Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Fire Extinguisher Service

W9124M26QA025

Department of the Army, W6QM Micc-Ft Stewart. Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance.

Offers due

September 21, 2026 at 5:00 PM EDT

5 days from now. Posted September 14, 2026.

Description

As published on SAM.gov.

This is a solicitaion for a base plus four contract. The services is to maintain, inspect and test various fire extinguishers in multiple buildings on Hunter Army Airfield GA.  Please see attached PWS for detailed requirements, part 5 of PWS is outlined below.

Submission requirments. 

Filled out and signed SF 1449

Technical Proposal of the services

Quote broken down by CLINs

UEI and SBA certifications.

Questions are to be submitted until 1700 EST 17SEP2026

PART 5 SPECIFIC TASKS

5. Specific Tasks: Tasks will be performed in accordance with NFPA 10, AR 420-5, and OSHA regulations.

5.1. The Contractor shall execute quarterly service dispatches to inspect and remediate 100% of inventory fire extinguishers, ensuring correction of all deficiencies within 5 business days.

5.2. The required fire extinguisher periodic maintenance includes annual inspections, 5/6 years maintenance (depending on the extinguisher type), and 10/12-year hydrostatic testing (depending on the extinguisher type).

5.3. Pressurized fire extinguishers require the following services (inspection, maintenance, and/or hydrostatic testing).

5.4. New extinguishers require an initial inspection to confirm the weight, pressure, condition, and provide the record on an inspection tag; all conducted by qualified personnel.

5.5. Annual inspections/maintenance includes full mechanical check, weighing, and servicing by qualified personnel.

5.6. During 5/6 year maintenance, extinguishers must be disassembled, emptied, and serviced.

5.7. Hydrostatic testing involves the same process as 5/6 year maintenance with an addition structural test to ensure cylinder integrity.

5.8. 14 Days to perform service, unless an understanding is agreed upon between the unit POC, the contracting officer, and the contractor. In the event a unit is activated for deployment, the Government will not be responsible to pay for the quarterly services not used under the contract. The contractor will be notified by the COR, in writing, explaining the length of the deployment and the period during which services will not be required for a particular unit. The contractor will cease billing during the period during which services will not be required for a particular unit.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 14, 2026

    Combined synopsis and solicitation, originally presolicitation

    Due September 21, 2026 at 5:00 PM EDT. SAM.gov, notice d21f2c60c3764a8796a2de810f5f3d83

    2 revisions on SAM
    • September 14, 2026: publish, combined synopsis and solicitation
    • September 14, 2026: publish, presolicitation

Points of contact