Skip to content
  • 6,946 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation

Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses

W912EK25RA018SOL

Department of the Army, W07V Endist Rock Island. Other Heavy and Civil Engineering Construction.

Response deadline

August 11, 2025 at 3:00 PM EDT

Closed 448 days ago. Posted July 31, 2025, first published June 18, 2025. Scheduled to archive August 26, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

Project Title: Mississippi River Basin, Keokuk, IA, Lock 19 Nose Pier Replacement and Bulkhead Recess See Section 01-11-00 of the Specifications for the Scope Of Work Estimated Range: $25,000,000 - $100,000,000 Completion Days: 638 Consecutive Calendar Days, 973 Consecutive Calendar Days If Option 2 Is Awarded NAICS Code: 237990 - Size Standard $45,000,000 Unrestricted - Lowest Price Technically Acceptable (LPTA) Questions regarding this project shall be submitted via Projnet. The US Army Corps of Engineers (USACE) Rock Island District has a requirement for a Nose Pier Replacement and Bulkhead Recess at Lock 19, Keokuk, IA. The work includes but is not limited to:

a base bid and two options. The base bid extends the river wall monolith upstream and includes mobilization, hydrographic surveys, concrete removal above and underwater, mechanical dredging, underwater rock excavation, monolith extension using precast concrete segments and tremie concrete placement, checkposts and other appurtenances, fabrication of protection plate assembly, and electrical work.

Option 1 constructs a bulkhead recess in the land wall and includes fabrication and installation of a cofferbox, concrete removal above and underwater, fabrication and installation of a bulkhead recess, concrete placement above and underwater, fabrication and installation a of protection plate assembly, and electrical work.

Option 2 constructs the bulkhead sill and includes mobilization, hydrographic surveys, mechanical dredging, drilled shafts, stay-in-place formwork, and tremie concrete placement, and test dewatering of the upstream chamber from the new bulkhead sill to the guard gate, bulkheads will be government furnished equipment.

Updates:

06/24/2025: This is a reminder that the Pre-Bid Site Visit is scheduled for June 30, 2025 at 10:00 AM CT. Please see PREPROPOSAL MEETING NOTICE in the solicitation for further details.

06/25/2025:

Amendment 0001 (located in attachments) - Adds additional highlighted requirements for the Preproposal Meeting Notice and adds FAR 52.242-5 Payments to Small Business Subcontractors.

07/01/2025: Added the L19 Pre-Bid Meeting Signup sheet to the attachments.

07/16/2025: Added the L19 site visit sheet to the attachments.

07/18/2025:

Amendment 0002 (located in attachments) - Revises Schedule of Prices and Source Selection Plan, updates specifications and plans, and extends bidder inquiry period and proposal due date.

07/20/2025: Added SF 1442 updated for Amendment 0002 (located in attachments).

07/30/2025:

Amendment 0003 (located in attachments) - Revises Schedule of Prices, Specifications, Plans, and Source Selection Plan and updates wage determnation.

07/31/2025: Added addtional L19 site visit sheet to the attachments.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 18, 2025

    Solicitation, originally presolicitation

    Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice e8b245f9443f41e5b8e31cc88e5ac883

  2. June 24, 2025

    Solicitation

    Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice ace24d1a5fa44cfda27f8384f05535dc

  3. June 25, 2025

    Solicitation

    Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice cb36cb19fbec4868a2c4419085a36655

  4. July 2, 2025

    Solicitation

    Due August 4, 2025 at 3:00 PM EDT. SAM.gov, notice 02c227a805044884ae64a2d39a3465d2

  5. July 18, 2025

    Solicitation

    Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice ffbb0005558a4269907faa2232ed326c

  6. July 23, 2025

    Solicitation

    Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice c9e0107cbdee40cc9fa78909cb97aacc

  7. July 30, 2025

    Solicitation

    Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice 1782773176234bf295d99eb0bd86c289

  8. July 31, 2025

    Solicitation

    Due August 11, 2025 at 3:00 PM EDT. SAM.gov, notice fcfcc0526a8047809e2f5d31c75a2eb0

Points of contact