Presolicitation
Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project
W912DS26BA015
Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.
Response deadline
May 12, 2026 at 12:00 PM EDT
Closed 128 days ago. Posted April 27, 2026, first published April 27, 2026. Scheduled to archive May 27, 2026.
Description
As published on SAM.gov.
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging and beach nourishment of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project, New York. The work consists of dredging the Fire Island Inlet Federal Navigation channel and deposition basin with subsequent placement of the dredged sand as nourishment along the designated feeder beach (Gilgo Beach, Suffolk County, New York).
The proposed dredging and beach nourishment work would involve dredging and placement of up to 2,500,000 CY of sand at Gilgo Beach, subject to available funding. The project is scheduled to be dredged across the channel and deposition basins to a depth of up to 14 feet plus 2 feet allowable over-depth, in order to satisfy the volume required to renourish the Gilgo Beach. The proposed work is a multi-purpose project that provides both a navigation channel and coastal storm risk management features.
The project will alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of the Fire Island Inlet by commercial and recreational boating interests while also providing renourishment to the nearby shoreline at Gilgo Beach. Between maintenance operations, the physically bypassed sand placed at the feeder beach would be carried by littoral drift to feed down drift beaches.
This project would thus serve to place sand trapped in the channel back into the normal littoral movement that naturally replenishes the western beaches and protect Ocean Parkway, while also restoring a safe channel for navigation. The proposed work can be accomplished by large pipeline dredge and must meet US Coast Guard criteria for an “ocean going vessel”.
The Contractor will be required to commence work within five (5) calendar days after the date of receipt by him of the notice to proceed, and to prosecute said work diligently and to complete the basic work ready for use not later than one hundred eighty (180) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain a placement production rate of at least 14,500 cubic yards per calendar day. The work is estimated to cost between $25,000,000 and $100,000,000.
Plans and specifications for the subject project would be available in June 2026, with bid opening in July 2026. It is the intention of the government to award in August and NTP in late September. Liquidated Damages of $2,770.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted Procurement.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Nicole C. Fauntleroynicole.fauntleroy@usace.army.mil9177906139
- Nicholas P. Emanuelnicholas.p.emanuel@usace.army.mil
Also open from this buyer
- US Armed Forces Career Center - 3,750 RSF Rome NYPresolicitationNAICS 53131Rome, NYDACA51-5-26-003Closes in 4 daysSep 21
- DeLong Pier RepairPresolicitationNAICS 237990W912DS26BA035Closes in 8 daysSep 25
- Construction of the Power Generation with Microgrid at Joint Base McGuire-Dix-Lakehurst (JBMDL), New Hanover, NJSolicitationNAICS 236220New JerseyW912DS26BA032Closes in 11 daysSep 28
- Pituffik Space Base Project Delivery Method Market Research QuestionnaireSources soughtW912DS26S0045Closes in 15 daysOct 2