Special notice, first published as sources sought
Notice of Intent - Sole Source Procurement for Wells Control System Upgrade at Fort Drum
W912DS-26-S-0018
Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.
Response deadline
February 26, 2026 at 2:00 PM EST
Closed 203 days ago. Posted March 18, 2026, first published February 12, 2026. Scheduled to archive April 17, 2026.
Description
As published on SAM.gov.
1.0 Introduction & Background This document provides the justification for using other than full and open competition for the procurement of control system hardware, software, and integration services for the wells control system upgrade project at Fort Drum. The project requires the expansion and modernization of the existing Supervisory Control and Data Acquisition (SCADA) system controlling the facility's water wells. The existing wells are operated by a proprietary control system.
To maintain operational integrity, system stability, and cybersecurity posture, the new controls must seamlessly integrate with the incumbent manufacturer's platform. 2.0 Justification for Other Than Full and Open Competition 2.1 Authority Cited The proposed procurement is justified under the authority of FAR 6.302-1, "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements."
This authority is applicable because the required supplies and services must be procured from a specific manufacturer to ensure compatibility with the existing installed infrastructure, thereby avoiding substantial duplication of cost and unacceptable delays.
2.2 Description of Supplies/Services The required supplies and services include proprietary programmable logic controllers (PLCs), input/output (I/O) modules, SCADA software licenses, and the associated engineering services for programming, configuration, and integration. These components must be fully compatible with the existing Fort Drum wells control system, which is based on the Trane platform.
Only this manufacturer and its authorized representatives can provide the hardware, firmware, and software required to expand the system without compromising its integrity while maintaining the full functionality required by the Fort Drum licensed water operator. 2.3 Demonstration of Sole Source Necessity The existing SCADA system for the wells at Fort Drum is a highly integrated and proprietary platform.
Key components, including the central servers, communication protocols, and programming environment, are specific to the incumbent manufacturer. Awarding a contract to another source would prevent the new well controls from integrating into the existing system for the following reasons:
Proprietary Architecture: The system's communication bus and software are not open-protocol, preventing third-party controllers from being recognized or functioning within the established network.
Data Analysis: The system’s proprietary data analysis would be unable to fully integrate with non-Trane equipment.
Data & Alarm Consistency: An alternative system would be unable to integrate into the existing alarm, trending, and historical data logging schemas, creating operational inefficiencies and information gaps.
Cybersecurity: Introducing a different platform would require a completely new cybersecurity evaluation and Authority to Operate (ATO), creating a separate, less secure control network or a risky and unproven integration gateway. 2.4 Rationale for Substantial Duplication of Cost Utilizing a different controls manufacturer would result in substantial duplication of costs that would not be recovered through competition. These sunk costs would include:
System Replacement: A wholesale replacement of the existing central SCADA servers, operator workstations, and network hardware would be required.
Reprogramming: All existing sequences of operation for the current wells would need to be reprogrammed and recommissioned on the new platform.
Operator Training: Facility operators would need to be retrained on an entirely new system, leading to lost productivity and the potential for operational errors. These duplicated costs are estimated to far exceed any potential savings from a competitive procurement for the new expansion scope alone. 2.5 Rationale for Unacceptable Delays Introducing an alternate controls brand would cause unacceptable delays to a mission-critical utility infrastructure project. Specific delays would include:
Extended Redesign: The control system architecture would require a complete redesign to accommodate a new platform.
Complex Integration & Testing: Significant time would be spent developing and testing a new integration method, with no guarantee of success.
Commissioning Delays: Commissioning and functional performance testing would be significantly extended to validate the performance of a non-standard, multi-vendor system. These delays would jeopardize the project schedule and impact the operational readiness of the facility's water supply.
2.6 Market Research Market research confirmed that while multiple vendors manufacture control systems, no other vendor can provide components that are fully and seamlessly compatible with the proprietary architecture of the installed system at Fort Drum.
Research confirmed that any attempt to use an alternative would require the costly and time-consuming replacement of the existing system, validating the conclusion that only the incumbent manufacturer can meet the agency's requirements without causing unacceptable delays and cost duplication. 3.0 Conclusion Based on the technical constraints of the existing proprietary system, the only viable path to meet the government's needs is to procure controls from the incumbent manufacturer.
Therefore, a sole-source justification pursuant to FAR 6.302-1 is appropriate and necessary to ensure the successful, timely, and cost-effective completion of the Fort Drum wells control system upgrade.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 12, 2026
Sources sought
Construction of the ERCIP Wellfield Expansion at Fort Drum, NY
Due February 26, 2026 at 2:00 PM EST. SAM.gov, notice 4f21265d6da04896b8aeb690bb041142
March 18, 2026
Special notice, originally sources sought
Due April 2, 2026 at 2:00 PM EDT. SAM.gov, notice e7bf94ae51e941c2b32065099ce8ad33
Points of contact
- Brian Wintersbrian.h.winters@usace.army.mil
Also open from this buyer
- US Armed Forces Career Center - 3,750 RSF Rome NYPresolicitationNAICS 53131Rome, NYDACA51-5-26-003Closes in 4 daysSep 21
- DeLong Pier RepairPresolicitationNAICS 237990W912DS26BA035Closes in 8 daysSep 25
- Construction of the Power Generation with Microgrid at Joint Base McGuire-Dix-Lakehurst (JBMDL), New Hanover, NJSolicitationNAICS 236220New JerseyW912DS26BA032Closes in 11 daysSep 28
- Pituffik Space Base Project Delivery Method Market Research QuestionnaireSources soughtW912DS26S0045Closes in 15 daysOct 2