Award notice, total small business set-aside, first published as presolicitation
Dyke Marsh Restoration and Stabilization, Phase I Rehabilitation, Alexandria, VA
W912DR24B0007
Department of the Army, W2SD Endist Baltimore. Other Heavy and Civil Engineering Construction.
Awarded
Coastal Design & Construction, Inc.
$729,921.50 obligated so far on USAspending
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one was awarded in 2024
132 like it are open now in other heavy and civil engineering construction
- Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia
Department of the Army, W2SD Endist Norfolk
SolicitationNAICS 237990VirginiaW9123627BA003Closes in 20 daysNov 23 - Fort Eustis Dredge Material Management Area (FEDMMA)
Department of the Army, W2SD Endist Norfolk
SolicitationSmall businessNAICS 237990VirginiaW9123626BA008Closes in 28 daysDec 1 - Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia
Department of the Army, W2SD Endist Norfolk
Sources soughtNAICS 237990VirginiaW91236-26-B-1AVXCloses in 28 daysDec 1
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov with the solicitation of September 4, 2024.
ABSTRACT OF BIDS
Dyke Marsh Restoration and Stabilization, Phase I Rehabilitation, Alexandria, VAThe overall goal of the project is to protect and stabilize the tidal freshwater marsh and other associated wetland habitats that have been lost or impacted in the Dyke Marsh Wildlife Preserve on the Potomac River in Virginia. The project will protect the productive emergent wetlands that were dredged or lost to subsequent erosion. The project also seeks to maintain the integrity and health of the existing marsh.
Once completed, the project will allow the dynamic tidal freshwater Dyke Marsh Preserve to function, provide ecosystem services and wildlife habitat, and offer recreation opportunities. USACE have constructed Stone Sill to protect the shoreline in two phases. The project provided needed the stability of 45-50 acres of emergent marsh within Dyke Marsh Preserve giving the marsh resiliency against high storm surge and tidal events, thus protecting adjacent park and private real estate interests.
The Stone Sill installed under Phase 1 has settled since it was completed in January of 2020. National Park Service has requested that additional rock be added to the top of the sill so that it will function as designed. The purpose of this contract is to conduct rehabilitation work on the Stone Sill constructed under Phase 1, specifically add stone to the areas with settlement, and bring it back to its original design.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Coastal Design & Construction, Inc.
- UEI
- KG8DCEQ5NR34
- CAGE
- 0FD67
- Vendor location
- Gloucester, VA
- Contract
- W912DR25C0001, definitive contract
- Obligated
- $729,921.50, potential $875,816
- Actions
- 3 between October 15, 2024 and May 22, 2025
- Competition
- Full and Open Competition After Exclusion of Sources, 3 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Dyke Marsh Restoration and Stabilization, Phase I Rehabilitation, Alexandria, VA
- Match
- solicitation number W912DR24B0007 equals the FPDS solicitation identifier; same awarding office W912DR (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 17, 2024
Presolicitation, originally sources sought
Dyke Marsh Wetland and Restoration and Stabilization Phase I Sill Rehabilitation
Due June 6, 2024 at 11:00 AM EDT. SAM.gov, notice f33ee8f714374ca6b5b28bc3e6fafd2c
May 17, 2024
Presolicitation
Dyke Marsh Wetland and Restoration and Stabilization Phase I Sill Rehabilitation
Due July 6, 2024 at 11:00 AM EDT. SAM.gov, notice 452b8a87d6cd4584a4aea672ca07aa6e
May 17, 2024
Presolicitation
Dyke Marsh Wetland and Restoration and Stabilization Phase I Sill Rehabilitation
Due July 10, 2024 at 11:00 AM EDT. SAM.gov, notice cf305cb4a9b046cf852824f07ec652dc
June 6, 2024
Solicitation
Due July 9, 2024 at 11:00 AM EDT. SAM.gov, notice b1846ddea7094163b2502fcfe9270d9a
June 6, 2024
Presolicitation
Dyke Marsh Wetland and Restoration and Stabilization Phase I Sill Rehabilitation
Due July 9, 2024 at 11:00 AM EDT. SAM.gov, notice d0826e527df647ca98e671b0535b9db2
June 25, 2024
Solicitation
Due July 9, 2024 at 11:00 AM EDT. SAM.gov, notice 06c5aa36ef5641acb783c7107af40bc1
July 1, 2024
Solicitation
Due July 30, 2024 at 11:00 AM EDT. SAM.gov, notice 07313234848e4f07804422f59dea8d20
July 25, 2024
Solicitation
Due August 29, 2024 at 11:00 AM EDT. SAM.gov, notice 7a18bcbbaf464dc68212e3dbcd957291
August 13, 2024
Solicitation
Due September 4, 2024 at 11:00 AM EDT. SAM.gov, notice 4cd4da57af0a443bac7c231806c4550a
September 4, 2024
Solicitation
Due September 4, 2024 at 11:00 AM EDT. SAM.gov, notice f6bcb1cec82f47209e772a69509ea215
October 15, 2024
Award notice, originally solicitation
Awarded to Coastal Design & Construction, Inc. 6364 Allmondsville RD Gloucester for $949,100. SAM.gov, notice 75c6425b5af444f2bde5e22023d1892a
Points of contact
- Gary FaykesGARY.FAYKES@USACE.ARMY.MIL4109620192
- Aisha Boykinaisha.r.boykin@usace.army.mil4109624978