Skip to content
Abierto

Presolicitation

DRAFT SOLICITATION: Lock Chamber Bulkhead Recess for 110-foot Stoplogs, Murray (7), Toad Suck (8), and Ormond (9), MKARNS

W9127S26R1AMZ

Department of the Army, W076 Endist Little Rock. Other Heavy and Civil Engineering Construction.

Response deadline

October 3, 2025 at 6:00 PM EDT

Closed 350 days ago. Posted September 19, 2025. Scheduled to archive September 19, 2026.

Description

As published on SAM.gov.

This is a DRAFT RFP for Lock Chamber Bulkhead Recess for 110-foot Stoplogs, Murray (7), Toad Suck (8), and Ormond (9). The intent of this RFP is to solicit and award all three (3) locks on one task order.

Magnitude of Construction: Between $50M and $70M. The DRAFT documents the Government is providing to the MATOC Pool includes Specifications, Drawings, and Evaluation Criteria. ProjNet is open for Bidder Inquiry submissions from 19 September until 3 October. The Inquiry Key is I5ZWBP-QAUM29. Site visits will take place on 25 September, beginning at 9:00 AM CDT at Ormond (9), followed by Toad Suck (8) at 12:00 PM CDT, and concluding at Murray (7) at 3:00 PM CDT. The timeline may adjust based on the needs of the group.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 19, 2025

    Presolicitation

    Due October 3, 2025 at 6:00 PM EDT. SAM.gov, notice 6818b4fec5304109abfaabd70bb2bb82

Points of contact