24/2025: This is a reminder that the Pre-Bid Site Visit is scheduled for June 30, 2025 at 10:00 AM CT. Please see PREPROPOSAL MEETING NOTICE in the solicitation for further details.
06/25/2025:
Amendment 0001 (located in attachments) - Adds additional highlighted requirements for the Preproposal Meeting Notice and adds FAR 52.242-5 Payments to Small Business Subcontractors.
07/01/2025: Added the L19 Pre-Bid Meeting Signup sheet to the attachments.
07/16/2025: Added the L19 site visit sheet to the attachments.
07/18/2025:
Amendment 0002 (located in attachments) - Revises Schedule of Prices and Source Selection Plan, updates specifications and plans, and extends bidder inquiry period and proposal due date.
07/20/2025: Added SF 1442 updated for Amendment 0002 (located in attachments).
07/30/2025:
Amendment 0003 (located in attachments) - Revises Schedule of Prices, Specifications, Plans, and Source Selection Plan and updates wage determnation.
07/31/2025: Added addtional L19 site visit sheet to the attachments.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 18, 2025
Solicitation, originally presolicitation
Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice e8b245f9443f41e5b8e31cc88e5ac883
June 24, 2025
Solicitation
Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice ace24d1a5fa44cfda27f8384f05535dc
June 25, 2025
Solicitation
Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice cb36cb19fbec4868a2c4419085a36655
July 2, 2025
Solicitation
Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice 02c227a805044884ae64a2d39a3465d2
July 18, 2025
Solicitation
Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice ffbb0005558a4269907faa2232ed326c
July 23, 2025
Solicitation
Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice c9e0107cbdee40cc9fa78909cb97aacc
July 30, 2025
Solicitation
Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice 1782773176234bf295d99eb0bd86c289
July 31, 2025
Solicitation
Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice fcfcc0526a8047809e2f5d31c75a2eb0
Points of contact
- Bobbi Boehbobbi.s.boeh@usace.army.mil3097945943
- Jeffrey R. VossJeffrey.R.Voss@usace.army.mil3094459901