Special notice
Notice of Intent to Sole Source for MMD 42' Barge Rotating Group Repair
W912DW26Z1C7J
Department of the Army, W071 Endist Seattle. Ship Building and Repairing.
Response deadline
July 29, 2026 at 1:00 PM EDT
Closed 95 days ago. Posted July 30, 2026, first published July 20, 2026. Scheduled to archive August 13, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
96 like it are open now in ship building and repairing
- Maintenance, Repair, and Preservation of YRBM-50
Department of the Navy, Puget Sound Naval Shipyard Imf
SolicitationSmall businessNAICS 336611WashingtonN4523A26R1002Closes tomorrowNov 2 - Maintenance, Repair, and Preservation of YT-812
Department of the Navy, Puget Sound Naval Shipyard Imf
Sources soughtNAICS 336611WashingtonN4523A27Q1003Closes in 2 daysNov 3 - USCGC Calhoun Oil and Fuel Purifier
US Coast Guard, SFLC Procurement Branch 2
Combined synopsis and solicitationSmall businessNAICS 336611Anywhere in the US70z08526Q0027072Closes todayNov 1
Description
As published on SAM.gov.
LIMITED SOURCE JUSTIFICATION PURSUANT TO RFO 12.l02(a)
1. CONTRACTING AGENCY: U.S. Army Corps of Engineers, Seattle District (USACE)
2. DESCRIPTION OF ACTION: Approval is requested to utilize Thrust Masters of
Texas (TMOT) to install a new mechanical propulsion assembly within the propulsor of the
42' self-propelled barge Jackson and overhaul the assembly removed from the Jackson to
serve as a spare. TMOT is the Original Equipment Manufacturer (OEM) and does not grant
license or permission to other vendors to disassemble the propulsion assembly and
recommends that a TMOT service technician be present for any work within the propulsor.
3. DESCRIPTION OF SUPPLIES/SERVICES OR NATURE OF CONSTRUCTION:
The 25-year-old rotating group on the 42' Jackson vessel is experiencing consecutive propeller
seal failures rendering the vessel inoperable. This justification covers the acquisition of one (1)
new TMOT Rotating Group (Model B121287), the factory overhaul of the existing
Government-furnished legacy rotating group (Model C104916), and the services of an OEMcertified
technician to supervise the on-site removal and installation. The total estimated cost of
this action is $65,000.
Specific services are as follows:
• Procurement: One new Rotating Group (B121287), shipped to Mud Mountain Dam.
• Overhaul Service: Complete factory rebuild of the legacy Rotating Group (C104916),
including round-trip shipping.
• Technical Service: On-site supervision by a TMOT-certified technician for three (3) days
to oversee the teardown and installation process, ensuring warranty compliance.
4. AUTHORITY CITED: 10 USC 2304(c)(l) and RFO 12.lO2(a) Soliciting from a single
source, (i) For purchases not exceeding the simplified acquisition threshold.
5. REASON FOR AUTHORITY CITED:
Pursuant to RFO 13.101 (b ), "Contracting officers may solicit from a single source based on a
determination and findings (see subpart 1.5) that only one source is reasonably available (e.g.,
urgency, exclusive licensing agreements, brand-name or industrial mobilization).
TMOT is the Original Equipment Manufacturer (OEM) of the OD-150 TRNS propulsor unit
and its proprietary rotating group assembly.
1. Exclusive Expertise and Proprietary Data: TMOT is the only entity with the
proprietary drawings, tooling, and specific expertise required to overhaul the legacy
rotating group (C104916) to factory specifications. The manufacturer has stated that a
full inspection of the unit housing, prop shaft, and motor, along with the proper
pressure and operational tests, can only be performed at their facility. No third-party
vendors are licensed or authorized to perform this work.
2. Warranty Preservation: TMOT has stipulated that the warranty for both the new and
overhauled units is contingent upon correct installation. While self-installation is
Page 1 of3
CONTRACTING OFFICER CERTIFICATION:
I hereby certify to the best of my knowledge this justification is accurate and complete.
LIMITED SOURCE JUSTIFICATION PURSUANT TO FAR 13.l0l(a)
FAIR AND REASONABLE COST DETERMINATION:
I hereby determine that the anticipated cost or price to the Government for this contract action
will be fair and reasonable based on publicly-available pricing data and available historical
prices paid for the same or similar item.
APPROVAL
Based on the foregoing justification, I hereby approve the procurement of services to operate the
smolt trap on the Green River on an other than full and open competition basis pursuant to RFO
12.102 (a) Restricting competition "For acquisitions valued at or below the simplified
acquisition threshold(SAT), the decision must be documented that only one source is available
and the basis for the decision. Soliciting from a single source is subject to availability of funds
and provided the property herein described has otherwise been authorized for this acquisition.
Page 3 of3
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 20, 2026
Special notice
Due August 4, 2026 at 1:00 PM EDT. SAM.gov, notice a9ac6e431bec47a69f4c57e10013c44d
2 revisions on SAM
- July 31, 2026: publish, special notice
- July 20, 2026: publish, special notice
July 31, 2026
Special notice
Due July 29, 2026 at 1:00 PM EDT. SAM.gov, notice bbd07db6dabb4a0bb3bca2a5a3280fa4
2 revisions on SAM
- July 31, 2026: publish, special notice
- July 20, 2026: publish, special notice
Points of contact
- Geraldine L. KempGeraldine.L.Kemp@usace.army.mil
- Shemekia McMillanShemekia.R.Mcmillan@usace.army.mil