Presolicitation, total small business set-aside, first published as sources sought

North East River Maintenance Dredging, Cecil County, MD

W912DR26BA007

Department of the Army, W2SD Endist Baltimore. Other Heavy and Civil Engineering Construction.

Response deadline

June 30, 2026 at 11:00 AM EDT

Closed 79 days ago. Posted June 15, 2026, first published April 30, 2026. Scheduled to archive June 15, 2027.

Description

As published on SAM.gov.

The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location.

The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 30, 2026

    Sources sought

    Due May 15, 2026 at 11:00 AM EDT. SAM.gov, notice 5766f4a1aeaf4eca8fa7cd2a9dbc44c2

  2. May 19, 2026

    Sources sought

    Due May 26, 2026 at 11:00 AM EDT. SAM.gov, notice 8e1d28c0ea2e49f5a3e41e401430555f

  3. June 15, 2026

    Presolicitation

    Due June 30, 2026 at 11:00 AM EDT. SAM.gov, notice 0dc1aa6bfb86429e98ab07aa6ce22322

Points of contact