Award notice, total small business set-aside, first published as combined synopsis and solicitation
3438 McMurdo Prefabricated Bridges
W912BU25QA001
Department of the Army, W2SD Endist Philadelphia. Fabricated Structural Metal Manufacturing.
Awarded
$1,592,330.00 obligated so far on USAspending
Description
As published on SAM.gov with the combined synopsis and solicitation of March 7, 2025.
7 March 2025:
Amendement 0001: Extended quote due date until Friday, 14 March 2025.
7 March 2025:
RFIs Answered:
Question 2: TL-3 guide rail system: Acceptability of erection and final assembly expectations: This particular rail system requires tensioning to be effective, and will not have complete integrity until fully assembled with the ends of the bridge in-place; is this understood by your team?
Answer 2: Performance requirements stated in the Statement of Work (SOW) for the bridge, while functioning as a bridge, will not be enforced until the bridge is fully installed and placed into service.
Question 3: TL-3 guide rail system: Acceptability of erection and final assembly expectations: During breakdown and transit of the bridge sections, is it acceptable to have these rails be removable?
Answer 3: The only requirement for transit is 1.m.: “All bridge components shall be capable of being packaged and shipped in standard 20-ft and/or 40-ft ISO shipping containers.” Question 4: TL-3 guide rail system: Acceptability of erection and final assembly expectations: During breakdown and transit of the bridge sections, is it acceptable to have these rails be folding?
Answer 4: The only requirement for transit is 1.m.: “All bridge components shall be capable of being packaged and shipped in standard 20-ft and/or 40-ft ISO shipping containers.” Question 5: ISO shipping containers: We'd like to explore the possibility of designing sections to deconstruct into the footprint of an ISO container, eliminating the need for insertion. Would your team consider this option?
Answer 5: The Statement of Work (SOW) is a very unique set of requirements; all designs and options will be considered.
Question 6: ISO shipping containers: The individual bridge sections will be difficult to load into a box that can only be opened on both ends and is covered on four sides, our ideal approach would be to design the bridge sections to 'fold' in a manner that allow them to become exactly like an ISO container shell to enable more efficient loading of remaining components and overall handling. Is this something your team would consider?
Answer 6: The Statement of Work (SOW) is a very unique set of requirements; all designs and options will be considered.
Question 7: ISO shipping containers: Does the 5,000lb provision under section 1 of the SOW apply to the loaded ISO container?
Answer 7: SOW Requirement 1.o states: “The bridge shall be capable of being erected, assembled and placed into final service location using a crane/load handling equipment with safe lifting capacity no greater than 5,000-lbs.” The 5,000lb provision in Requirement 1.o. refers to activities required to assemble of the bridge. The ISO Shipping Containers containing the bridge components will be transported and offloaded via cargo ship cranes with greater than 5000lb lifting capacity.
All erection, assembly, and placement into final service activities will not have access to the same cargo ship cranes and must be able to be completed with a crane/load handling equipment that is only capable of 5,000lb lifting capacity.
Question 8:
Provision 2 (SOW): Clarification on the requirement for one set of bridge launch equipment for cantilevered launch: Please provide more detail on this requirement; go-by's, sketches, etc. are most useful.
Answer 8: SOW Requirement 2 states: “The bridge supplier shall provide one set of bridge launch equipment for cantilevered launch.” The bridges will be used by trucks to traverse between a barge, being used as a floating pier in Winter Quarters Bay at McMurdo Station Antarctica, and the ice wharf on Ross Island, where cargo ship unloading and staging operations will be performed.
Due to the remote nature of the location of use, there is no access to cranes with lifting capacity greater than 5,000lbs for use in assembling, erecting, and placing the bridge across the gap. The gap that the bridge must traverse is ~100ft, between the barge/floating pier and the wharf. The bridge must be placed over that gap using a cantilevered launch system.
The cantilevered launch system will allow the bridge to be fully assembled on the ground on the wharf, and then slide off the side of the wharf and cantilevered across the gap between wharf and barge/floating pier, until it can be secured to the barge/floating pier. It is envisioned that the “bridge launch equipment” stated in the requirement includes some kind of launch tail, launch nose, and/or base plate that the bridge will slide on/off of and provide stability when the bridge is cantilevered across the gap.
Both bridges must be able to be launched with 1 set of “bridge launch equipment”, and so the bridge launch equipment cannot be part of the design of the bridge, as it must be reused between completion of launching bridge 1 and starting to launch bridge 2. Question 9:
Provision 3 (SOW): Clarification on the requirement for three full military tool kits: Please provide more detail on this requirement; what differentiates this from other tools that would be employed in cold-weather service to aid in erection and disassembly of this structure.
Answer 9: SOW Requirement 3 states: “The bridge supplier shall provide three full military tool kits required to assemble the bridges, launch tail and/or nose and to facilitate the launching of the bridges.” The bridges will be assembled by the US Naval Construction Battalion (USN Seabees) at McMurdo Station in Antarctica.
The remote nature of this project requires that 3 sets of each tool kit be provided for use to increase the speed of assembly and as backups in case tools are broken, damaged, lost, missing, etc. Safety of the tool operator must be taken into account when deciding which tools can be used, including but not limited to exposure to Antarctic weather and ability to be used while wearing cold-weather personal protective equipment. Tools must be able to be operated under extremely cold temperatures and windy conditions.
Discussion and clarification between choosing the best tools to include in the tool kit can be discussed during negotiation and finalized post-award, however all potential costs shall be included in the proposal.
25 February 2025:
RFI Answered:
Question 1: Do you have any plans or a geotechnical report for the bridge? The SOW sounds like just a material quote, do you also need superstructure and abutment design as well?
Answer 1: The Government is not providing any geotechnical reports at this time. As outlined in the SOW, the Government will design the necessary foundations/abutments for the bridge to be installed on. The bridge supplier is responsible for providing engineering information and coordinating with the Government engineering team with regards to foundations and installation. The Government will be responsible for erecting the bridge components and installing the bridges.
The Philadelphia District of the Army Corps of Engineers on behalf of the Marine Design Center is soliciting for two prefabricated bridges for the National Science Foundation Offload Infrastructure Project – McMurdo Station Antarctica. See attachments for full specifications and instruction. Quotes shall be due to Katie Sayers at Katie.L.Sayers@usace.army.mil and Michael Hunter at Michael.J.Hunter@usace.army.mil no later than 10 March 2025 at 1:00 PM EST. No hard copies will be accepted.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Acrow Corporation of America
- UEI
- EYG3CNKQ5PB5
- CAGE
- 0V4D3
- Vendor location
- Parsippany, NJ
- Contract
- W912BU25CA004, definitive contract
- Obligated
- $1,592,330.00
- Actions
- 1 between April 21, 2025 and April 21, 2025
- Competition
- Competed Under SAP, 2 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- MDC 3438 Mcmurdo Prefabricated Bridges
- Match
- award number W912BU25CA004 equals the contract number; same awarding office W912BU (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 24, 2025
Combined synopsis and solicitation
Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice 0542c14521464361abe39746ef132913
February 25, 2025
Combined synopsis and solicitation
Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice c077b38919a641d5a0556d1be407fa92
March 7, 2025
Combined synopsis and solicitation
Due March 14, 2025 at 1:00 PM EDT. SAM.gov, notice 30fe3e2ba37a4e97a1063db98d50e725
March 7, 2025
Combined synopsis and solicitation
Due March 14, 2025 at 1:00 PM EDT. SAM.gov, notice 8fd40dbf99434529aba0295a6df87fd9
May 2, 2025
Award notice, originally combined synopsis and solicitation
Awarded to ACROW CORPORATION OF AMERICA Parsippany for $1,592,330. SAM.gov, notice 9482c38ad3604de29c1c719ce1d90bb0
Points of contact
- Katie SayersKatie.L.Sayers@usace.army.mil
- Michael J. Huntermichael.j.hunter@usace.army.mil
Also open from this buyer
- MDC 3372 Key Woods Towboat ReplacementSolicitationSmall businessNAICS 336611W912BU26BA033Closes in 4 daysSep 21
- 3553 CEMDC CELRE Procurement of Stoplog Barges - W912BU26BA034Combined synopsis and solicitationSmall businessNAICS 336611W912BU26BA034Closes in 8 daysSep 25
- Detection Sciences Testing and Applied Research (DSTAR)Sources soughtNAICS 236220Egg Harbor City, NJW912BU26TDSTRCloses in 14 daysOct 1
- Fort Mifflin Sewage Lift StationSolicitationSmall businessNAICS 237110W912BU26BA028Closes in 21 daysOct 8
- Power Construction and Services II (PCS II) MATOCSolicitationNAICS 237130W912BU26RA032Closes in 26 daysOct 13