Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Special notice

Notice of Intent to Sole Source HDL Turbine Runner Digital Unloader

W912EF26PA050

Department of the Army, Endist Walla Walla. Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables.

Response deadline

September 14, 2026 at 5:00 PM EDT

Closed 48 days ago. Posted September 9, 2026. Scheduled to archive September 29, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed 48 days ago

34 like it are open now in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables

All 34 open in instruments and related products manufacturing for measuring, displaying, and controlling industrial process variables

Description

As published on SAM.gov.

This requirement is for updating Lower Monumental Lock & Dam’s Governor Oil Pumps to replace the unloader valve assemblies on Main Units 1-3 Powerhouse Generators. Ice Harbor (HLD) Powerhouse Generator main units 1-3 require replacement of outdated analog governor oil pump unloaders with new solenoid-operated unloader. Each pump unloader at each unit should operate independent of the sister pump. Each pump has an instrument transformer located in the motor control bucket that will be used to control that pump’s unloader. All control equipment will be installed in a single cabinet for each unit. All equipment will be installed by USACE.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 9, 2026

    Special notice

    Due September 14, 2026 at 5:00 PM EDT. SAM.gov, notice 092b7900e7f7437bb71b69cd85122122

    1 revisions on SAM
    • September 9, 2026: publish, special notice