Solicitation, total small business set-aside, first published as presolicitation
Fort Peck PH 1 Surge Tank Roof Replacement
W9128F25BA002
Department of the Army, W071 Endist Omaha. Roofing Contractors.
Awarded
$1,116,246.00 obligated so far on USAspending
Description
As published on SAM.gov.
BID ABSTRACT HAS BEEN UPLOADED INTO THE ATTACHMENT SECTION.
AMENDMENT 0003 FOR ACCEPTABLE BIDS IN STEP ONE THAT ARE TO STEP - TWO PRICING ARE AS FOLLOWED BELOW ONLY:
1. AOD RBT ROOFING JV;
2. A-VET ROOFING;
3. BLUE FROG ROOFING LIMITED;
4. TRADESMEN GROUP, LLC.;
5. TRI COAST CONSTRUCTION THE SPECIFICATION AND DRAWINGS ARE 100% COMPLETE IN THE ATTACHMENT SECTION AND AMENDMENT 0003 HAS BEEN INCLUDED IN THE ATTACHMENT SECTION. UPON SUBMITTING STEP-2 PRICING, ACKNOWLEDGE ALL AMENDMENT FROM STEP-1 AND STEP-2 WITH YOUR FINAL OFFER.
AMENDMENT 0002 PLUS AMENDMENT NARRATIVE, AM0002 01 12 00 FP PH1 SURGE TANK SPECS, AND AM0002 W9128F25BA002 4 OF 4 FP PH1 SURGE TANK REPAIR REFERENCE DRAWINGS ARE POSTED IN THE ATTACHMENT SECTION OF THIS SOLICITATION. ACKNOWLEDGEMENT OF ALL AMENDMENTS MUST BE PROVIDED WHEN SENDING IN STEP ONE AND STEP TWO OF THE OFFER.
AMENDMENT 0002 TO EXTEND THE SOLICITATION DUE DATE FROM 5 JUNE 2025 12 JUNE 2025 WILL BE POSTED TOMORROW MORNING.
AMENDMENT 0001 TO UPDATE THE 2100 INSTRUCTIONS. PLEASE REVIEW AND ACKNOWLEDGE THE AMENDMENT AND PROVIDE WHEN SENDING IN THE STEP-ONE TECHNCIAL APPROACH.
SITE VISIT SIGN IN SHEET POSTED.
This SOLICITATION is for W9128F25BA002. The U.S. Army Corps of Engineers, Omaha District intends to issue a Two-Step IFB solicitation for “Fort Peck PH 1 Surge Tank Roof Replacement”. The solicitation will close on or about 5 June 2024 by 2:00 PM CT. Step-One will be for the Technical only. NO pricing information will be provided during the Step-One process.
DESCRIPTION OF WORK: The Surge Tank roof of the Ft. Peck Powerhouse, constructed in the 1940s, requires restoration to its original design in compliance with Montana State Historical Preservation Office (SHPO) regulations. The project involves the complete removal of existing roofing layers, including felt and Ludowici Provincial clay tile shingles, and the replacement with new Ludowici tiles that match the original materials to ensure historical accuracy.
The roof, situated 272.48 feet above grade with an 8:12 slope and spanning 40 feet in diameter (2,500 square feet), currently features original clay tiles, 15-pound asphalt-impregnated waterproof felt with coal-tar pitch, and 2½" nailable precast concrete roof slabs secured with copper nails.
The restoration will replace the clay tiles, copper flashings, and potentially the asphaltic waterproofing, while preserving the structural integrity of the precast concrete panels and maintaining the historical character of the Ft. Peck Dam. Comprehensive documentation will be kept throughout the project to track all aspects of the restoration and ensure adherence to historical preservation standards.
Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation. Site Visit Date, Time and location is listed under FAR 52.236-27. Please respond to Mr. Zachary Watts your intent to attend the site visit.
MAGNITUDE OF CONSTRUCTION: The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.
Place of Performance: Fort Peck Dam, Valley County, Montana Contracting Office Address: USACE Omaha District 1616 Capital Ave, Omaha, NE 68102-4901 Point Of Contact: All questions regarding this pre-solicitation should be made to the Contract Specialist, Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database (https://sam.gov) exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM.
Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents.
SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendment current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update. Lynne Reed, who can be reached by email: lynne.d.reed@usace.army.mil.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Blue Frog Roofing Limited
- UEI
- SNSMZZH8J8D9
- CAGE
- 8QY21
- Vendor location
- Berthoud, CO
- Contract
- W9128F25CA051, definitive contract
- Obligated
- $1,116,246.00
- Actions
- 4 between September 2, 2025 and June 4, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 5 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Fort Peck PH 1 Surge Tank Roof Replacement Fort Peck Montana
- Match
- solicitation number W9128F25BA002 equals the FPDS solicitation identifier; same awarding office W9128F (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 18, 2025
Presolicitation
Due June 5, 2025 at 2:00 AM EDT. SAM.gov, notice 28a825fd9db5487993ff656594a49053
May 6, 2025
Solicitation, originally presolicitation
Due June 5, 2025 at 3:00 PM EDT. SAM.gov, notice ae772678f52c448fbb89a6832b10c8b3
May 19, 2025
Solicitation
Due June 5, 2025 at 3:00 PM EDT. SAM.gov, notice 912e5114f4f94648b39324e538278440
May 29, 2025
Solicitation
Due June 5, 2025 at 3:00 PM EDT. SAM.gov, notice 52a50974e992444a8a7d6291c76a009e
June 4, 2025
Solicitation
Due June 12, 2025 at 3:00 PM EDT. SAM.gov, notice 8f44e8ac11454c74b0565703dc7002df
June 5, 2025
Solicitation
Due June 12, 2025 at 3:00 PM EDT. SAM.gov, notice 62f44853ac154f498f60009eef550387
July 22, 2025
Solicitation
Due July 22, 2025 at 3:00 PM EDT. SAM.gov, notice 9969f97ed75047ffad653fb69f921666
Points of contact
- Lynne D. Reedlynne.d.reed@usace.army.mil4029952039
- Daniel D. Monahandaniel.d.monahan@usace.army.mil
Also open from this buyer
- Barge #600 Hydraulic Lines Replacement for Missouri River Project Office (MRPO)SolicitationSmall businessNAICS 811310Omaha, NEW9128F26QA097Closes tomorrowSep 18
- Real Estate Title Services for WIARNG MILCON Projects (W9128F26QA093)SolicitationSmall businessNAICS 541191PANNWD26P31831Closes in 4 daysSep 21
- Los Alamitos AASF Tank Repair MaintenanceSolicitationSmall businessNAICS 237120W9128F26RA060Closes in 5 daysSep 22
- Lease for office space - 2206 Sq Ft RequiredSolicitationNAICS 531120Madison, WIDACA455210013100Closes in 6 daysSep 23
- Sources Sought, PDB OTA, Water Cooling Pipes, Cavalier Space Force Station, NDSources soughtNAICS 238220W9128F26X1CGBCloses in 7 daysSep 24