Indian Health Services (IHS) Makah Sewer Outfall, Neah Bay, WA
W912DW-25-R-0ZPQ_SS
Department of the Army, W071 Endist Seattle. Commercial and Institutional Building Construction.
Response deadline
February 21, 2025 at 4:00 PM EST
Closed 620 days ago. Posted January 21, 2025. Scheduled to archive March 8, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
191 like it are open now in commercial and institutional building construction
- SOURCES SOUGHT FOR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR PROJECTS UNDER NAICS 236220 LOCATED WITHIN THE NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (NAVFAC) NORTHWEST AREA OF RESPONSIBILITY.
Department of the Navy, Navfacsyscom Northwest
Sources soughtSmall businessNAICS 236220Bremerton, WAN44255-27-R-6003Closes todayNov 3 - SOURCES SOUGHT NOTICE FOR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) JOB ORDER CONTRACT (JOC) FOR GENERAL CONSTRUCTION WITHIN THE NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (NAVFAC) NORTHWEST AREA OF RESPONSIBILITY (AOR)
Department of the Navy, Navfacsyscom Northwest
Sources sought8(a)NAICS 236220WashingtonN44255-27-R-6000Closes todayNov 3 - Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222
Department of the Army, W071 Endist Seattle
Closes in 9 daysNov 12
All 191 open in commercial and institutional building construction
Description
As published on SAM.gov.
The existing Sewer Outfall pipe (the portion of the pipe in the sea) was constructed in 1995. The 14’’ diameter high density polyethylene pipe (HDPE) extends about 3,500 ft from the shore into the Strait of Juan de Fuca, along the bottom of the bay, and ends at a depth of about 45 ft of water. Previous pipe anchor repairs were performed on the outfall pipe in 2016 where they repaired the anchors using revetment blankets to keep the pipe secured to the sea floor.
On 21 May 2021, an inspection of the sewer outfall identified that a short section (estimated to be 260 ft) of the foreshore sewer outfall had broken free from the anchorage and was floating. A subsequent site inspection performed by IHS on 22 July 2024 determined that the floating pipeline was no longer present and had completely broken free. USACE performed a survey to collect bathymetry data on 19 September 2024 to identify gaps in the pipe. It has been determined that the pipeline will be replaced.
Period of Performance (POP) is expected to be 120 days. The project will replace 2,800 LF of HDPE, from flange stationed at 8+60 to diffuser stationed at 35+80, with an anchor structure designed to withstand the tidal forces of the area.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 21, 2025
Sources sought
Due February 21, 2025 at 4:00 PM EST. SAM.gov, notice 07380ad76cf64bf5aee3cde6382d3700