Solicitation, total small business set-aside
Install Eighty-Two (82) NIPR drops in 31 data outlets and additional Telecommunication Equipment in Bldg. T-126 on Fort Shafter, Hawaii
W912CN25QA009
Department of the Army, 0413 Aq HQ RCO-HI. Other Computer Related Services.
Response deadline
March 18, 2025 at 5:00 PM EDT
Closed 549 days ago. Posted March 12, 2025, first published February 28, 2025. Scheduled to archive April 2, 2025.
Description
As published on SAM.gov.
Contractor will provide personnel, management, tools, equipment, parts and materials, transportation and other items and services necessary to install Eighty-Two (82) NIPR drops in 31 data outlets and additional Telecommunication Equipment in Bldg. T-126 on Fort Shafter, Hawaii. Contractor will complete the following requirement(s) as stated below:
1. Install Two (2) NEW Trilogy DL2700IC 10 key digital lock with a Best Lock Core 7 Pin (SKU# BE/1C7-D1-626) 2. Install a NEW cut-to-fit 4’ X 8’ fire rated backboard for the NEW 4”, 2-hole, copper Primary Bus Bar (PBB) and bond to power panel using # 6 AWG grounding cable inside a ½” conduit. Label PBB and bonding cable 3. Convert existing Circuit #13 (Electrical Panel C) in the telecom room to a NEW L5-20R dedicated outlet and relocate to NEW 7-foot Telecommunication Rack.
Secure, Ground and Label rack to standard. 4. Remove & dispose of all existing voice & data patch panels, faceplates, boxes, voice & data cabling, drops, Panduit, telecom racks, cabinets, etc. 5. Repair & paint walls as needed. 6. Install & label a NEW 2-hole, copper Rear Bus Bar (RBB) to Rack and bond to PBB using # 6 AWG grounding cable.
7. Install & label two (2) NEW CISCO 9300-48P-A, 48 Port switches, two (2) power supplies (PWR-C1-715WAC-P & PWR-C1-715WAC-P/2) per switch, two (2) each SFP(SFP-10G-LR++=) per switch and two (2) 10G Network modules (C9300-NM-8x) inside the cabinet and bond each switch to RBB using # 6 AWG grounding cable. 8. Install & label two (2) NEW CAT6 48 port patch panels and four (4) NEW Synergy 24 Port Patch Box System (CAT6, Green) inside cabinet. 9. Replace/ Install four (4) ceiling tiles.
10. Install a NEW L5-20P to 5-20R Protection Distribution Unit (PDU) on rack. 11. Replace existing single mode patch cord from wall FOPP to a NEW, Single mode patch cord and plug into switch. Label patch cord 12. Install & Label eighty-two (82) NEW CAT6, green data drops in 31 data outlets. 13. Provide ninety-six (96) NEW CAT6, 10 feet patch cords to COR for NEW data drops. (see drawing) 14. Firestop/ Label all holes and annular spaces in the telecom room. 15. System installation will be a turn-key solution.
The COR will announce any changes at the site survey. Contractor shall label all drops and equipment according to the NEC Standardized Labeling Program.
Contractor shall abide by all TIA standards for Telecommunication installation. **Site visit scheduled for 11 March 2025 @ 0930 hrs. at bldg. T-126; POC Kyle Mishima 808-787-0491.** IAW FAR 52.237-1 (Apr 1984) Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable.
In no event shall failure to inspect the site constitute grounds for a claim after contract award. 1.INSTRUCTION TO OFFERORS – Vendors are to comply with the instructions cited in the PWS regarding submission of proposal which includes their project approach and provides a breakdown of labor and equipment costs. Labor should include listing of your work mix and labor rate. Equipment cost should include listing of proposed equipment and individual and total cost.
Cost should include all taxes/fees/lodging and travel expenses computed into the overall pricing. Proposal should clearly state the cost for labor and equipment separately for comparison. Proposal should include drawings supporting proposal solution for each of the three buildings. (Drawings for the proposal may be accomplished using AUTOCAD or POWERPOINT for the proposal.
2. EVALUATION – Award will be made based on technical approach described in the proposal and price. Award will be made to the lowest priced technically acceptable proposal based on the requirements of the PWS. Last day for submission of questions 14 Mar 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 28, 2025
Solicitation
Due March 14, 2025 at 5:00 PM EDT. SAM.gov, notice bdfd97b7e6ee4cdf86f96e359c25e5a7
March 6, 2025
Solicitation
Due March 18, 2025 at 5:00 PM EDT. SAM.gov, notice 55a10297abec42b5b7731476925144e6
March 12, 2025
Solicitation
Due March 18, 2025 at 5:00 PM EDT. SAM.gov, notice 015b4b2deefd4ce6a588d7bb7f46ccbe
Points of contact
- Alan Henrichsonalan.l.henrichson.civ@army.mil8087878815
- Chris Doylechristopher.s.doyle.civ@army.mil8087878836
Also open from this buyer
- Elevator Modernization SB B777, B778, and WAAF B901SolicitationNAICS 238990Schofield Barracks, HIW912CN-26-Q-A048Closes todaySep 18
- Drayage ServicesCombined synopsis and solicitationNAICS 484210Schofield Barracks, HIW912CN26QA049Closes in 4 daysSep 22
- Power Generation and Distribution Support for Staging OperationsSources soughtSchofield Barracks, HIW912CN-26-M-EC02Closes in 6 daysSep 24