Special notice
Advanced Notice- Maintenance Dredging of NY & NJ Harbor, Arthur Kill 50ft Reach
W912DS25BA002
Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.
Response deadline
March 8, 2025 at 2:00 PM EST
Closed 603 days ago. Posted February 21, 2025. Scheduled to archive March 23, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
132 like it are open now in other heavy and civil engineering construction
- GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes tomorrowNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes tomorrowNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990New JerseyW912PM27BA004Closes tomorrowNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of portions of the New York and New Jersey Harbor, Arthur Kill 50’ Reach, Federal Navigation Project. The dredged material would be processed and subsequently transported to and placed at a contractor furnished, State permitted upland placement site(s). The proposed maintenance dredging would remove approximately 100,000 cubic yards (CY) of selected critical shoals from the Arthur Kill 50’ Reach.
Dredging in this channel would be required to a depth of -50 feet Mean Lower Low Water (MLLW) plus 1 foot allowable overdepth. The dredged material is expected to consist primarily of silt and clay. Due to restrictions in the State Water Quality Certificates, the proposed work requires the use of a mechanical dredge with an environmental clamshell bucket. Additionally, multiple barges and tugboats will be needed to perform the work during the dredging, dewatering and unloading operations.
The dredged material will be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the placement site is located. All necessary permits required for the dredged material placement will be provided by the contractor to the government.
The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing, and final placement of dredged material, and shall submit evidence of such permits and approvals to the government. Bidders should consult the specifications for all submittal requirements.
Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,500 cubic yards per calendar day for the dredging, transportation, transfer, dewatering, processing, and final placement of the material.
The presence of dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. Plans and specifications for the subject project are expected to be available in April of 2025, with bid opening in May 2025. It is the intention of the government to award in June/July 2025 and the proposed work is anticipated to take place between August and October 2025. The work is estimated to cost between $10,000,000 and $25,000,000.
Liquidated damages of $3,215.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 21, 2025
Special notice, originally sources sought
Due March 8, 2025 at 2:00 PM EST. SAM.gov, notice 0c63fa8d97ea44b68e86510aa0c30c9d
Points of contact
- Denisse M. Sotodenisse.m.soto@usace.army.mil9177908177
- Mohenda R. Suragemohenda.r.surage@usace.army.mil9179408013