Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, PA

W912DR25RA039

Department of the Army, W2SD Endist Baltimore. Other Heavy and Civil Engineering Construction.

Response deadline

May 30, 2025 at 11:00 AM EDT

Closed 476 days ago. Posted May 14, 2025. Scheduled to archive June 14, 2025.

Description

As published on SAM.gov.

Project Scope:

1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.

2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.

3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required. The magnitude of construction is between $15,000,000 and $25,000,000. This solicitation will be available on or about 30 May 2025 from the Procurement Integrated Enterprise Environment (https://piee.eb.mil) website.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 14, 2025

    Presolicitation

    Due May 30, 2025 at 11:00 AM EDT. SAM.gov, notice 8ed5cf57bfbc4b61a72c4e6f4c716d4d