Solicitation, total small business set-aside
Fort Peck, Montana Boundary Fence Construction
W9128F25QA098
Department of the Army, W071 Endist Omaha. All Other Specialty Trade Contractors.
Response deadline
September 18, 2025 at 5:00 PM EDT
Closed 409 days ago. Posted September 15, 2025, first published September 4, 2025. Scheduled to archive October 3, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
15 like it are open now in all other specialty trade contractors
- Crane Services
Department of the Navy, NAVSUP FLC Jacksonville Erp
Sources soughtNAICS 238990Panama City Beach, FLN6883627Q0008Closes in 3 daysNov 4 - FTC Oklahoma City- Replace Jet Bridge
Federal Prison System / Bureau of Prisons, Fao
Sources soughtNAICS 238990Oklahoma City, OK15B51326PR000174Closes in 3 daysNov 4 - Sources Sought Installation Services of a Cable Rail Fence System
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 238990Anywhere in the US36C26127Q0132Closes in 3 daysNov 4
Description
As published on SAM.gov.
15 SEP UPDATE: NEW Questions and Answers; Also a drawing. Please see Attachments/Links.
12 SEP 2025 UPDATE: Responses to Questions:
1. Do any of the fence posts to be removed include concrete that they have been buried in.
Answer: Fort Peck is not aware of that.
2. Is there a diagram for the steel gate(s)?
Answer: No but an example spec can be provided.
3. What length should the 5" in-line post be?
Answer: Minimum 10’
4. Will t-posts and wood line posts be set in concrete or can they be driven?
Answer: T-post can be driven wooden line post may require holes to be dug with post hole digger due to soil conditions or can be driven with hydraulic driver.
5. The contract documents specify a metal post to be used in concrete for gate braces. What length of post will this be?
Answer: If talking about deadman for gate bracing minimum 3’
6. Will the government stake the fence line or is it exactly where the old fence will be removed?
Answer: It is exactly where the fence is to be removed.
7. Specs are in the PWS (SOW Fence) in Section 5, please see Attachments/Links
8. Technical details are in the Technical Exhibit 2, please see PWS (SOW Fence) Attachments/Links
****************************************************************************************************************************
UPDATE 1: Extended Due Date: 18 September 2025.
UPDATE 2: Updated Price Schedule. This document will be used moving forward. Please see Attachments/Links section.
The Fort Peck project is in need of fencing on the boundaries of USACE property, installing and removal services on Fort Peck Project Lands in Valley and McCone Counties in Montana.
NOTE: DUE DATE will be 18 September 2025. An admendment to extend will be coming out next week.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Davis Bacon Wage Determination_McCone County MT20250076.txt14 KB, September 4, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 4, 2025
Solicitation
Due September 12, 2025 at 5:00 PM EDT. SAM.gov, notice 1a0fb4f559d045e5a7d781486489b516
5 revisions on SAM
- September 15, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 9, 2025: publish, solicitation
- September 4, 2025: publish, solicitation
September 9, 2025
Solicitation
Due September 18, 2025 at 5:00 PM EDT. SAM.gov, notice 959e910fa7804af0b8428a30d4d9d03d
5 revisions on SAM
- September 15, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 9, 2025: publish, solicitation
- September 4, 2025: publish, solicitation
September 12, 2025
Solicitation
Due September 18, 2025 at 5:00 PM EDT. SAM.gov, notice 3013c7905337407d9212b6ce4a4c63bd
5 revisions on SAM
- September 15, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 9, 2025: publish, solicitation
- September 4, 2025: publish, solicitation
September 12, 2025
Solicitation
Due September 18, 2025 at 5:00 PM EDT. SAM.gov, notice d4b2489700f64472b86280efd8e03006
5 revisions on SAM
- September 15, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 9, 2025: publish, solicitation
- September 4, 2025: publish, solicitation
September 15, 2025
Solicitation
Due September 18, 2025 at 5:00 PM EDT. SAM.gov, notice a45960b336a6461c94de4a5ad5255bba
6 revisions on SAM
- September 30, 2025: publish, award notice
- September 15, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 12, 2025: publish, solicitation
- September 9, 2025: publish, solicitation
- September 4, 2025: publish, solicitation
Points of contact
- Euemduan Osmeraeuemduan.c.osmera@usace.army.mil
- Marc Proiettomarc.proietto@usace.army.mil