Removal of the Bloomsbury Dam on the Musconetcong River, New Jersey
W912BU241234
Department of the Army, W2SD Endist Philadelphia. Other Heavy and Civil Engineering Construction.
Response deadline
January 22, 2024 at 5:00 PM EST
Closed 1016 days ago. Posted January 11, 2024. Scheduled to archive February 6, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
129 like it are open now in other heavy and civil engineering construction
- P110 CAPE CANAVERAL RAILHEAD AND TRANSFER FACILITIES AT KENNEDY SPACE CENTER, FLORIDA
Department of the Navy, Navfacsyscom Southeast
PresolicitationNAICS 237990Merritt Island, FLN6945027R0006Closes tomorrowNov 4 - Bayou Meto Canal 1000, Phase 4.1, Check Structure
Department of the Army, W07V Endist Memphis
Sources soughtNAICS 237990ArkansasW912EQ27S0003Closes in 2 daysNov 5 - GAOA Grizzly Bear Campground
Forest Service, Black Hills National Forest
SolicitationSmall businessNAICS 237990South Dakota127EAX27Q0004Closes in 2 daysNov 5
All 129 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
Removal of the Bloomsbury Dam on the Musconetcong River, New Jersey The U.S. Army Corps of Engineers Philadelphia District is seeking contractors for the Removal of the Bloomsbury Dam Project. The place of performance is the Musconetcong River located between the Borough of Bloomsbury (Hunterdon County) and Greenwich Township (Warren County), New Jersey.
The work to be completed consists of two major components: The breaching and removal of the Bloomsbury Dam down to the original river substrate and disposal of the demolition debris. The stabilization of the river banks and channel bottom adjacent to the dam and additional bank stabilization measures along the former impoundment upstream of the dam.
RELEVANT INFORMATION: The dam is approximately 7 feet high, 40 feet wide, and 170 feet long. The exterior of the structure is reinforced concrete. The interior is assumed to contain concrete, stone, and possibly the remnant of a former timber crib dam. Approximately 15,000-20,000 cubic yards of sediment is impounded behind the dam and is proposed for passive release to the downstream through a phased removal approach. No dredging of sediment or diversion of the river is proposed for construction.
Removal is estimated to occur in 2 phases and will require flexible timelines due to the uncertainty of river flows and sediment movement. Construction will require monitoring and adaptive management for sediment movement, turbidity, and archaeological resources. Pre-construction may require aquatic mussel presence/absence surveys and relocation of mussels.
GENERAL DESCRIPTION OF WORK: The contractor will install and maintain construction access drives and staging areas in two locations. The first is on a former industrial facility directly adjacent to the dam, and the second is on a residential property (Block 30, Lot 7) approximately 1,000 feet upstream of the dam. The contractor will remove a majority of the dam and a portion of the existing retaining wall down to the original river substrate and dispose of the demolition debris.
Sections of the dam (approximately 10 feet in length) will be left intact near the river banks and stabilized with rock to maintain the integrity of the existing abutments. Additional stabilization with rock, geotextile, embedded root wads with duckbill anchoring, etc., will be performed along the river banks for approximately 250 linear feet along both sides of the dam, as well stabilization using an imbricated wall consisting of stacked quarry stone, rock and geotextile at select upstream properties.
In-stream stabilization structures will also be constructed, which may include boulder clusters for fish habitat creation. The former mill race on the north side of the river will be filled and stabilized as riparian habitat. All disturbed areas will be stabilized with temporary and/or permanent native vegetative cover.
SPECIALIZED EXPERIENCE: Contractor must demonstrate past performance and success in completion of at least 5 dam removal projects with at least one in the past 5 years, that are similar to this project in size, scope, and dollar value. Contractor must demonstrate expertise in construction projects occurring in a dynamic riverine environment. Contractor must demonstrate experience with a construction schedule and scheduling software. Contractor must demonstrate successful past performance evaluations. Contractor must demonstrate a satisfactory safety record.
PERIOD OF PERFORMANCE: The contract will have an estimated 365 calendar day completion requirement. The contract is anticipated to include phases of construction which will require flexibility due to uncertain river flows and sediment movement. Regulatory environmental windows may impact the period of performance. The contract is expected to be awarded in September 2024. The estimated cost of construction is between $3,000,000, and $6,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 11, 2024
Sources sought
Due January 22, 2024 at 5:00 PM EST. SAM.gov, notice 130a80bf8d84495e8bbbbbc3096cba30