Presolicitation
FY25 Willapa Bay Maintenance Dredging
W912DW25Z157S
Department of the Army, W071 Endist Seattle. Other Heavy and Civil Engineering Construction.
Response deadline
March 21, 2025 at 1:00 PM EDT
Closed 591 days ago. Posted March 5, 2025. Scheduled to archive April 5, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
128 like it are open now in other heavy and civil engineering construction
- LARO 258755 - Replace Dilapidated Docks and Fuel S
National Park Service, DSC Contracting Services Division
SolicitationSmall businessNAICS 237990Washington140P2026R0003Closes in 9 daysNov 11 - NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1
Department of the Army, W071 Endist Portland
SolicitationNAICS 237990WashingtonW9127N27BA010Closes in 28 daysNov 30 - Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Department of the Navy, Navfacsyscom Northwest
SolicitationNAICS 237990Bremerton, WAN4425526R0005Closes in 29 daysDec 1
All 128 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing to the Point of Contact(s) indicated below.
Construction Project:
Pre-solicitation Notice Number: W912DW25Z157S The magnitude of construction is estimated to be between $1,000,000 and $5,000,000. The resulting contract will be firm-fixed-price.
FY25 Willapa Bay Maintenance Dredging Project Details: USACE Seattle District has a need for a construction dredging, project entitled FY25 Willapa Harbor Maintenance Dredging, Willapa Harbor, WA at three federal navigation features in Willapa Bay, Washington:
(1) the entrance to Tokeland Marina;
(2) the entrance channel to Nahcotta; and (3) the Bay Center entrance channel and basin. The work is anticipated to begin in July 2025 and all in-water work must be completed by 15 Feb 2026. The project will require dredging via mechanical (clamshell) means to remove approximately 180,000 CY of accumulated sediment across the three project features. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft MLLW (Tokeland).
In addition, dredging of approximately 10,000 CY may be required to a minimum depth of -9 ft MLLW in the Palix River thalweg to ensure sufficient water depths for the dredge, scow, and tugboats to transit to/from Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom-dump barge at the Cape Shoalwater and/or South Channel open-water disposal locations within Willapa Bay.
The work window varies by project features, but ranges between 16 July through 15 Feb of any given calendar year for each specific project feature. The in-water work windows are as follows:
• Tokeland Marina: 16 July 2025 through 15 February 2026 • Nahcotta: 16 July 2025 through 01 February 2026 • Bay Center and Palix River: 16 July 2025 through 30 September 2025 Access to/from Willapa Bay requires transit of the Willapa Bar, an unmaintained and unprotected entrance from the Pacific Ocean with dynamic shoals, strong tidal currents, and challenging weather conditions.
Furthermore, marine transit within Willapa Bay between project features and dredged material disposal sites requires transit through similar unmaintained and often shallow water depths. Potential risk exists for vessel groundings or accidents. Aids-to-Navigation across the Willapa bar have been removed as they are no longer reliable due to dynamic shoaling conditions. In all locations, shoals are present and shift depending on environmental conditions including tides and storms.
This performance window includes the worst season for storm and marine conditions. Contractors should expect difficult mobilization, demobilization, and construction conditions. See the forthcoming solicitation for details about bid submission and virtual bid opening. The NAICS code for this procurement is 237990, Dredging and Surface Cleanup, and the associated small business size standard is $37,000,000 in average annual receipts. Offerors are responsible for checking for any update(s) to the Notice/Solicitation.
The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this notice, you must log in to www.beta.SAM.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the ‘Add Me to Interested Vendors’ button in the listing for this solicitation on www.beta.SAM.gov.
IMPORTANT NOTICE: All contractors proposing on Department of Defense (DoD) solicitations must be registered in the System for Award Management (SAM) database prior to award of a contract. The purpose of this database is to provide basic business information and capabilities to the Government. The SAM website can be accessed at www.sam.gov. Contractors are encouraged to register as soon as possible. All new contracts can be made ONLY to contractors who are registered in SAM. This requirement applies to all DoD contract awards.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 5, 2025
Presolicitation
Due March 21, 2025 at 1:00 PM EDT. SAM.gov, notice 8c73bd83156c4405aa9aeef2bf27f5db
Points of contact
- Geraldine L. KempGeraldine.L.Kemp@usace.army.mil
- Scott Brittscott.w.britt@usace.army.mil