Sources sought, total small business set-aside
Maintenance Dredging of NY & NJ Channels, Arthur Kill 35’ Reach, Federal Navigation Project
W912DS26S0010
Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.
Response deadline
January 21, 2026 at 2:00 PM EST
Closed 285 days ago. Posted January 8, 2026, first published January 6, 2026. Scheduled to archive February 5, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
132 like it are open now in other heavy and civil engineering construction
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990New JerseyW912PM27BA004Closes todayNov 2 - GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes todayNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes todayNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
- Updated Set Aside: No Set aside used
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of New York and New Jersey Channels, Arthur Kill 35’ Reach, Federal Navigation Channel to a depth of -35 feet Mean Lower Low Water (MLLW) plus 1 foot of allowable overdepth. The proposed maintenance dredging would remove approximately 150,000 cubic yards (CY) of material from critically shoaled areas with subsequent placement at a contractor provided, state-permitted upland placement site(s).
Based on the past dredging projects within the New York Harbor / New York and New Jersey Channels, and restrictions in the New York State Department of Environmental Conservation / New Jersey Department of Environmental Protection Water Quality Certificates, the proposed work would be performed by utilizing a mechanical clamshell dredge with environmental bucket. Additionally, multiple barges, tugboats and survey vessels will be needed to perform the work during the dredging and placement activities. The dredging and placement would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located.
Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed and maintain an integrated production rate of at least 2,500 cubic yards per calendar day for the dredging and placement of the dredged material. The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.
The proposed work is anticipated to take place in the summer/fall of 2026 The magnitude of this contract is between $10,000,000 and $25,000,000.
SURVEY OF THE DREDGING INDUSTRY
The following confidential survey questionnaire is designed to apprise the Corps of prospective dredging contractors’ project execution capabilities. Please provide your response to the following questions. All questions are in regards to the New York and New Jersey Channels, Arthur Kill 35’ Reach, maintenance dredging project.
General
1. Have you ever worked on dredging jobs similar in nature to this project? If so, please describe the project and for whom the work was performed. Identify a point of contact and phone number, as a reference of relevant experience.
2. Have you previously performed dredging within the waters of New York and New Jersey?
3. What percentage of work (volume of material dredged, transported, and ultimately placed) can you perform with your own equipment or equipment owned by another dredging contractor?
4. Would you be willing to bid on the project described? If the answer is No, please explain why not.
5. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s), or as a joint venture?
6. Is there a dollar limit on the size of contract that you would bid? If so, what is that limit?
7. What is the largest dredging contract, in dollars, on which you were the prime contractor?
8. What is your bonding capacity per contract? What is your total bonding capacity?
9. Do you have experience using USACE Resident Management System (RMS) 3.0 for delivering Submittals, Daily Dredging Reports and Pay Estimates?
10. Do you have experience applying USACE EM 385-1-1 (March 2024) and all requirements? Deficiencies observed on site will require immediate attention and action to meet all applicable safety codes.
Equipment
11. What type of dredge equipment do you own and/or operate that is suitable for the work described? Do you own a mechanical dredge with a closed environmental clamshell bucket? Please list each piece of equipment capable of performing the work described, i.e. dredging, transfer, transportation, dewatering and/or other processing and final placement of the material. For each dredge that you list, please specify its bucket size(s), and any other salient characteristics.
12. Identify which dredge(s), including support equipment (tug, crew boat, scows, etc.), you would employ on this project. Also, for each dredge, identify the maximum dredging depth.
13. Do you own material scows? If so, how many do you have available for use? Please list the name of the scow, its type (ocean going, sealed-hull, etc.) and the capacity.
14. Will you be able to meet a production rate of 2,500 cubic yards per calendar day and complete all work?
15. Do you have experience with the use of an automated Dredged Material Monitoring System (Black Box/Silent Inspector) employing a Dredged Material Inspector (DMI)?
16. Are you aware that the Contractor is responsible for coordinating with the Federal Aviation Administration (FAA) for an FAA Obstruction Evaluation / Airport Airspace Analysis? Have you had any experience requesting for FAA Obstruction Evaluation / Airport Airspace Analysis? If so, please list the 3 most recent projects along with the project's NTP, the review submission date, the number of studies conducted, and duration of the review.
17. What are the minimum and maximum boom heights to operate your dredge(s) safely and efficiently?
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 7, 2026
Sources sought
Due January 21, 2026 at 2:00 PM EST. SAM.gov, notice 909adc80a02e4fedb38c551a0054f4ae
2 revisions on SAM
- January 8, 2026: publish, sources sought
- January 7, 2026: publish, sources sought
January 8, 2026
Sources sought
Due January 21, 2026 at 2:00 PM EST. SAM.gov, notice 6c78ec2434ac4e208b72723222403b16
3 revisions on SAM
- February 27, 2026: publish, presolicitation
- January 8, 2026: publish, sources sought
- January 7, 2026: publish, sources sought