Sources sought
Little Goose Unit 3 Hub Shaft Repair
W912EF25RSS29
Department of the Army, US Army Engineer District Walla Wal. Other Heavy and Civil Engineering Construction.
Response deadline
June 5, 2025 at 2:00 PM EDT
Closed 515 days ago. Posted May 20, 2025. Scheduled to archive June 20, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
131 like it are open now in other heavy and civil engineering construction
- LARO 258755 - Replace Dilapidated Docks and Fuel S
National Park Service, DSC Contracting Services Division
SolicitationSmall businessNAICS 237990Washington140P2026R0003Closes in 9 daysNov 11 - NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1
Department of the Army, W071 Endist Portland
SolicitationNAICS 237990WashingtonW9127N27BA010Closes in 28 daysNov 30 - Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Department of the Navy, Navfacsyscom Northwest
SolicitationNAICS 237990Bremerton, WAN4425526R0005Closes in 29 daysDec 1
All 131 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The project involves sealing a known oil leak on a Kaplan turbine shaft hub, allowing Unit 3 to resume normal Kaplan operations. Little Goose Main Unit 3’s Kaplan turbine runner was forced out of service when the turbine was found to be leaking oil. The main scope of work for this contract addresses the leak found at the turbine shaft to hub flange. The o-ring between the top of the Kaplan hub and the shaft lower flange has failed at this location.
The work detailed will contain the runner leakage and route the leaked oil back to the static oil head. Instead of replacing the failed o-ring (requiring unit disassembly), this job seeks to contain leakage by sealing the outer diameter of the shaft flange where it meets the hub. It will also include welded caps for each coupling bolt, and piping at the shaft jacking bolts to contain leaking within the flange face and routing it back to the static oil head. The work will be completed with the unit partially disassembled (performed by government personnel) and confined to the turbine pit with limited egress.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 20, 2025
Sources sought
Due June 5, 2025 at 2:00 PM EDT. SAM.gov, notice fe53d7b70cbd4f4d845003c059601ba5
Points of contact
- Richard W. Bonnellrichard.w.bonnell@usace.army.mil
- Cynthia Jacobsencynthia.h.jacobsen@usace.army.mil5095277214