MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE

W9127N25BA007

Department of the Army, W071 Endist Portland. Other Heavy and Civil Engineering Construction.

Response deadline

October 22, 2025 at 2:00 PM EDT

Closed 331 days ago. Posted October 30, 2025, first published June 4, 2025. Scheduled to archive November 6, 2025.

Description

As published on SAM.gov.

30-OCT-25

Solicitation Amendment 0006: IN ACCORDANCE WITH FAR 14.404-1(C)(6), THE UNITED STATES ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT (USACE-NWP) IS CANCELLING SOLICITATION W9127N25BA007 IN ITS ENTIRETY.

22-OCT-25

Bid Abstract posted.

15-OCT-25

A DOCUMENT HAS BEEN ADDED TO THIS NOTICE, "Small Business Plan Template.docx". THIS IS NOT AN OFFICIAL OR REQUIRED TEMPLATE AND IS BEING PROVIDED FOR INFORMATION ONLY (FIO). OFFERORS ARE RESPONSIBLE FOR COMPLIANCE WITH 52.219-9 ALT II AS INCLUDED IN THIS SOLICITATION.

16-SEP-25

THE PURPOSE OF THIS AMENDMENT IS TO UPDATE THE CONSTRUCTION WAGE DETERMINATION WA20250123 DATED 09/12/2025. SEE SUMMARY OF CHANGES. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

09-SEP-25

THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE UPDATED AND CORRECT CUT/FILL REPORT SPREADSHEET CALCULATIONS TITLED "MSH SRS SECONDARY SPILLWAY RAISE - REVISED CUT FILL REPORT AMENDMENT 0004" TO REPLACE THE FORMER A9 VOLUME CALCULATIONS.

03-SEP-25

Solicitation Amendment 0003: THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE BID SUBMISSION DUE DATE TO 11:00 A.M PST ON 22-OCT-2025.

28-AUG-25

Solicitation Amendment 0002: THE PURPOSE OF THIS AMENDMENT IS TO ADD THE FOLLOWING FOR INFORMATION ONLY (FIO) HISTORICAL DOCUMENTS WITH PICTURES AND DRAWINGS. - FOUNDATION PREP AND TREATMENT 1991 FND REPORT - SRS RAISE FOUNDATION CONDITION_15OCT2012 The purpose of this amendment is to add the following for information only (fio) historical documents with pictures and drawings. - Foundation Prep and Treatment 1991 fnd Report - SRS Raise Foundation Condition_15OCT2012

25-AUG-25

Amendment 0001 has an updated Wage Determination. Also FIO from 1991 and 2012 respectively.

01-AUG-25

Added Plans: Vol II are the For Information Only (FIO) sheets showing previous work done for the SRS, including investigation, RCC and valvehouse (to decommission). The Vol II sheets only have previous work or existing conditions.

28-JUL-25

Plans have been uploaded. We have Modeling files for this solicitation that cannot be uploaded, please email me Andrew.J.Sprys@usace.army.mil and I can send these through DoD Safe.

24-JUL-25

Having difficulty trying to upload the plans/drawings but we're working on it and they will be available as soon as we are able.

Description of Requirement: The project purpose is to The U.S. Army Corps of Engineers, Portland District, has a requirement to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work.

This effort is to include all associated works required and described within this Contract package Project Background. The Sediment Retention Structure was constructed in the Late 80's to store the sediment coming off the avalanche area so that the sediment does not flow down to the low Cowlitz River. The main objective for the project is to keep the level of Protection on the levee systems from Castle Rock to Lexington.

There has already been one crest raise in 2012 and this will be the second of three planned crest raises. The project purpose is to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work.

This effort is to include all associated works required and described within this Contract package. The work will be located at the Sediment Retention Structure on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest.

Purpose: The project purpose is to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package.

The work will be located at the Sediment Retention Structure on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 4, 2025

    Sources sought

    Mt. St. Helens Sediment Retention Structure 2nd Crest Raise

    Due June 18, 2025 at 6:00 PM EDT. SAM.gov, notice 60312be842264b08860379e58d064360

  2. June 30, 2025

    Presolicitation

    Mt. St. Helens Sediment Retention Structure Crest Raise

    Due July 14, 2025 at 1:00 PM EDT. SAM.gov, notice 702d69482a834fc4ab5ea21a2287b614

  3. June 30, 2025

    Presolicitation

    Mt. St. Helens Sediment Retention Structure Crest Raise

    Due July 14, 2025 at 1:00 PM EDT. SAM.gov, notice f2fd030488fd4fbb81e7532a65b399e5

  4. July 23, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 569fdb52ea4f439787d814ab371f85cb

  5. July 24, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 42f4ed825828482cac811cabc541c92b

  6. July 25, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice e56f195eda19492d968e903f23438ee6

  7. July 28, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 1106350355be42afb5747bdafd837bdc

  8. July 28, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 645d59832d1b40f09b7b7364fbfce080

  9. July 28, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 81bcb8e43b384f538e3eb075fd3379d9

  10. August 1, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 9dcb99d34872431a8ac6bafc2b353f26

  11. August 14, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 1e64ec0a12d04d10a3912d99ec37c75e

  12. August 25, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 7d7638ea38854e409e31c114407f0561

  13. August 28, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 0d30d39c48a4403d84814c97085ec49e

  14. September 3, 2025

    Solicitation

    Due September 22, 2025 at 2:00 PM EDT. SAM.gov, notice 798409390f9247469793ecc3e820c216

  15. September 8, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice efcba7c11f564a3ba08b69797ff8dff9

  16. September 9, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice 7ad4a2e550e14653a7ac87898470650b

  17. September 16, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice 79e43792ba774e6abc88fc5d9483d3f2

  18. September 30, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice e52747c5df6e489eb501a973deed0885

  19. October 1, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice 61ccf96650484d1684e14312c7a37c64

  20. October 15, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice 7f655df220394d9fa1e483a4da195c7e

  21. October 22, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice d480572d21e048eba06af4b599943fa6

  22. October 30, 2025

    Solicitation

    Due October 22, 2025 at 2:00 PM EDT. SAM.gov, notice 520d7ca2c5934471ac74a58e7a9854a1

Points of contact